Your SlideShare is downloading. ×
  • Like
Benjamin Pineda Professional photos
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Now you can save presentations on your phone or tablet

Available for both IPhone and Android

Text the download link to your phone

Standard text messaging rates apply

Benjamin Pineda Professional photos

  • 78 views
Published

 

Published in Career , Business
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
78
On SlideShare
0
From Embeds
0
Number of Embeds
0

Actions

Shares
Downloads
0
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. Photos - Benjamin PinedaBARCELONA AIRPORTAirport Visual Aids Facilities.Preparing the pavement recess. Aligning the light base assembly with therunway.Preparing the epoxy resin. Bidirectional inset light installed.Drilling the hole using a diamond bit.
  • 2. Photos - Benjamin PinedaThe wire ways have been sawed using a 3/8-in.thick diamond-faced saw.Preparing the surface of the pavement withan appropriate joint sealing fiber.Building the comb like groove conduits forthe runway and taxiway’s primary cabling.Preparing the comb like groove conduits.Preparing the Isolation Transformer Base. Power Regulator Chambers equipped with:MV and LV, air conditioning, fire system anddimmers switches for runway lights.
  • 3. Photos - Benjamin PinedaA services gallery for the primary cabling.Front view: Multifunctional building. Rear view: Multifunctional building.New Terminal Building in Barcelona Airport. Patching and wiring of communicationracks in the New Terminal of BarcelonaAirport.Preparing lights of a platform lamp.
  • 4. Photos - Benjamin PinedaVARIOUSThe Sant Esteve Sesrovires theatre. The new Formació i Treball headquarters,(Barcelona).Renovation works of Seu d’Urgell Hospital. Air conditioning and refrigerationequipment. Seu d’Urgell.Photovoltaic Power Station in LesBorgesBlanques village.Construction a solar tracker base. Les BorgesBlanques (Lleida).
  • 5. Photos - Benjamin Pineda22@ Buildings in Sant Cugat del Vallès(Barcelona).Drinking water equipment (22@ Buildings).Completed Metro Tunnel facilities. NewBarcelona Metro Line no.9.Advance drilling of MetroTunnel in theBarcelona Metro Line no.9.Provision and mounting of: high and mediumvoltage substations; control boards and cells,protection and measurement; high voltageelectric wiring. New Metro Line 9 of Barcelona.Backhoes loader hauling material on traintracks. New Barcelona Metro Line no.9.