EP-3 Recovery Mr. Ross Higa HQ PACAF/CECI
Background <ul><li>CE Mission: Document pavement degradation from AN-124 traffic </li></ul><ul><ul><li>US responsible for ...
Logistics and Security  <ul><li>Lodged at Gloria Resort Hotel in Sanya </li></ul><ul><ul><li>U.S. manager assisted in logi...
Lingshui (Naval) Air Base, Hainan Island, People's Republic of China EP-3
EP-3 and AN-124
Crew members guided the AN-124 on narrow taxiways and through tight turns
Kneeling AN -124 - Load bearing points on the pavement were closely monitored
The airfield already had existing defects
Working Conditions <ul><li>Lockheed Martin was well prepared </li></ul><ul><ul><li>Chartered Gulfstream IV on standby at S...
People's Liberation Army <ul><li>PLA Navy monitored operations closely </li></ul><ul><ul><li>Continuous photography and vi...
 
 
Three jack stands supported the aircraft during underside disassembly work
Blowers vented residual fuel before cutting operations could begin
A safety line was installed for topside work
Flaps, ailerons and leading edges were salvaged
Tail section was cut off the fuselage
Key components were salvaged
Four engines were removed in one day
 
Gas powered saws were used to cut and remove  the wings in sections
Scrapped parts were also taken to Kadena on the AN-124
Main and nose gears were removed when rain halted wing cutting operations
A specially made trailer was jacked up to support the aircraft
EP-3 rested solely on the raised trailer after the jack stands were removed
Interior pipes and cables were pre-cut to facilitate removal of wing sections
Nacelles were salvaged
The AN-124 was &quot;cubed out&quot; on almost every return flight
Lockheed and Russian crews &quot;busted butts&quot; to load same-day turnaround flights “ You Call – We Haul”
Bridge cranes were used to load from the rear
A centerline marker was laid out to help align the AN-124 to the EP-3
The AN-124 hit the mark perfectly
The AN-124 used portable extension ramps to reduce the incline
Steel cables from the cargo bay were attached to the trailer
Winches pulled the fuselage into the cargo bay
The wide wheels and narrow ramps left no room for error
The fuselage and trailer cleared by a few inches
 
 
The portable ramps were disassembled and loaded onto the AN-124
The Russian crew
After a refueling stop in the Philippines and crew rest in Hawaii, the fuselage was welcomed home at Dobbins ARB, GA (home...
Additional Information <ul><li>Additional Information and photos can be found on the PACOM website at: </li></ul><ul><li>h...
Upcoming SlideShare
Loading in...5
×

P 3 Recovery From China22mar07

851

Published on

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
851
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
6
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "P 3 Recovery From China22mar07"

