Richard Simpson Park     Master Plan
Arlington             Yacht              ClubLake Room
Current Issues  Lack of a long-term master plan for the   park  Placement of the new building in the   floodplain  Exis...
New Lake Room Concept
New Lake Room Concept
Current Project Estimate           Description              Design       Construction     Total                           ...
Process Two public meetings Project Website Email Blasts Planning and Development Committee Two Park Board Meetings ...
Next Steps  Seek Park Board adoption of the master   plan at December 10th meeting  Informal staff report to City Counci...
Questions
Richard Simpson Master Plan 2012
Richard Simpson Master Plan 2012
Upcoming SlideShare
Loading in...5
×

Richard Simpson Master Plan 2012

325

Published on

Published in: Education
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
325
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Richard Simpson Master Plan 2012

  1. 1. Richard Simpson Park Master Plan
  2. 2. Arlington Yacht ClubLake Room
  3. 3. Current Issues  Lack of a long-term master plan for the park  Placement of the new building in the floodplain  Existing park infrastructure  Parking lot  Drainage  Traffic flow  Restroom / pavilion structures  Closure of Royaloak Drive
  4. 4. New Lake Room Concept
  5. 5. New Lake Room Concept
  6. 6. Current Project Estimate Description Design Construction Total $ New Building $ 109,182 $ 909,848 1,019,029 $ Site Work $ 74,323 $ 619,362 693,685 $ Attached Public Restrooms $ 26,497 $ 220,805 247,301 $ Administrative Costs     126,200 $  Total Project Cost 2,086,216 $ 2008 Bond Funding 939,386 $ FY14 Parks Gas Funding 1,146,830
  7. 7. Process Two public meetings Project Website Email Blasts Planning and Development Committee Two Park Board Meetings Park Board Work Session Q&A document Consulted with City Departments
  8. 8. Next Steps  Seek Park Board adoption of the master plan at December 10th meeting  Informal staff report to City Council on December 18th  Seek City Council approval of the consultant contract for construction documents of the new building  Begin design work in February
  9. 9. Questions
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×