    1. + seeing quality through
    2. harris architecture + design management
    3. Design  entices  and  it  sells,  but  the  complex  team  needed  to  design today’s luxury hotel, spa  or  senior  living  project  is  large,  expensive,  and  fragmented  –   with multiple design authorities  working  toward  independent,  often conflicting goals.     The  result  for  the  client  is  wasted  resources,  diminished  design  team  performance,  and  diluted design value.    The  result  for  the  project  is  unrealized design potential. 
    4. Fig. 1 : Original project team  
    5. At one time, the Architect was the Master Builder,  and he did everything.  What happened?  As  the  science  of  buildings  evolved,  areas  of  technical  expertise  (structural,  mechanical,  etc.)  were  removed  from  the  Architect’s  scope,  creating  a  ‘design  team’  managed by the architect.   As  projects  became  more  complex,  project  management was removed from the architect’s scope,  often performed by the owner or a third‐party project  manager.   As the expectations for design quality increased, areas  of aesthetic specialization also became separated from  the  architect’s  scope,  including  landscape  design,  lighting design, graphic design, and interior design.  On many project types, including all high‐end hospitality  projects,  the  architecture  of  the  building  interior  was  also removed from the architect’s scope, resulting in the  creation of the ‘interior architectural’ design practice.   “In a way, architects gave away the  interiors of their own buildings.”                                                                      Michael Graves, architect                               When  this  fundamental  change  occurred,  the  active  management  of  the  primary  design  consultants  was not replaced. 
    6. Fig. 2:  Today’s complex project team (idealized) 
    7. design  inactive      design    active  Fig.  3 :  Today’s complex project  team (reality) 
    8. It doesn’t have to be that way.   • The design team’s contracts can be coordinated.  • Evaluation  of  the  design  consultants  can  go  deeper  than “who will be on my team?” Their scope  – and  their  documentation  –  can  be  tailored  to  their  capabilities, and to how they actually work.  • The design team can be actively monitored, and their  efforts can be intelligently synchronized.  • Issues can be framed to facilitate efficient review and  approval by ownership and the design team.  • Time  wasting  conflict  and  inefficiencies  can  be  anticipated, and  can be avoided.  • Critical issues can be "walked‐through" the approval  process.  • Design direction and decisions can be documented.  • Design team meetings can be objectively moderated,  and they can be more productive.  • Procedures  for  concurrent  production  of  CAD  drawings can be resolved.   • Design continues during construction, and managing  the design team can as well.  • The collective design effort can be improved. 
    9. Fig.  4 :  Complex  project team with Design Manager 
    10. Interior Design: ForrestPerkins  Westin Book Cadillac / Lobby Lounge  Detroit, MI 
    11. harris architecture + design management HARRIS  a+dm  provides  the      active  management  required  to  achieve  maximum  design  value  and maximum design quality.    Proactive coordination and management  of  the  primary  design  consultants  –  architect,  interior  designer,  lighting,  landscape  and  others  –  minimizes  the  conflict and inefficiencies inherent in the  traditional  project  management  approach.   Design  management  objectively  considers  and  responds  to  the  design  team’s  strengths  and  weaknesses  and  actively monitors their performance and  progress.   Conflicts  that  can  slow  or  stop  the  team’s  momentum  are  avoided  before  they  happen,  and  the  design  team  remains focused on their real challenge –  meeting  the  client’s  program  and  budget  requirements  with  the  highest  possible  design  and  documentation  quality.  
    12. Architecture: Gomatsky Dupree & Associates  Stoneleigh Hotel and Residences  Dallas, TX 
