Ptsc m&c brief profile (may2012)
Upcoming SlideShare
Loading in...5
×
 

Ptsc m&c brief profile (may2012)

on

  • 1,049 views

PTSC M&C Profile

PTSC M&C Profile

Statistics

Views

Total Views
1,049
Views on SlideShare
1,049
Embed Views
0

Actions

Likes
0
Downloads
17
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Ptsc m&c brief profile (may2012) Ptsc m&c brief profile (may2012) Presentation Transcript

    • PTSC OverviewPTSC – PetroVietnam Technical Services Corporation: a CORE SERVICESmember of the Vietnam Oil and Gas Group(PetroVietnam) providing diversified technical services for ü Marine Servicesthe oil and gas industry inside and outside Vietnam. ü EPCIC Project Services, Mechanical and Construction ServicesWith more than 25 subsidiaries, PTSC as a multi-sectorcorporation has gained a reputation of a leader in ü HUC, O&M and other Offshore Servicesproviding oil & gas services in Vietnam. ü Production Services – FPSO/ROV ü Supply Base Services ü Procurement & Logistics Services ü Other Services SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 1 of 22
    • PTSC M&C Overview ü Established on May 15, 2001 by Act No. 731/QD- HDQT of PetroVietnam, changed to Joint Stock Company since April 2011. ü QHSE Management system: ISO 9001-2008, ISO 14001-2004 and OHSAS 18001-2007 accredited by DNV ü ASME “U” & “S” stamp for manufacture of Pressure Vessel and Power Boilers. ü ISO 17025 certificate for Calib./Testing Laboratory ü API Monogram for Structural Tubular Rolling SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 2 of 22
    • PTSC M&C OverviewAnnual RevenueRevenue (US$ mil)600.00 533.49500.00400.00 349.22300.00200.00 177.26 106.39 98.64100.00 39.45 39.94 51.54 15.74 24.44 0.98 - 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 Revenue SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 3 of 22
    • ServicesWith a team of committed, professional and dynamic engineers with experience from more than 40 successful projectswith average productivity of 50,000 MT per annual PTSC M&C continuously strives to deliver the highest HSE and QAQCstandards to our Clients’ expectations and beyond. OFFSHORE ONSHORE OTHERSExecuting full EPCIC services for Executing EPC services for various § Manpower supplyoffshore facilities including fixed onshore construction plants (power § Equipment for rentplatforms, floating objects plant, LNG, gas terminal..) and § Production and manufacturing of(ships, barges), modules, skids, vess jetty, port, yard, workshop and equipments and facilitiesels and others. associated facilities. SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 4 of 22
    • Organization Chairman Director Deputy Director Deputy Director Deputy Director Deputy Director Admin Dept. Constr Dept. Plan. Dept. T&O Dept. Com. Dept F&A Dept. Engr. Dept HSE Dept BD Dept. HR Dept. Services Equipments Structure Structure Piping & Mec. E&I Security General General Workshop 1 Workshop 2 Workshop Workshop Team Workshop Workshop SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 5 of 22
    • Human ResourcesPeople are our priority Procurement T&O Engineering QAQC 6000 Business Development Others 5000 4000 3000 Casual 3000 326 Long term 41 2000 151 2187 129 1000 200 732 112 53 0 Indirect Direct Manpower Resouces Indirect Manpower Divide Dec, 2011 SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 6 of 22
    • HSE Statistic HSE mindset is a core value for our success YEAR Description TOTAL 2001 - 2005 2006 2007 2008 2009 2010 2011 Q1, 2012Total Manhours 6,476,872 1,723,959 4,865,002 2,587,970 2,873,171 5,832,071 6,625,567 2,275,720 33,260,332WorkedLost Time Injuries 0 0 0 0 0 1 0 1 2Lost Work day 0 0 0 0 0 30 0 11 41Restricted Duty 0 0 0 0 0 0 0 0 0InjuriesMedical Treatment 1 1 1 0 1 1 1 0 6InjuriesFirst Aid 3 1 1 0 1 2 4 0 12Near Miss 6 5 8 6 4 25 12 7 73HAZOB Cards N/A 700 1,571 734 2,696 3,753 4,450 1,641 15,545Fire/Explosion 1 0 3 0 0 0 0 0 4Equipment Damage 1 2 2 0 0 0 1 1 7Vehicle Incidents 0 0 0 0 0 0 0 0 0No. of Fatality 0 0 0 0 0 0 0 0 0 SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 7 of 22
