Aspects of nepal's rural infrastructure project managment by bhim upadhyaya

748 views
679 views

Published on

Published in: Business
0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
748
On SlideShare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
46
Comments
0
Likes
1
Embeds 0
No embeds

No notes for slide

Aspects of nepal's rural infrastructure project managment by bhim upadhyaya

  1. 1. Aspects of Rural Infras Project Management <br />Er. BhimUpadhyaya<br />DDGDoLIDAR<br />NASC class on Aspects of Rural Infras Project Managment 066.11.25<br />1<br />
  2. 2. Engineer & Engineering <br />"Engineering is a great profession. There is the satisfaction of watching a figment of the imagination emerge through the aid of science to a plan on paper. then it moves to realization in stone or metal or energy. then it brings homes to men or women. then it elevates the standard of living and adds to the comforts of life. this is the engineer's high privilege."<br /> -Herbert Hoover (Er.) 31st President, USA<br />2<br />NASC class on Aspects of Rural Infras Project Managment 066.11.25<br />
  3. 3. Engineer & Engineering<br />"The great liability of the engineer compared to men of other professions is that his works are out in the open where all can see them. His acts, step by step, are in hard substance. He cannot bury his mistakes in the grave like the doctors. He cannot argue them into thin air or blame the judge like the lawyers. He cannot, like the architects, cover his failures with trees and vines. He cannot, like the politicians, screen his short-comings by blaming his opponents and hope the people will forget. The engineer simply cannot deny he did it. If his works do not work, he is damned."<br /> -Herbert Hoover, Engineer & 31st President, USA<br />3<br />NASC class on Aspects of Rural Infras Project Managment 066.11.25<br />
  4. 4. Engineering<br />"The story of civilization is, in a sense, the story of engineering- that long and arduous struggle to make the forces of nature work for man's good." <br />--L Sprange DeCamp<br />4<br />NASC class on Aspects of Rural Infras Project Managment 066.11.25<br />
  5. 5. NASC class on Aspects of Rural Infras Project Managment 066.11.25<br />5<br />Lecture Content<br />Project: definition, cycle, party & phases<br />Project Stakeholders, Functions, Environment,Phases, Tools<br />Project Practice: Rural Infras.<br />Responsibility Break-down<br />Some relevant case-photographs <br />
  6. 6. What is a Project(Public Works)?<br />A Project has the following attributes… <br /> Objective or Goal<br /> Time<br /> Cost<br /> Location or space; and<br />A Team-work of experts<br />NASC class on Aspects of Rural Infras Project Managment 066.11.25<br />6<br />
  7. 7. A Project has mainly 3+1 Stakeholders: 4C's<br />1.Client (or Employer) <br />2.Consultant (or Engineer)<br />3.Contractor (or Consumer Group)<br />4.Consumer<br />NASC class on Aspects of Rural Infras Project Managment 066.11.25<br />7<br />
  8. 8. Project Phases<br />Study (Data collection & Need)<br />Design Phase (Detailing for Goal)<br /> Development Phase (Input-Output Mngt.)<br /> Operation Phase (Service Mngt.)<br />NASC class on Aspects of Rural Infras Project Managment 066.11.25<br />8<br />
  9. 9. NASC class on Aspects of Rural Infras Project Managment 066.11.25<br />9<br />Project Life cycle<br />
  10. 10. NASC class on Aspects of Rural Infras Project Managment 066.11.25<br />10<br />Project Phases<br />
  11. 11. NASC class on Aspects of Rural Infras Project Managment 066.11.25<br />11<br />
  12. 12. Work Break Down Structure<br />NASC class on Aspects of Rural Infras Project Managment 066.11.25<br />12<br />
  13. 13. NASC class on Aspects of Rural Infras Project Managment 066.11.25<br />13<br />Work Break Down Structure<br />
  14. 14. NASC class on Aspects of Rural Infras Project Managment 066.11.25<br />14<br />Gantt Chart<br />