    13. harris architecture + design management PROJECT EXPERIENCE  HARRIS a+dm was established to address the lost time , talent and design potential that  occurs on most complex architectural design projects. The following represents previous  project experience relevant to the services provided by HARRIS a+dm.      HOSPITALITY     SPAS    JW Marriott Resort, San Antonio, TX   JW Marriott Resort Spa, San Antonio, TX  Stoneleigh Hotel and Residences, Dallas, TX  Ritz‐Carlton Club Spa, Santa Barbara, CA (design only)   Westin Book‐Cadillac, Detroit, MI  St Regis Spa & Fitness Center, Houston, TX  Westin South Coast Plaza, Costa Mesa, CA  Fairmont Empress Willow Stream Spa , Victoria, BC  Fairmont Chateau Lake Louise, Lake Louise, Alberta    The Fairmont Hamilton Princess, Hamilton, Bermuda  RESTAURANT    The Renaissance Grand Hotel, St. Louis  Epic Restaurant in The Royal York Hotel, Toronto  InterContinental Hotel, Dallas  Dakota’s Restaurant, Boston, Massachusetts  Fairmont Empress Hotel, Victoria, BC  Restaurants and bars as part of most hotel projects  Kingdom Centre Four Seasons, Riyadh, Saudi Arabia      Hyatt Lake Las Vegas, Las Vegas, NV  RESIDENTIAL    Park Lane Hotel, London, England  Ritz‐Carlton Club & Residences, San Francisco, CA  Del Lago Golf Resort & Hotel, Montgomery, TX  Ritz‐Carlton Club Santa Barbara  (design  only)   Burj Al Arab Hotel, Dubai, UAE  Private Palace and Villa, Abu Dhabi, UAE  Marriott San Juan Resort and Casino, Puerto Rico  #47 & #49 Winnington Road Residence, London  Disney’s Fort Wilderness Lodge, Orlando, FL    La Manga Club Resort Hotel, Murcia, Spain  CASINO  Grosvenor House Hotel, London, England  Marriott San Juan Resort Casino, Puerto Rico  Troia Hotel & Resort, Troia, Portugal      Hyatt Carlton Tower Hotel, London, England  OTHER    Mayfair InterContinental Hotel, London, England  Viking Culinary Arts Center, Dallas, TX  Four Seasons Hotel & Resort, Irving, TX  Southland Corp. Cityplace Headquarters, Dallas, TX  Four Seasons Aviara Resort, North San Diego, CA  Watkins & Eager Law Office, Jackson, Mississippi 
    14.   Four Seasons Hotel at Kingdom Center  Riyadh, Saudi Arabia  New construction  249 rooms, 2 restaurants, function spaces & public spaces    Interior Architecture: Wilson Associates, Dallas  Interior Design: Wilson Associates, Dallas  Building Architecture: Ellerbe Becket, Minneapolis 
    15.   Westin Book Cadillac Hotel  Detroit, Michigan  Renovation of historic hotel  455 rooms,  restaurant, bar, function spaces, public spaces & fitness  center    Interior Architecture: ForrestPerkins, Dallas  Interior Design: ForrestPerkins, Dallas  Building Architecture: Kaczmar Architects Incorporated, Cleveland  Lighting Design: Illuminating Concepts, Detroit 
    16.   Private Palace & Villa  Abu Dhabi, UAE  New construction  75,000 sf  with gardens on 40 acre site    Interior Architecture: Wilson & Associates, Dallas  Interior Design: Wilson & Associates, Dallas  Architect of Record: Ghazi Awad Architects, Abu Dhabi  Landscape Design: EDAW, Denver  Lighting Design: Craig Roberts Associates, Dallas  Specialist Painting: Peter F. Gorman & Associates Inc. , Vancouver, BC    
    17.   JW Marriott Resort and Spa  San Antonio, Texas  New construction  1002 rooms, 2 restaurants, 2 bars, function spaces, public spaces, spa  & golf clubhouse    Interior Architecture: ForrestPerkins  Interior Design: ForrestPerkins  Building Architecture: HKS Inc.  Lighting Design: Lang Lighting, Dallas  Graphics and Signage: David Carter Associates, Dallas 
    18.   Ritz Carlton Club and Residences  San Francisco, California  Conversion  of historic office building  49 club units, 53 luxury residences, public spaces & lounge    Interior Architecture: ForrestPerkins, Dallas  Interior Design: ForrestPerkins, Dallas  Building Architecture: Office of Charles F Bloszies, San Francisco  Lighting Design: O’Mahony & Myer, San Rafael, CA 
    19.   Disney Wilderness Lodge  Disney World, Florida  New construction  1200 rooms, 2 restaurants, bar, gift shop & public areas    Interior Architecture: Urban Design Group / Wilson Associates  Interior Design: Wilson Associates, Dallas  Building Architecture: Urban Design Group, Denver  Lighting Design: Lighting Design Alliance, Los Angeles 
    20.   Burj Al Arab Hotel (originally Chicago Beach Hotel)  Dubai, UAE  Concept and Design Development  202 suites, restaurants, public areas    Building Architecture:  WS Atkins, London  Interior Architecture: Wilson & Associates, Dallas  Interior Design: Wilson & Associates, Dallas   
    21.   Renaissance Grand Hotel  St Louis, Missouri  Historic renovation and new construction  900 rooms, 2 restaurants, bar, function spaces & public areas    Interior Architecture: ForrestPerkins, Washington, DC  Interior Design: ForrestPerkins, Dallas & Washington, DC  Design Architect: Peter Filat, Baltimore  Architect of Record: RTKL, Dallas & Washington, DC  Lighting Design: Randy Burkett Lighting Design, St. Louis 
    22. Offices of Wilson Gregory Aeberhard  London 
