OPERATOR: BRITISH PETROLEUM LOCATION: LOMOND – CATS PLATFORM ...
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

OPERATOR: BRITISH PETROLEUM LOCATION: LOMOND – CATS PLATFORM ...

345
views

Published on


0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
345
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
4
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. OPERATOR: BRITISH PETROLEUM LOCATION: LOMOND – CATS PLATFORM, NORTH SEA INSTALLATION METHOD: ROPE ACCESS (NO SCAFFOLDING) CONTRACTOR: OIS ABERDEEN PRODUCT: RETROWRAP HD (6.25mm) HIGH TEMPERATURE 508mm GAS RISER NO. PL780 219mm DIAMETER CONDENSATE RISER NO. PL781 OPERATION: RECLADDING RISERS FROM DEAD WEIGHT SUPPORT FLANGE UPWARDS TO RISER CLAMP APPROXIMATELY 6m EACH RISER DATE: OCTOBER 2002
  • 2. (1) The extent of coating repair both risers from dead weight support flange bottom center and center to underside of riser clamps top center 20” high temperature gas riser in foreground. Note: Fabric lifting lugs for slinging units into position clearly visible. (2)
  • 3. (3) Full-length closure flanges and overlap interconnecting joints clearly visible together with SS 316L bolting system. (4)
  • 4. Dual diameter 244/219 transition unit has been lowered onto dead weight support flange. Note: Draw bolts pre fitted into closure flange. (5) Dual diameter transition unit fully installed. Factory thermal formed flanges visible at neoprene steel interface. Multi bolts at high stress area. (6)
  • 5. (7) Lifting lugs clearly visible on 244/219 diameter transition unit. (8) 533/508mm transition unit pre fitted onto existing cutback neoprene riser cladding. Draw bolts in position awaiting tensioning. Note: Inner vertical seal clearly visible together with white high temperature (120° corrosion inhibiting gel).
  • 6. (9) Close up showing condition of substrate and the fact that minimum substrate preparation is required prior to installation of Retrowrap units. (10) Both risers. Full-length 2794mm partially pre fitted over 219 condensate riser. Lower four draw bolts to be fitted. Note: Coating damage on 20” high temperature riser.
  • 7. (11) Full-length 2794mm unit in pre position over sealing skirt of lower unit. Upper end of lower closure flange and lifting lugs visible bottom center. (12) Completed interconnecting joint showing thixotropic corrosion inhibiting gel exuding from flange and circumferential joint during final tensioning.
  • 8. (13) Pre installed wrap with draw bolts in position awaiting closure by air operated impact wrench. Note: Boots of rope access abseiler. F:decpBPLomond.doc