Westover Transition
Upcoming SlideShare
Loading in...5
×
 

Westover Transition

on

  • 323 views

 

Statistics

Views

Total Views
323
Views on SlideShare
323
Embed Views
0

Actions

Likes
0
Downloads
0
Comments
0

0 Embeds 0

No embeds

Accessibility

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Westover Transition Westover Transition Presentation Transcript

  • The old Westover Branch Library at 1800 N. Lexington St . will cease public operations on Saturday, Sept. 26, 2009 at 5 p.m.
  • The outdoor book drop for returning materials at 1800 N. Lexington St. will be sealed on Sept. 26 at 5 p.m.
  • Library materials may be returned at the drop slots for the new Westover facility at 1644 N. McKinley St. after 5 p.m. on Sept. 26.
  • Those returned items will be retrieved and checked back into the collection on a regular basis.
    • Materials may also be returned at all other Arlington Public Library locations.
  • All holds designated for pick-up at Westover will be at Central Library when they become available between Sunday, Sept. 27 and Friday, Oct. 30.
  • The new Westover Branch Library will officially open to the public at 1644 N. McKinley St. on Saturday, Oct. 31 at 10 a.m.
  • A community open-house celebration for the entire Reed-Westover facility will also begin Saturday, Oct. 31 at 10 a.m. A ribbon-cutting ceremony for the Reed-Westover facility will take place on Friday, Oct. 30 at 10 a.m.