    • Engineering Capability ü Engineering Centre with more than 130 well educated in-house engineers with experience from various national and international engineering environment and projects. ü Secure and efficient engineering infrastructure with fully equipped engineering softwares ü Management teams with experience from approximately 40 EPCIC projects in DE Execution, Construction Engineering and follow-on/procurement engineering across all major disciplines. ü Extensive experience of in-house design process skids eg Fuel Gas Skids, Chemical Injection Skids, Pressure Vessels & Tanks.. ü Extensive experience of civil engineering for wharf, yard strengthening, jetty upgrade, piling foundation ü Partnership with leading international engineering houses SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 8 of 22
    • Procurement Capabilityü Extensive in-house experience and capacity in purchasing materials, equipments regionally and globallyü More than 50 qualified procurement employees with experience from major international EPCIC projectsü Actively promote and follow international trading practices terms and conditionsü Provide the most efficiency & competitive price in the shortest time with high qualityü Possess a rich Vendors database and unit prices databaseü Efficient in-house expediting team familiar with custom authorities and closely connected to regional and global forwarders and custom authorities SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 9 of 22
    • Construction Capability Yard Facilities ü Total area: 57 ha ü Quay length: ~500 m ü Quay width: 28 m ü Water depth: 10 – 15 m. ü Jetty distribution: 7 MT cargo/m2 ü Quayside designed for 20,000 DWT Vessels ü Dredging the sea bed to accommodate CPP up to 25,000 MT ü 3 Skidways (6,000 MT; 15,000MT & 25,000MT)• Subcontractors/ partners yard areas not included and able to utilise up to 180ha upon required. SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 10 of 22
    • Construction CapabilityManpower Resouces, Subcontractors, Tools & Equipments Manpower Resources Tools & EquipmentsA skilful and hard-working Deversified and modern in-workforce with over 2,100 house fabrication facilitiesworkers; qualified & familiar ready for the work; chainwith international standards; system to increaseannual trained through productivity, minimize humanvarious courses; supervised by mistakesover 100 experiencedsupervisors at constructionyard. Subcontractors 3 rd parties servicesCo-operating with experienced and qualified Close partnership with various parties inconstruction subcontractors inside and outside cooperating, supervising and managing productionVietnam (maximizing local content, share quality & safety; verifyingresources/workload and approach new potentialprojects) SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 11 of 22
    • T&I, HUC Capabilityü Provide complete delivery solutions for offshore transportation, installation, hook-up & commissioning projects ranging from marginal field developments to large integrated gas processing facilitiesü Extensive experience of offshore services through out various EPCIC projects implemented.ü Wide range of global T&I, HUC partners SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 12 of 22
    • Major ProjectsOffshore EPCIC ProjectsBien Dong 1 Project Su Tu Den NE Project Chim Sao Project§ Client: Bien Dong POC § Client: CuuLong JOC § Client: Premier Oil Vietnam Offshore§ Project type: EPCIC § Project type: EPCIC § Project type: EPCIC§ Duration: 02/2010 – tentatively 07/2012 § Duration: 02/2008 – 07/2010 § Duration: 08/2008 – 10/2010§ Key Facilities: 01 CPP, 01 WHP, 01 CPP § Key Facilities: 01 WHP, 01 jacket, infield § Key Facilities: 01 WHP, 01 jacket & Jacket & Piles, Pipeline & subsea cables pipelines & submarine cable piles, pipelines & submarine cable§ Total weight: ~ 30,000 MT § Total weight: ~ 3,500 MT § Total weight: ~ 7,500 MT SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 14 of 22
