3rd Qatar BIM User Day - Best Practice in Preparing an Organization for BIM

1,057
views

Published on

Speaker: Waleed Hashem …

Speaker: Waleed Hashem

- Shifting to BIM
- BIM Company challenges

About the Qatar BIM User Day:

Qatar University, HOCHTIEF ViCon and Teesside University proudly take the initiative to facilitate modern and innovative methods in the Gulf construction industry. The focus is Building Information Modeling (BIM), and our aim is to establish a knowledge platform with government, research and industry experts. The User Day aims to help people to share knowledge, discuss new technologies, and identify new potentials for BIM.

More information: www.bimuserday.com
Follow BUD on Twitter @bimuserday

Published in: Technology, Business

0 Comments
2 Likes
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
1,057
On Slideshare
0
From Embeds
0
Number of Embeds
3
Actions
Shares
0
Downloads
47
Comments
0
Likes
2
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. 1Waleed Hashem LEED APOBERMEYER MIDDLE EAST GMBH‘Best Practice in Preparing anOrganization for BIM’The BIM User Day
  • 2. 2Waleed Hashem LEED APOBERMEYER MIDDLE EAST GMBH1Decision of shifting to using BuildingInformation Building (BIM)2Company challenges in BIM3Case Study - Al Ain Hospital Project4ConclusionCONTENT
  • 3. 3Waleed Hashem LEED APOBERMEYER MIDDLE EAST GMBH1BIM Building Information ModelingFACTORS THAT CREATED A CHANGEAs part of research and development, It was crucial tomaintain our high competency in the corporate todeliver specialized complex facilities.We had to further investigate various options toenhance our methods in delivering sophisticatedprojects. Specializing in the most complex building-typessuch as hospitals, laboratories, education andresearch buildings. Managing complexity in work processes, varioususer groups, goods flow, people movement aswell as installation and services. Handling growing amount of information in ashorter time throughout the whole lifespan of aproject.
  • 4. 4Waleed Hashem LEED APOBERMEYER MIDDLE EAST GMBH Software and LicensingRevit ArchitectureRevit StructureRevit MEPNaviswork FreedomNaviswork Manageothers...2FINANCIAL INVESTMENTTraining of PersonnelProvide training to personnelin a certified training centers and to ahighly experience BIM Professionals.BIM Building Information ModelingCHALLENGES
  • 5. 5Waleed Hashem LEED APOBERMEYER MIDDLE EAST GMBH2BIM Building Information ModelingCHALLENGESSupport by Internal Branches andSubsidiaries to Each OtherAs we function hand in hand to supporteach other in various projects worldwide,there should always be a unity in the waysprojects are delivered.Training of PersonnelProvide intensive training to personnel to alevel that enables them to deliver projectssuccessfully.INVOLVEMENT OF ALL BRANCHES
  • 6. 6Waleed Hashem LEED APOBERMEYER MIDDLE EAST GMBHReduces the risk and enhances a competitive environment- Start withARCHITECTURE / INTERIOR DESIGN- Followed bySTRUCTURE ENGINEERING- Followed byMEP ENGINEERING- Followed byMEDICAL EQUIPMENT PLANNING2BIM Building Information ModelingPhasing the use of BIMCHALLENGES
  • 7. 7Waleed Hashem LEED APOBERMEYER MIDDLE EAST GMBH2ORGANIZATION AND SET-UPEntire production team is to adjustto using advanced new technologyfor delivering of projects.significant reduction in the numberof draughtsmen required for thebulk production and detailing.BIM Building Information ModelingCHALLENGESPROJECTMANAGERINTERIORDESIGNERSSTRUCTURALENGINEERSARCHITECTSMEPENGINEERSMEDICALPLANNERSPROJECTMANAGERSTRUCTURALENGINEERSARCHITECTSMEDICALPLANNERSMEPENGINEERSINTERIORDESIGNERSOld Team Organizational StructureBIM Organizational Structure
  • 8. 8Waleed Hashem LEED APOBERMEYER MIDDLE EAST GMBH2CLIENTS - PROJECT MANAGEMENTCommunication with ClientsChanges and adjustments inthe Project Management role inrelation to the design process``New Team setupTraditional Team setupBIM Building Information ModelingCHALLENGES
  • 9. 9Waleed Hashem LEED APOBERMEYER MIDDLE EAST GMBH3BIM Building Information ModelingCase Study:NEW AL AIN HOSPITALHighly Complex Project
