How GeoTrellis is being applied to Army Corps water infrastructure. From 2013 FedGeoDay in Washington DC on 2/28/2013.

How GeoTrellis is being applied to Army Corps water infrastructure. From 2013 FedGeoDay in Washington DC on 2/28/2013.

Statistics

Views

Total Views
516
Views on SlideShare
489
Embed Views
27

Actions

Likes
1
Downloads
1
Comments
0

1 Embed 27

https://twitter.com 27

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Fed Geo Day - Applying GeoTrellis at the US Army Corps Fed Geo Day - Applying GeoTrellis at the US Army Corps Presentation Transcript

    • Water Infrastructure BudgetingU.S. Army Corps of Engineers Robert Cheetham cheetham@azavea.com @azavea @rcheetham
    • Spatial AnalysisHigh PerformanceComputingUI/UX DesignR&D
    • LandWaterPeople
    • SimulationModelingForecasting
    • - Performance- Scalability- Big data sets
    • Raster file I/ODistributed Processing Targets
    • National Water Infrastructure− Health and safety− Economic growth− Aquatic ecosystem functionWho is Army Corps IWR?
    • Environmental Flood Risk Management StewardshipHydropower Navigation Recreation Water Supply Lines of Business
    • − Demographic Shifts− Land use/land cover change− Climate change− Shifting economic patterns− Changing culture− Limited budgets 21 st Century Challenges
    • Watershed Infrastructure System Data Manager − Data-driven decision-making − Budget planning − Many, many factors to consider − Civil Works Budget transformation initiative WISDM
    • Play out geographic impact of different budget scenarios WISDM
    • − Base maps− Civil works projects− Flood risk− Climate change velocity− Coastal risk− Historic disasters− Impervious surface %− Almost 100 factors WISDM Data
    • Region and L-o-B
    • Project Parameters
    • Project Details
    • Landscape Factors
    • Geoprocessing
    • Project Stats
    • Geoprocessing-based Budgeting
    • Very exciting
    • NASA Space Apps Challenge Summer of Maps http://SummerOfMaps.org/