    23. harris architecture + design management MANAGEMENT EXPERIENCE  Roger Harris brings over twenty five years of international architectural, interior design  and project management experience to the leadership of HARRIS ARCHITECTURE +  DESIGN MANAGEMENT. Over the course of his career he has actively managed the  design teams of large luxury hotel, resort and spa projects in the United States,  Canada, Europe, and the Middle East.  Building on his experience with complex design  teams, Mr. Harris brings a seasoned approach to his work that objectively merges  project and design management.  Prior to establishing HARRIS a+dm Mr. Harris provided design and project  management services as Principal and Vice President of International Design  Development, Inc. (IDDI), a Dallas firm with projects in the United Kingdom, Middle  East, and  United States, and as the client representative on an Abu Dhabi, UAE Palace  and Villa.  He also held senior management positions in two international interior  architectural design firms – Wilson & Associates and ForrestPerkins, both in Dallas –  serving as Project Director/Senior Project Manager on a wide range of domestic and  international projects for Fairmont, Four Seasons, Marriott, Westin, Ritz‐Carlton, Hyatt,  InterContinental, and Disney.  Many projects were accomplished during two years as  Director of Operations in the London office of Wilson & Associates.  Mr. Harris is a registered architect and a member of the American Institute of  Architects and the Texas Society of Architects.   
    24. Interior Design: Wilson Associates  Disney Wilderness Lodge / Lobby  Orlando, FL 
    25. Why Design Management?  Improved Design Team Performance  • Better  design.  By  coordinating  scope,  minimizing  conflicts,  and  actively  monitoring  progress,  the  design  team  spends  more  time  on design.   • Better documentation. Coordinated and comprehensive, with less  duplication,  fewer  gaps,  and  a  consistent  attention  to  design  detail.  • Designs  within  budget.  Designing  to  the  budget  is  not  only  the  design  team’s  responsibility,  but  it  is  also  the  best  way  to  ensure  time is spent on design – not redesign.  • Deadlines met. Realistic planning, clear communication and active  management  mean  presentations,  drawings,  and  submittal  reviews are on time.   Improved Project Team Performance  • Efficiency. The singular focus of active design management brings  multiple design efforts into alignment, and offers a single point of  contact for design communication, direction and approval.  • Communication.  Active,  involved  communication  facilitates  the  successful  design  team,  and  regular,  succinct  communication  regarding  their  efforts  keeps  the  client  and  the  project  team  properly informed.   • Consistency.  Design  consultants  are  likely  to  change  from  project  to project. Design management offers a consistent interface even  when the design team changes.   Improved Projects  • The  quality  of  a  project  is  always  under  pressure  –  even  with  the  most talented consultants. It takes constant attention to keep the  design effort moving forward efficiently. Creative, productive, and  efficient.  • What  is  designed  is  built.  Quality  drawings  and  active  monitoring  assures  that  the  design  is  not  diminished  during  the  construction  process  –  an all too frequent occurrence. 
    26. Architecture: Charles  F Bloszies  Ritz‐Carlton Club & Residences  San Francisco, CA 
    27. HARRIS a+dm provides the following  services  Design activities start early and stay late. To assure efficient management of  all  design  scenarios,  HARRIS  a+dm  provides  these  general  categories  of  service:  Design Contract Coordination  The realistic evaluation of the design consultants’ capabilities and a  coordinated delineation of their scope form a foundation for the hospitality  design team’s work.  As such, their individual contracts are more than legal  agreements – they are guiding documents for their collaborative efforts and a  fundamental component of their success as a team. Services include project  analysis, consultant team evaluation, and detailed scope assignment to avoid  many typical conflicts before they start.  Design Management   Active and objective design management of the Architect, Interior Designer,  and other primary design consultants is required to meet the measurable  goals of budget and schedule without compromising the equally important  design expectations for the project. In addition to the Contract Coordination  services mentioned above, Design Management services include confirming  schedule and staffing, review of design and documentation planning, and   active monitoring of the design effort from Concept Design through  construction – with proactive intervention as required.     Design Administration  All project teams are different, and in some cases the addition of organized  support for a strong owner, operator or project manager may sufficiently  complement an existing design team to assure maximum design value is  achieved. Design Administration services include active monitoring of design  related communication and tasks, and regular communication to the Client  and Project Manager regarding the progress of the design effort.  Distinct Services  For existing projects, or projects where comprehensive design management  is not warranted, individual design management services can be provided on  an as‐needed basis, including dispute or issue resolution and milestone  document audits. 