  • 10. 10Waleed Hashem LEED APOBERMEYER MIDDLE EAST GMBHLocation : Abu-Dhabi, UAEClient : Abu Dhabi Health Services SEHASpecialty : 713-bed General HospitalScope : Overall planning of RehabilitationOperation Theatres, Emergencyand Diagnostics Center, TraumaCenter, Outpatient Department ,“Mother and Child Center”GFA (m2) : 265,000Value : AED 3.20 billion Incl. medicalequipmentAwarded - Hospital Build Middle East 2010 –Best Hospital Future Design – Citation3BIM Building Information ModelingAL AIN HOSPITAL – Highly Complex Project
  • 11. 11Waleed Hashem LEED APOBERMEYER MIDDLE EAST GMBH Family Well-Being Inviting retail, coffee shopareas and children playareas for visitors within theinternal oasis gardens..... Waiting Areas... Aredesigned to sufficientlytake the expectednumber of patientvisitors. Abundant naturaldaylight in all areas ofthe hospital, welcomingvisitors and patientsand promoting SocialInteraction Majlis areas providedin patient wards `3BIM Building Information ModelingAL AIN HOSPITAL
  • 12. 12Waleed Hashem LEED APOBERMEYER MIDDLE EAST GMBH3BIM Building Information ModelingWON-AUTODESK BIM INNOVATION AWARD 2010AL AIN HOSPITALBIM ModelRaising the awareness of the Client about theimportance of BIM
  • 13. 13Waleed Hashem LEED APOBERMEYER MIDDLE EAST GMBHRehabilitationAdministrationWard HDWard HCWard HAWard HCWard HBMain Hospital• Basement 01 & 02• Ground Floor• First Floor• Second Floor & TechnicalFloorMorgue3BIM Building Information ModelingHOSPITAL KEYPLANAL AIN HOSPITALChallenging our architectsand engineers to deliver asuccessful project
  • 14. 14Waleed Hashem LEED APOBERMEYER MIDDLE EAST GMBH3BIM Building Information ModelingHOSPITAL KEYPLANAL AIN HOSPITALRoom Data Sheets / Equipment Schedule / Object Library
  • 15. 15Waleed Hashem LEED APOBERMEYER MIDDLE EAST GMBHThe first 20% of the design influence80% of total cost. Therefore, westrongly emphasize on conceptdesign and early preliminary designstage to meet all upcomingrequirements.- Enables us to assist the Client fromthe very beginning to define theexpected budget and real cost of theintended project, therefore, increasesour chances of award.3BIM Building Information ModelingDEFINING CLIENT’S OBJECTIVESAL AIN HOSPITAL
  • 16. 16Waleed Hashem LEED APOBERMEYER MIDDLE EAST GMBHCLASH DETECTION DOCUMENTS3Clash ReportBIM Building Information ModelingAL AIN HOSPITALClash Detection Matrix- Awareness of the Client about the importance of BIM inreducing time and money during design/construction.- Client requested that we manage a clash detectionmodel for the facility prior to the award of the contractor.- Client reviewed all clash reports to ensure a clash freemodel in order to proceed with construction.
  • 17. 17Waleed Hashem LEED APOBERMEYER MIDDLE EAST GMBHMODEL3BIM Building Information ModelingAL AIN HOSPITAL
  • 18. 18Waleed Hashem LEED APOBERMEYER MIDDLE EAST GMBHCLASHES3BIM Building Information ModelingAL AIN HOSPITALClash 01Clash 04Clash 03Clash 02
  • 19. 19Waleed Hashem LEED APOBERMEYER MIDDLE EAST GMBH3BIM - ModelingARC, INT, STR, MEP &MEDRevit ArchitectureRevit StructureRevit MEPClash DetectionClash ReportNavisworkAdjustment andRemodelingFinal ModelBIM Building Information ModelingWORK FLOWAL AIN HOSPITAL After all adjustments and remodeling,second run of clash detection can be doneto achieve a more efficient model.
  • 20. 20Waleed Hashem LEED APOBERMEYER MIDDLE EAST GMBH The change to using BIM had significant changes on our projects setup. It encouraged us to re-visit and improve our methods indelivering projects. Effective implementation of BIM enabled us to maintain our highquality projects while adding real value to the design and constructionprocess. Positive results shown in our projects i.e Al-Ain Hospital raised theawareness of the Client about the importance of this technology andencouraged them to experiment its advantages further..CONCLUSION4
  • 21. 21Waleed Hashem LEED APOBERMEYER MIDDLE EAST GMBH"Creativity, as has been said,consists largely of rearranging whatwe know in order to find out whatwe do not know. Hence, to thinkcreatively, we must be able to lookafresh at what we normally take forgranted."— George KnellerTHANK YOU

×