Aspects of nepal's rural infrastructure project managment by bhim upadhyaya
Upcoming SlideShare
Loading in...5
×
 

Aspects of nepal's rural infrastructure project managment by bhim upadhyaya

on

  • 627 views

 

Statistics

Views

Total Views
627
Views on SlideShare
626
Embed Views
1

Actions

Likes
0
Downloads
15
Comments
0

1 Embed 1

http://www.linkedin.com 1

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Aspects of nepal's rural infrastructure project managment by bhim upadhyaya Aspects of nepal's rural infrastructure project managment by bhim upadhyaya Presentation Transcript

    • Aspects of Rural Infras Project Management
      Er. BhimUpadhyaya
      DDGDoLIDAR
      NASC class on Aspects of Rural Infras Project Managment 066.11.25
      1
    • Engineer & Engineering
      "Engineering is a great profession. There is the satisfaction of watching a figment of the imagination emerge through the aid of science to a plan on paper. then it moves to realization in stone or metal or energy. then it brings homes to men or women. then it elevates the standard of living and adds to the comforts of life. this is the engineer's high privilege."
      -Herbert Hoover (Er.) 31st President, USA
      2
      NASC class on Aspects of Rural Infras Project Managment 066.11.25
    • Engineer & Engineering
      "The great liability of the engineer compared to men of other professions is that his works are out in the open where all can see them. His acts, step by step, are in hard substance. He cannot bury his mistakes in the grave like the doctors. He cannot argue them into thin air or blame the judge like the lawyers. He cannot, like the architects, cover his failures with trees and vines. He cannot, like the politicians, screen his short-comings by blaming his opponents and hope the people will forget. The engineer simply cannot deny he did it. If his works do not work, he is damned."
      -Herbert Hoover, Engineer & 31st President, USA
      3
      NASC class on Aspects of Rural Infras Project Managment 066.11.25
    • Engineering
      "The story of civilization is, in a sense, the story of engineering- that long and arduous struggle to make the forces of nature work for man's good."
      --L Sprange DeCamp
      4
      NASC class on Aspects of Rural Infras Project Managment 066.11.25
    • NASC class on Aspects of Rural Infras Project Managment 066.11.25
      5
      Lecture Content
      Project: definition, cycle, party & phases
      Project Stakeholders, Functions, Environment,Phases, Tools
      Project Practice: Rural Infras.
      Responsibility Break-down
      Some relevant case-photographs
    • What is a Project(Public Works)?
      A Project has the following attributes…
      Objective or Goal
      Time
      Cost
      Location or space; and
      A Team-work of experts
      NASC class on Aspects of Rural Infras Project Managment 066.11.25
      6
    • A Project has mainly 3+1 Stakeholders: 4C's
      1.Client (or Employer)
      2.Consultant (or Engineer)
      3.Contractor (or Consumer Group)
      4.Consumer
      NASC class on Aspects of Rural Infras Project Managment 066.11.25
      7
    • Project Phases
      Study (Data collection & Need)
      Design Phase (Detailing for Goal)
      Development Phase (Input-Output Mngt.)
      Operation Phase (Service Mngt.)
      NASC class on Aspects of Rural Infras Project Managment 066.11.25
      8
    • NASC class on Aspects of Rural Infras Project Managment 066.11.25
      9
      Project Life cycle
    • NASC class on Aspects of Rural Infras Project Managment 066.11.25
      10
      Project Phases
    • NASC class on Aspects of Rural Infras Project Managment 066.11.25
      11
    • Work Break Down Structure
      NASC class on Aspects of Rural Infras Project Managment 066.11.25
      12
    • NASC class on Aspects of Rural Infras Project Managment 066.11.25
      13
      Work Break Down Structure
    • NASC class on Aspects of Rural Infras Project Managment 066.11.25
      14
      Gantt Chart
    • CPM
      NASC class on Aspects of Rural Infras Project Managment 066.11.25
      15
    • NASC class on Aspects of Rural Infras Project Managment 066.11.25
      16
      Seven Sectors of Local Infrastructure
      16
    • 17
      PROJECT Management Breakdown
      Detail Project Report
      • Selection, Walkover
      • EIRR,IEE, Resettlement
      • Land Acquisition
      • Detail Survey, Design
      • Estimate Approval
      PROCUREMENT
      MGMT,
      Goods,
      works,
      services
      PROJECT MGMT
      (Input & Output)
      Insurance
      DISBURSEMENT
      CONTRACT
      MGMT
      FINANCIAL
      MGMT
      Claim & Refund
      Mobilization
      Technical
      Audit
      QLTY/LAB
      MGMT
      QAP
      Contractors
      RBG, VIUG
      Consultants
      Reporting
      CONSTRUCTION
      MGMT
      SITE MGMT
      WORK PLAN
      payment
      in time
      NASC class on Aspects of Rural Infras Project Managment 066.11.25
    • Public Works Parties
      NASC class on Aspects of Rural Infras Project Managment 066.11.25
      18
      Standard 3 party Int'l Practice for large Works
      2 Party Nepali(Local Body) Practice for small and medium sized Works
    • Phases of Public Works
      NASC class on Aspects of Rural Infras Project Managment 066.11.25
      19
    • NASC class on Aspects of Rural Infras Project Managment 066.11.25
      20
    • NASC class on Aspects of Rural Infras Project Managment 066.11.25
      21
    • NASC class on Aspects of Rural Infras Project Managment 066.11.25
      22
    • 3 Parties Mutual Check and Balance
      NASC class on Aspects of Rural Infras Project Managment 066.11.25
      23
    • Supervisory Hierarchy
      NASC class on Aspects of Rural Infras Project Managment 066.11.25
      24
    • NASC class on Aspects of Rural Infras Project Managment 066.11.25
      25
      Aspects
      Drawing, Specification, Lab Tests, Qualified Supervisors
      Scheduling, Gantt, CPM, PERT
    • NASC class on Aspects of Rural Infras Project Managment 066.11.25
      26
    • NASC class on Aspects of Rural Infras Project Managment 066.11.25
      27
      Road ill-designed and in Disrepair
      • Poor-Maintenance and hardships
      • 12,000km un-operational road
      27
    • Good Quality works in progress
      NASC class on Aspects of Rural Infras Project Managment 066.11.25
      28
    • NASC class on Aspects of Rural Infras Project Managment 066.11.25
      29
      29
    • NASC class on Aspects of Rural Infras Project Managment 066.11.25
      30
      Road Construction Technologies
      30
    • NASC class on Aspects of Rural Infras Project Managment 066.11.25
      31
      Lab Facility
    • NASC class on Aspects of Rural Infras Project Managment 066.11.25
      32
      More than 12000 such TB Required
      32
    • NASC class on Aspects of Rural Infras Project Managment 066.11.25
      33
      33
    • NASC class on Aspects of Rural Infras Project Managment 066.11.25
      34
      Project Stakeholders
    • NASC class on Aspects of Rural Infras Project Managment 066.11.25
      35
      Project Environment
    • NASC class on Aspects of Rural Infras Project Managment 066.11.25
      36
      Cost Control through Time, Cost Control
    • NASC class on Aspects of Rural Infras Project Managment 066.11.25
      37
      Core Function of a Project
    • NASC class on Aspects of Rural Infras Project Managment 066.11.25
      38
      Scope, Time and Cost management for Success of Project
    • NASC class on Aspects of Rural Infras Project Managment 066.11.25
      39
      AnyQuestion