  1. 1. EP-3 Recovery Mr. Ross Higa HQ PACAF/CECI
  2. 2. Background <ul><li>CE Mission: Document pavement degradation from AN-124 traffic </li></ul><ul><ul><li>US responsible for pavement damage </li></ul></ul><ul><ul><ul><li>Chinese tried, but could not “run up the bill” </li></ul></ul></ul><ul><ul><li>Airfield designed for fighter aircraft </li></ul></ul><ul><ul><ul><li>Narrow taxiways, small aprons </li></ul></ul></ul><ul><ul><ul><li>Limited pavement bearing strength </li></ul></ul></ul><ul><ul><li>AN-124 has higher damage potential than C-5 </li></ul></ul><ul><ul><ul><li>Five AN-124 flights (first and last were heaviest) </li></ul></ul></ul><ul><ul><ul><li>Cargo weight and fuel strictly controlled to avoid damage </li></ul></ul></ul><ul><li>First AN-124 arrived 16 Jun 01 to start recovery operations - completed 3 Jul 01 </li></ul>
  3. 3. Logistics and Security <ul><li>Lodged at Gloria Resort Hotel in Sanya </li></ul><ul><ul><li>U.S. manager assisted in logistical support </li></ul></ul><ul><ul><li>One hour bus ride to/from Lingshui Air Base </li></ul></ul><ul><ul><li>Left hotel 0630, returned 1830 </li></ul></ul><ul><li>Operations kept low key </li></ul><ul><ul><li>Minimal news coverage </li></ul></ul><ul><ul><li>Photographers and reporters kept away from hotel and base </li></ul></ul><ul><ul><li>Police stationed along route to Lingshui </li></ul></ul><ul><ul><li>Exception: Numerous guests/photographers on base during fuselage loading </li></ul></ul>
  4. 4. Lingshui (Naval) Air Base, Hainan Island, People's Republic of China EP-3
  5. 5. EP-3 and AN-124
  6. 6. Crew members guided the AN-124 on narrow taxiways and through tight turns
  7. 7. Kneeling AN -124 - Load bearing points on the pavement were closely monitored
  8. 8. The airfield already had existing defects
  9. 9. Working Conditions <ul><li>Lockheed Martin was well prepared </li></ul><ul><ul><li>Chartered Gulfstream IV on standby at Sanya Airport for evacuation </li></ul></ul><ul><ul><li>Physician on team - local hospitals inadequate </li></ul></ul><ul><ul><ul><li>Temperatures reached 107 deg F with high humidity </li></ul></ul></ul><ul><ul><ul><li>Heat stress encountered early on </li></ul></ul></ul><ul><ul><ul><li>Administered medication as needed </li></ul></ul></ul><ul><ul><li>Daily safety meetings - no injuries incurred </li></ul></ul><ul><ul><li>Local contracts for work trailers, water, transportation, meals, toilets, generator, etc. </li></ul></ul><ul><ul><li>Cell phones with international capability </li></ul></ul>
  10. 10. People's Liberation Army <ul><li>PLA Navy monitored operations closely </li></ul><ul><ul><li>Continuous photography and video taping of work and people </li></ul></ul><ul><ul><li>U.S. workers restricted from crossing rope barriers </li></ul></ul><ul><ul><li>Routine review of photos and video taken by U.S. </li></ul></ul><ul><ul><li>End of day meetings held to recap day's events and resolve issues </li></ul></ul><ul><ul><li>Key project officers from Beijing; not Lingshui </li></ul></ul><ul><li>Non-threatening, but many &quot;home turf&quot; rules </li></ul>
  11. 13. Three jack stands supported the aircraft during underside disassembly work
  12. 14. Blowers vented residual fuel before cutting operations could begin
  13. 15. A safety line was installed for topside work
  14. 16. Flaps, ailerons and leading edges were salvaged
  15. 17. Tail section was cut off the fuselage
  16. 18. Key components were salvaged
  17. 19. Four engines were removed in one day
  18. 21. Gas powered saws were used to cut and remove the wings in sections
  19. 22. Scrapped parts were also taken to Kadena on the AN-124
  20. 23. Main and nose gears were removed when rain halted wing cutting operations
  21. 24. A specially made trailer was jacked up to support the aircraft
  22. 25. EP-3 rested solely on the raised trailer after the jack stands were removed
  23. 26. Interior pipes and cables were pre-cut to facilitate removal of wing sections
  24. 27. Nacelles were salvaged
  25. 28. The AN-124 was &quot;cubed out&quot; on almost every return flight
  26. 29. Lockheed and Russian crews &quot;busted butts&quot; to load same-day turnaround flights “ You Call – We Haul”
  27. 30. Bridge cranes were used to load from the rear
  28. 31. A centerline marker was laid out to help align the AN-124 to the EP-3
  29. 32. The AN-124 hit the mark perfectly
  30. 33. The AN-124 used portable extension ramps to reduce the incline
  31. 34. Steel cables from the cargo bay were attached to the trailer
  32. 35. Winches pulled the fuselage into the cargo bay
  33. 36. The wide wheels and narrow ramps left no room for error
  34. 37. The fuselage and trailer cleared by a few inches
  35. 40. The portable ramps were disassembled and loaded onto the AN-124
  36. 41. The Russian crew
  37. 42. After a refueling stop in the Philippines and crew rest in Hawaii, the fuselage was welcomed home at Dobbins ARB, GA (home of Lockheed Martin Aeronautical Systems Co.)
  38. 43. Additional Information <ul><li>Additional Information and photos can be found on the PACOM website at: </li></ul><ul><li>http://www.pacom.mil/pages/ep3photos.htm </li></ul>