1st Qatar BIM User DAY  Market demand/requirements
Upcoming SlideShare
Loading in...5
×
 

1st Qatar BIM User DAY Market demand/requirements

on

  • 210 views

Speaker: Miles Walker, KEO ...

Speaker: Miles Walker, KEO

-What is the market demand to implement BIM?
-Who is asking for BIM processes – clients, contractors, consultants?
-What about standards to force the industry?


About the Qatar BIM User Day:

Qatar University, HOCHTIEF ViCon and Teesside University proudly take the initiative to facilitate modern and innovative methods in the Gulf construction industry. The focus is Building Information Modeling (BIM), and our aim is to establish a knowledge platform with government, research and industry experts. The User Day aims to help people to share knowledge, discuss new technologies, and identify new potentials for BIM. More information: www.bimuserday.com Follow BUD on Twitter @bimuserday

Statistics

Views

Total Views
210
Views on SlideShare
205
Embed Views
5

Actions

Likes
0
Downloads
5
Comments
0

2 Embeds 5

http://localhost 3
http://meem.greyshare.com 2

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

1st Qatar BIM User DAY  Market demand/requirements 1st Qatar BIM User DAY Market demand/requirements Presentation Transcript

  • BIM Market Demand/Requirements Miles Walker, Corporate BIM Coordinator KEO International Consultants Miles Walker, KEO International Consultants 1
  • Summary • What is the market demand to implement BIM?  • Who is asking for BIM processes – clients, contractors,  consultants?  • What about standards to force the industry? • Open discussion, Q&A Miles Walker, KEO International Consultants 2
  • How is it asked for? BIM is Not being asked on many projects! – 62% have not been asked for BIM! – 43% don’t know anyone who uses BIM! Source: 2011 ME BIM Survey Now….BIM is asked for at RFP…..in a single line  requirement Now….BIM is asked for at RFP…..in a multiple page  requirement and BIM specifications Miles Walker, KEO International Consultants 3 View slide
  • Clients are demanding BIM in RFP’s! Courtesy of Mark Baldwin ‘BIM shall be developed using  Revit Architecture, Revit  Structure and Revit MEP or  other IFC/BIM compatible  software and be compatible  with Navisworks’ “Design team to supply coordinated IFC model for use by Main contactor” RFP’s Miles Walker, KEO International Consultants 4 View slide
  • What is being asked for? • BIM Experience: an understanding of BIM and project  examples • BIM Standards: need to follow specified project requirements  and BIM standards • Integrated Design: collaborative working with coordinated  model  approach • Digital models: Revit, Microstation, Navisworks, IFC models • Quality models: accuracy, compliance and 3D coordination  clash detections, model checking • Simulation: walkthroughs and 3D views • Cost accuracy: quantity take‐off from models • Construction v Design comparisons: 4D simulation against  programme Miles Walker, KEO International Consultants 5
  • Market Demand: Clients Large ME projects are leading and demanding BIM! Arch Span: 180m (20m wider than the largest  arch span at Heathrow Terminal 5), weighing  around 700 tonnes Image courtesy of Abu Dhabi Airports Company Miles Walker, KEO International Consultants 6
  • Market Demand: Major Projects BAA T5 SWISS RE LONDON HOSPITALS 15 years (1997 – 2012) Images courtesy of BAA and Skanska UK Miles Walker, KEO International Consultants 7
  • Market Demand: Contractors Images courtesy of Skanska UK Miles Walker, KEO International Consultants 8
  • Market Demand: Contractors 2000 2005 2007 2009 2 sites, 78 buildings, 200,000m2, 190 departments, 10000 rooms, 0.5m items of medical equipment  2010 2011 2012 Images courtesy of Skanska UK Miles Walker, KEO International Consultants 9
  • Images courtesy of Skanska UK Miles Walker, KEO International Consultants 10
  • Courtesy of Skanska UK and Reading University Miles Walker, KEO International Consultants 11
  • Market Demand: Major Projects 11 years (2007 – 2018) Images courtesy of Crossrail and Aedas Miles Walker, KEO International Consultants 12
  • Market Demand: Consultants CEO BIM  REQUIREMENT EARLY BIM MODELING &  SOFTWARE  EVALUATION: 2008 2009 Archicad / Revit LUSAIL, MIXED  DEVELOPMENT 550,000m2 2010 GHERNATA KUWAIT 10,000m2 SAFE HANDS SUADI ARABIA 2011 AL MANSHAR KUWAIT 200,000m2 2012 Revit Miles Walker, KEO International Consultants 13
  • Market Demand: Consultants Miles Walker, KEO International Consultants 14
  • Al Manshar, Kuwait Miles Walker, KEO International Consultants 15
  • Al Manshar, Kuwait Miles Walker, KEO International Consultants 16
  • Al Manshar, Kuwait Miles Walker, KEO International Consultants 17
  • US demand for change C191‐2009  Standard Form  Multi‐Party  Agreement for  Integrated Project  Delivery (IPD) 2007 2008 2009 May 2012 Miles Walker, KEO International Consultants 18
  • US demand for change 8 years of BIM Awards!! http://network.aia.org/technologyinarchitecturalpractice/home/buildinginformationmodelingawardsprogram/ Miles Walker, KEO International Consultants 19
  • http://network.aia.org/technologyinarchitecturalpractice/home/buildinginformationmodelingawardsprogram/ Miles Walker, KEO International Consultants 20
  • UK demand for change… Miles Walker, KEO International Consultants 21
  • UK demand for change Deadline for UK Government £5m+ projects  required to be  BIM Level 2 March 2011 2012 May 2012 2016 Miles Walker, KEO International Consultants 22
  • Middle East ? BuildingSMART Government Meetings ? Images courtesy of BuildingSMART Miles Walker, KEO International Consultants 23
  • Mobile technology is leading to  change.. $546 16 May 2012 Miles Walker, KEO International Consultants 24
  • Mobile technology provides.. • • • • Quick retrieval of drawings, models and information!  Information at literally @ fingertips Reduction of waste (paper, man hours) Savings through rapid take up of mobile is requiring  industry to get to BIM (information, models, analysis,  4D and 5D) Miles Walker, KEO International Consultants 25
  • Market Demand: Contractors Images courtesy of  Vela Systems, Inc. http://www.vela systems.com/ipa d‐for‐ construction‐ vela‐mobile/ Miles Walker, KEO International Consultants 26
  • Open discussion, Q&A • What Government initiatives/standards are  influencing change? • What projects will greatly influence future  BIM direction in ME? Miles Walker, KEO International Consultants 27