    28. harris architecture + design management SERVICES / Design Contract Coordination  HARRIS a+dm provides the following Design Contract Coordination Services as an integral  part of Design Management or as a stand‐alone service.  PRE‐DESIGN PHASE        • Review the Client/Owner’s design priorities for the project.  • Analyze the design and documentation requirements for the project.  • Review the clients RFP to assure that those requirements have been accurately conveyed  to the  potential  consultants.  • Evaluate the selected consultants’ capabilities during office visits, in‐depth discussions with the  proposed project team and manager, and a thorough review of the consultants’ standard design  documentation.   • Report to the client on the relative strengths of the primary design team members, including design  and documentation.  • Review the project schedule, budget and design standard with the consultants and obtain  confirmation of their understanding and acceptance.  • Conduct a working session to finalize an expanded differentiation document establishing detailed  design and documentation requirements.  • Issue a final report on the differentiation document including any concerns regarding the capabilities  of the selected design team to achieve the project goals.   • With the design team, prepare a coordinated design and documentation milestone schedule.  • Establish guidelines for design consultant communication.  • Moderate a work session to resolve procedures for concurrent use of CAD drawings during the  project.  • Evaluate the sufficiency of consultant fees and staff availability.  • Assist the Client/Owner in finalizing coordinated agreements with the primary design consultants.     
    29. harris architecture + design management SERVICES / Design Management  HARRIS a+dm provides the following Design Management Services to focus and maximize  the efforts of the primary design team.    PRE‐DESIGN PHASE (see previous page)       DESIGN & DOCUMENTATION PHASES  • Review Client’s budget and suggest design contingencies to carry in milestone cost estimates.  • Coordinate the efforts of the primary design consultants, and resolve conflicts if they occur.  • Monitor the primary design consultants’ contract compliance and mediate disagreements regarding  scope of work.  • Facilitate the development of a comprehensive design and documentation schedule.  • Monitor communication between consultants and notify client if warranted; record significant project  related communication.  • Review minutes of project team meetings and attend specific meetings.  • Plan coordinated and pro‐active design team agendas.  • Schedule, moderate, and minute specific design meetings.  • Frame issues and questions for consideration by the owner, operator or other design team members.  • Document design decisions and maintain a design and documentation task list.  • Review drawings for compliance with project design program. Review results  with design consultants  and monitor follow‐up.  • Issue monthly status reports noting design consultant progress, and proposing remedial action if  required.  • Monitor the design consultants’ compliance with key performance components including schedule,  budget, operator standards and client comments.  • Review and formalize the documentation requirements for each milestone drawing issue.  • Attend specific design presentations and prepare a  task list for each design consultant based on  comments received.  • Assist with documentation planning and perform milestone document audits.  • Review design consultants’ invoices against design and documentation progress, and evaluate  Additional Service requests.  CONSTRUCTION PHASE  • Facilitate review of the design requirements with bidders.   • Establish and document requirements and schedule for material samples and mock‐ups.  • Monitor design consultants’ activities affecting design quality, project budget and construction progress,  and proactively intervene as required.  • Review minutes of project team meetings and attend specific meetings.  • Monitor design consultants response to contractor and purchasing agent queries and RFIs.  • Review design consultant punch lists, visit the project site to observe the implementation of the design,  and produce a design and construction task list of incorrect or omitted items.
