Vwc Presentation2 13 2009
Upcoming SlideShare
Loading in...5
×
 

Vwc Presentation2 13 2009

on

  • 392 views

Slide show for Virginia Wesleyan

Slide show for Virginia Wesleyan

Statistics

Views

Total Views
392
Views on SlideShare
392
Embed Views
0

Actions

Likes
0
Downloads
0
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Vwc Presentation2 13 2009 Vwc Presentation2 13 2009 Presentation Transcript

      • Informational Presentation
      • For Virginia Wesleyan College
      • January 13, 2009, Friday at 11:30 a.m., Norfolk, Virginia
      • Presented By Irwin Kroskin and Preston Basnight, Principals and
      • Tom Beverly, AIA, Project Manager
      • For Architectural services
      • For Campus Renovations and Expansions
      6160 Kempsville Circle , Suite 316A Norfolk, Virginia 23502 Phone: 757-466-1109
    • Campus and Facilities
      • Phi-Beta Kappa-caliber Institution
      • Increased Maintenance Cost of older facilities
      • Future Housing 2009 –2010
      Upgrade projects
      • Long Range Activities
      • Blocker Hall enhancement
      • Classroom Modernization
      • Music and Theatre enhancement
      • Science building
      • Licensed Architects and Engineers Providing the Following Services:
      • Master Planning
      • Contract Documents
      • Specifications
      • Construction Phase Services
      • Universal Design, Earthcraft and LEED Certified
      • Project Management
      • Cost Estimating Throughout the Design
      • Value Engineering
      Design Services
    • Irwin M. Kroskin, Architect, Principal, LEED Ap Preston B. Basnight, Architect, Principal Thomas M. Beverly, Architect, Project Manager Personnel Russell W. Ludwig Construction Manager and Cost Estimator Keith Kindler Project Manager and Design Phase Services
    • Design Team
      • Surveyor and Civil Engineer:
      • C. Alan Bamforth
      • Structural:
      • Sinclair, Pratt, Cameron, P.C.
      • Mechanical, Electrical and Plumbing:
      • Cherwa-Ewing, P.C.
      • Interior and Space Planning:
      • Within Interior Design, Inc.
      • Geotechnical:
      • G.E.T., Inc.
    • Sample Projects
      • Feasibility studies of existing facilities
      • Adaptive re-use for short term living
      Gosnold Apartments Norfolk, Virginia Before After
    • Sample Projects
      • Full Service
        • Preliminary Site Layout
        • Preliminary Building Design
        • Design Development
        • Construction Documents
        • In-House Cost Estimating
        • Construction Phase Services
      South Bay Apartments Hamilton Place Apartments
    • Sample Project Group Home for special needs residents.
    • Residential Project 100 Efficiency units for “Wounded Warriors” with service related disabilities. Camp LeJeune, North Carolina Chester Village Green Apartments, Chester, Virginia
    • Future Trends
      • Increased cost of commuting
      • Increased use of the internet for students
      • Distance Educational diversity
      • Decentralized Educational Facilities
      • Housing for on-campus-seminars and short stay students
      • Maintain Resources