    • Major ProjectsOffshore EPCIC ProjectsSu Tu Trang Project Te Giac Trang Project Bunga Orkid Project§ Client: CuuLong JOC § Client: Hoang Long JOC § Client: Talisman Malaysia Limited§ Project type: EPCIC § Project type: EPCIC § Project type: EPC§ Duration: 03/2010 – tentatively 06/2012 § Duration: 11/2009 – 08/2011 § Duration: 07/2006 – 03/2008§ Key Facilities: 01 WHP, 01 jacket, pipelines § Key Facilities: 01 WHP, 02 jacket, 01 drilling § Key Facilities: 03 WHPs deck, infield pipeline§ Total weight: ~ 2,500 MT § Total weight: ~ 4,000 MT § Total weight: ~ 4,000 MT SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 15 of 22
    • Major ProjectsOffshore E-P-C ProjectsSu Tu Den WHP-A Project Ruby-B Project PLDP-A Project§ Client: CuuLong JOC § Client: Petronas Caligali Vietnam § Client: Petronas Caligali Vietnam§ Project type: EPC § Project type: EPC § Project type: PCC§ Duration: 05/2002 – 09/2003 § Duration: 10/2004 – 09/2005 § Duration: 01/2008 – 06/2009§ Key Facilities: 01 WHP § Key Facilities: 01 WHP § Key Facilities: 01 WHP§ Weight: 2,200 MT § Weight: 1,300 MT § Weight: 600 MT SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 16 of 22
    • Major ProjectsOffshore E-P-C ProjectsTopaz Project Song Doc WHP-A Project Bunga Tulip A Project§ Client: Petronas Caligali Vietnam § Client: Truong Son JOC § Client: Talisman Malaysia Limited§ Project type: PCC § Project type: PC § Project type: C§ Duration: 10/2009 – 07/2010 § Duration: 06/2007 – 02/2008 § Duration: 12/2005 – 07/2006§ Key Facilities: 01 WHP, 01 Jacket, Piles & § Key Facilities: 01 WHP § Key Facilities: 01 WHP, 01 Mono-pod Conductors Jacket § Weight: 600 MT§ Total weight: ~ 4,000 MT § Total weight: 900 MT SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 17 of 22
    • Major ProjectsOffshore E-P-C ProjectsWHP-C1/CLPP/NBR3 Project JVPC S1 Project BP Compression Module Project§ Client: Japan Vietnam Petroleum Company § Client: Japan Vietnam Petroleum Company § Client: British Petroleum (BP) Vietnam§ Project type: C § Project type: C § Project type: PC§ Duration: 10/2004 – 05/2005 § Duration: 02/2002 – 08/2002 § Duration: 07/2006 – 10/2007§ Key Facilities: 02 WHPs, 01 bridge § Key Facilities: 01 WHP § Key Facilities: 01 Compression Module§ Total weight: ~ 1,200 MT § Weight: 450 MT § Weight: 2,000 MT SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 18 of 22
    • Major ProjectsOffshore E-P-C ProjectsLQ-CPC/99 Project Bunga Raya-A Project JVPC NULQ Project§ Client: VietsovPetro JV § Client: Talisman Malaysia Limited § Client: Japan Vietnam Petroleum Company§ Project type: EPC § Project type: EPC § Project type: EPC§ Duration: 12/1999 – 12/2000 § Duration: 03/2002 – 07/2003 § Duration: 02/2002 – 08/2003§ Key Facilities: 02 LQs (70 men each) § Key Facilities: 01 LQ (48 men), 01 Bridge § Key Facilities: 01 LQ (63 men), 02 bridges§ Total weight: ~ 2,300 MT § Total weight: 1,000 MT § Total weight: 1,400 MT SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 19 of 22
    • Major ProjectsOffshore E-P-C Projects100 Men LQ Project PTSC-01 Project 3509 TUG BOAT Project§ Client: Petrovietnam Marine Shipyard § Client: PTSC § Client: PTSC§ Project type: C § Project type: EPC § Project type: PC§ Duration: 10/2010 – 03/2011 § Duration: 10/2008 – 11/2009 § Duration: 12/2009 – 10/2010§ Key Facilities: 01 LQ (100 men) for 90m § Key Facilities: 5,000DWT Ballast Barge for § Key Facilities: 02 tug boats with capacity water depth jack-up rig transporting topsides, jackets,.. 3,500 BHP and 4,750 BHP§ Total weight: 300 MT § Total weight: 2,400 MT § Total weight: 1,000 MT SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 20 of 22
    • Major ProjectsOnshore ProjectsDung Quat Refinery Harbor Project GPPIC Project NCS Condesate Storage Project§ Client: DungQuat Refinery PMT § Client: PetroVietnam Gas Company § Client: Client: PetroVietnam Gas Company§ Project type: PC § Project type: EPC § Project type: EPC§ Duration: 06/2006 – 12/2007 § Duration: 08/2001 – 02/2002 § Duration: 11/2001 –11/2003§ Key Facilities: construct from Berth 1 to 6 § Key Facilities: Four (04) big compressors § Key Facilities: Two condensate of Product Export harbor for DungQuat tanks, condensate pumps, metering skid Refinery Harbor Project. system, floating roofs § Capacity: 16,500 m3/each SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 21 of 22
    • Clients & Partners SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 22 of 22