    30. harris architecture + design management SERVICES / Design Administration  HARRIS a+dm provides the following Design Administration Services as a limited alternative  to full Design Management .  PRE‐DESIGN PHASE        • Review the Client/Owner’s design priorities for the project.  • Review the design and documentation requirements for the project.  • Review the selected consultants’ capabilities and standard documentation.   • Record the established project schedule, budget and design standards.   • Record the established differentiation document.   • Record the design and documentation milestone schedule.  • Review guidelines for design consultant communication.  • Review procedures for concurrent use of CAD drawings during the project.  DESIGN & DOCUMENTATION PHASES  • Record Client’s budget and requirements for milestone cost estimates.  • Monitor the primary design consultants’ contract compliance.  • Review the comprehensive design and documentation schedule developed by the consultants.  • Monitor and record significant communication between consultants and notify client if warranted.  • Review design team agendas.  • Review minutes of project team meetings.   • Review minutes of specific design meetings   • Document design decisions and design & documentation task lists.  • Review drawings for compliance with project design program and issue results. Monitor consultant  follow‐up.  • Issue monthly status reports noting design consultant progress on recorded tasks.  • Monitor the design consultants’ compliance with recorded schedule, budget, operator standards and  client comments.  • Record the design consultants’ documentation requirements for each milestone drawing issue.  • Review minutes of design presentations and prepare a task list for each consultant based on  comments received.  • Perform milestone document audits.  • Review design consultants’ invoices against design and documentation progress.  CONSTRUCTION PHASE  • Review requirements and schedule for material samples and mock‐ups.  • Monitor design consultants’ activities affecting design quality, project budget and construction  progress. Advise client if warranted.  • Review minutes of project team meetings.  • Monitor design consultants response to contractor and purchasing agent queries and RFI’s  • Review construction punch lists.     
    31. harris architecture + design management SERVICES / Distinct Services  HARRIS a+dm provides the following Design Management Services on a stand‐alone basis  as needed.  PRE‐DESIGN PHASE        • Analyze and report on the design and documentation requirements  of the project.  • Evaluate existing properties for design needs and design team requirements.  • Evaluate the design documentation requirements of the project, including an analysis of the need for  as‐built drawings on existing projects.  • Attend and take part in consultant interviews, and report observations.  • Evaluate the proposed or selected design consultants and report on the relative strengths of the  primary design team members, including design and documentation capabilities.  • Conduct a work session to finalize an expanded differentiation document establishing detailed  design and documentation requirements.  • Evaluate the sufficiency of consultant fees and staff availability.  • Assist in finalizing coordinated agreements with the primary design consultants.  DESIGN & DOCUMENTATION PHASES  • Review drawings for compliance with project design program.  • Review the design consultants’ staffing and labor estimates and evaluate their adequacy for  completing the project or interim milestone event.  • Perform milestone document audits for consistency, completeness, and suitability for use during  construction. Issue a design and construction task list of incorrect or omitted items.  CONSTRUCTION PHASE  • Assist in resolving conflicts between the ownership, the design team, and the contractor.  • Visit the project to observe the implementation of the design, and produce a design and construction  task list of incorrect or omitted items.  POST‐CONSTRUCTION  • Review and evaluate claims regarding the design teams’ performance.   
    32. harris architecture + design management harris architecture + design management 7134 glendora avenue dallas, texas 75230 www.harris-adm.com Phone: 214.265.7670 Fax: 214.361.8944 Email: info@harris-adm.com + SEEING QUALITY THROUGH 07/01/09

    + ArchDsgnMgmtArchDsgnMgmt, 4 months ago

    custom

    443 views, 1 favs, 0 embeds more stats

    Review of HARRIS Architecture + Design Management s more

    More info about this document

    © All Rights Reserved

    Go to text version

    • Total Views 443
      • 443 on SlideShare
      • 0 from embeds
    • Comments 0
    • Favorites 1
    • Downloads 18
    Most viewed embeds

    more

    All embeds

    less

    Flagged as inappropriate Flag as inappropriate
    Flag as inappropriate

    Select your reason for flagging this presentation as inappropriate. If needed, use the feedback form to let us know more details.

    Cancel
    File a copyright complaint
    Having problems? Go to our helpdesk?

    Categories