  15. 15. CPM<br />NASC class on Aspects of Rural Infras Project Managment 066.11.25<br />15<br />
  16. 16. NASC class on Aspects of Rural Infras Project Managment 066.11.25<br />16<br />Seven Sectors of Local Infrastructure<br />16<br />
  17. 17. 17<br />PROJECT Management Breakdown<br />Detail Project Report<br /><ul><li>Selection, Walkover
  18. 18. EIRR,IEE, Resettlement
  19. 19. Land Acquisition
  20. 20. Detail Survey, Design
  21. 21. Estimate Approval</li></ul> PROCUREMENT<br />MGMT,<br />Goods, <br />works,<br />services<br />PROJECT MGMT<br />(Input & Output)<br />Insurance<br />DISBURSEMENT<br /> CONTRACT<br />MGMT<br />FINANCIAL<br />MGMT<br />Claim & Refund<br />Mobilization<br /> Technical<br />Audit<br /> QLTY/LAB<br /> MGMT<br /> QAP<br />Contractors<br />RBG, VIUG<br />Consultants<br /> Reporting<br />CONSTRUCTION<br /> MGMT<br /> SITE MGMT<br /> WORK PLAN<br /> payment<br /> in time<br />NASC class on Aspects of Rural Infras Project Managment 066.11.25<br />
  22. 22. Public Works Parties<br />NASC class on Aspects of Rural Infras Project Managment 066.11.25<br />18<br />Standard 3 party Int'l Practice for large Works<br />2 Party Nepali(Local Body) Practice for small and medium sized Works<br />
  23. 23. Phases of Public Works <br />NASC class on Aspects of Rural Infras Project Managment 066.11.25<br />19<br />
  24. 24. NASC class on Aspects of Rural Infras Project Managment 066.11.25<br />20<br />
  25. 25. NASC class on Aspects of Rural Infras Project Managment 066.11.25<br />21<br />
  26. 26. NASC class on Aspects of Rural Infras Project Managment 066.11.25<br />22<br />
  27. 27. 3 Parties Mutual Check and Balance<br />NASC class on Aspects of Rural Infras Project Managment 066.11.25<br />23<br />
  28. 28. Supervisory Hierarchy<br />NASC class on Aspects of Rural Infras Project Managment 066.11.25<br />24<br />
  29. 29. NASC class on Aspects of Rural Infras Project Managment 066.11.25<br />25<br />Aspects<br />Drawing, Specification, Lab Tests, Qualified Supervisors<br />Scheduling, Gantt, CPM, PERT<br />
  30. 30. NASC class on Aspects of Rural Infras Project Managment 066.11.25<br />26<br />
  31. 31. NASC class on Aspects of Rural Infras Project Managment 066.11.25<br />27<br />Road ill-designed and in Disrepair<br /><ul><li>Poor-Maintenance and hardships
  32. 32. 12,000km un-operational road</li></ul>27<br />
  33. 33. Good Quality works in progress<br />NASC class on Aspects of Rural Infras Project Managment 066.11.25<br />28<br />
  34. 34. NASC class on Aspects of Rural Infras Project Managment 066.11.25<br />29<br />29<br />
  35. 35. NASC class on Aspects of Rural Infras Project Managment 066.11.25<br />30<br />Road Construction Technologies<br />30<br />
  36. 36. NASC class on Aspects of Rural Infras Project Managment 066.11.25<br />31<br />Lab Facility<br />
  37. 37. NASC class on Aspects of Rural Infras Project Managment 066.11.25<br />32<br />More than 12000 such TB Required<br />32<br />
  38. 38. NASC class on Aspects of Rural Infras Project Managment 066.11.25<br />33<br />33<br />
  39. 39. NASC class on Aspects of Rural Infras Project Managment 066.11.25<br />34<br />Project Stakeholders<br />
  40. 40. NASC class on Aspects of Rural Infras Project Managment 066.11.25<br />35<br />Project Environment<br />
  41. 41. NASC class on Aspects of Rural Infras Project Managment 066.11.25<br />36<br />Cost Control through Time, Cost Control<br />
  42. 42. NASC class on Aspects of Rural Infras Project Managment 066.11.25<br />37<br />Core Function of a Project<br />
  43. 43. NASC class on Aspects of Rural Infras Project Managment 066.11.25<br />38<br />Scope, Time and Cost management for Success of Project<br />
  44. 44. NASC class on Aspects of Rural Infras Project Managment 066.11.25<br />39<br />AnyQuestion<br />Thank You<br />bhimupadhyaya@gmail.com<br />

×