DISCOVERY
External Tank Arrives by Barge from MS
External Tank

Vertical Assembly Building
Removing
External Tank
From Carrier
External Tank Enters VAB
External Tank in VAB
Preparing to Lift the Tank to Vertical
Lifting Tank
Solid Rockets
Are Attached
Engines Are
Attached To
Solids
Engines Are Attached To The Shuttle In The Shuttle Processing Facility
Shuttle In Sling Ready For Lift In VAB
Shuttle Has Been
Moved To VAB And
And Will Be Attached
To External Tank
Shuttle is Attached
Payload
Preparation Room
(PPR)
Cargo Package For ISS
New Module For ISS
Payload Ready To
Be Moved to The
Launch Pad
Payload Carrier
Leaves PPR
Payload Being Moved To Launch Pad
Lifting Payload
Into Position For
Insertion Into
Discovery When
It Arrives At The
Pad
Shuttle Discovery Leaves VAB
Shuttle & Crawler

TRIP:
Length--- 3 ½ mi
Time--- 6-8 hours
Launch Pad
Crawler Control
DISCOVERY
ARRIVES
AT PAD
READY FOR
LAUNCH
We Have Lift Off
Discovery shuttle processing  NASA   before  launching the rocket by babasab patil
Discovery shuttle processing  NASA   before  launching the rocket by babasab patil
Discovery shuttle processing  NASA   before  launching the rocket by babasab patil
Discovery shuttle processing  NASA   before  launching the rocket by babasab patil
Discovery shuttle processing  NASA   before  launching the rocket by babasab patil
Discovery shuttle processing  NASA   before  launching the rocket by babasab patil
Discovery shuttle processing  NASA   before  launching the rocket by babasab patil
Discovery shuttle processing  NASA   before  launching the rocket by babasab patil
Discovery shuttle processing  NASA   before  launching the rocket by babasab patil
Discovery shuttle processing  NASA   before  launching the rocket by babasab patil
Discovery shuttle processing  NASA   before  launching the rocket by babasab patil
Discovery shuttle processing  NASA   before  launching the rocket by babasab patil
Discovery shuttle processing  NASA   before  launching the rocket by babasab patil
Discovery shuttle processing  NASA   before  launching the rocket by babasab patil
Discovery shuttle processing  NASA   before  launching the rocket by babasab patil
Discovery shuttle processing  NASA   before  launching the rocket by babasab patil
Discovery shuttle processing  NASA   before  launching the rocket by babasab patil
Discovery shuttle processing  NASA   before  launching the rocket by babasab patil
Discovery shuttle processing  NASA   before  launching the rocket by babasab patil
Discovery shuttle processing  NASA   before  launching the rocket by babasab patil
Discovery shuttle processing  NASA   before  launching the rocket by babasab patil
Upcoming SlideShare
Loading in...5
×

Discovery shuttle processing NASA before launching the rocket by babasab patil

1,395
-1

Published on

Discovery shuttle processing nasa before launching the rocket by babasab patil NASA

Published in: Education, Technology
0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
1,395
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
2
Comments
0
Likes
1
Embeds 0
No embeds

No notes for slide

Discovery shuttle processing NASA before launching the rocket by babasab patil

  1. 1. SHUTTLE PROCESSING (Before Flight Activities Rarely Seen By The General DISCOVER --Public) DISCOVERY
  2. 2. External Tank Arrives by Barge from MS
  3. 3. External Tank Vertical Assembly Building
  4. 4. Removing External Tank From Carrier
  5. 5. External Tank Enters VAB
  6. 6. External Tank in VAB
  7. 7. Preparing to Lift the Tank to Vertical
  8. 8. Lifting Tank
  9. 9. Solid Rockets Are Attached
  10. 10. Engines Are Attached To Solids
  11. 11. Engines Are Attached To The Shuttle In The Shuttle Processing Facility
  12. 12. Shuttle In Sling Ready For Lift In VAB
  13. 13. Shuttle Has Been Moved To VAB And And Will Be Attached To External Tank
  14. 14. Shuttle is Attached
  15. 15. Payload Preparation Room (PPR)
  16. 16. Cargo Package For ISS
  17. 17. New Module For ISS
  18. 18. Payload Ready To Be Moved to The Launch Pad
  19. 19. Payload Carrier Leaves PPR
  20. 20. Payload Being Moved To Launch Pad
  21. 21. Lifting Payload Into Position For Insertion Into Discovery When It Arrives At The Pad
  22. 22. Shuttle Discovery Leaves VAB
  23. 23. Shuttle & Crawler TRIP: Length--- 3 ½ mi Time--- 6-8 hours Launch Pad
  24. 24. Crawler Control
  25. 25. DISCOVERY ARRIVES AT PAD
  26. 26. READY FOR LAUNCH
  27. 27. We Have Lift Off