Datastage Training | Datastage Online Training

396 views

Published on

Email: Info@araniconsulting.com for more details on Datastage Training

Published in: Education
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
396
On SlideShare
0
From Embeds
0
Number of Embeds
5
Actions
Shares
0
Downloads
8
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Datastage Training | Datastage Online Training

  1. 1. Email: Info@araniconsulting.com or Visitwww.araniconsulting .comCOURSE NAME : DATA STAGECOURSE DURATION : 40 HOURSSTEP-1 DATA WAREHOUSE FUNDAMENTALS • An Introduction of Data warehousing • purpose of Data warehouse • Data ware Architecture • OLTP Vs Data warehouse Applications • Data Marts • Data warehouse Lifecycle • SDLCSTEP-2 DATA MODELING • Introduction of Data Modeling • Entity Relationship Model • Dimensions and Fast Tables • Logical Modeling • Physical Modeling • Schemas Like Star Schema & Snowflake Schemas • Fact less Fact TablesSTEP-3 PROCESS OF ETL (EXTRACTION, TRANSACTION @LOAD) • Introduction of Extraction , Transformation and Loding • Types of ETL tools • Key tools in the marketSTEP-4 INSTALLATION PROCESS • Windows server • Oracle • .NET • Datastage 7.5X2 & 8x
  2. 2. STEP-5 DIFFERENCE • Server jobs & Parallel jobsSTEP-6 COMPONENTS IN DATASTAGE • Administrator clint • Designer client • Director client • Import/export manager • Multi client manager • Console for IBM imformation server • Web console for IBM imformation serverSTEP-7 INTRODUCTION TO IBM WEB SPHERE DATASTAGE AND QUALITYSTAGE 8X • Datastage Introduction • IBM Information server Architecture • IBM Data Quality Architecture • EnterpriseInformation Integration • Web Sphere DataStage ComponentsSTEP-8 DATASTAGE DESIGNER • About Web Sphere DataStage Designer • Partitioning Methods • Partitioning Techniques • Designer Canvas • Central Storage • Job Designing • Creating the Jobs • Compiling and Run the Jobs • Exporting and importing the jobs • Parameter passing • System(SMP) & Cluster system(MPP) • Importing Method(Flat file, Txt, Xls and Database files) • OSHImporting Method • Configuration fileSTEP-9 PARALLEL PALETTE • DATABASES STAGES o Oracle Database o Dynamic RDBMS o ODBC o SQL Server o Teradata • FILE STAGES o Sequential File
  3. 3. o Dataset o Lookup File set • DEV/DEBUG STAGES o Peek o Head o Tail o Row Generator o Column Generator • PROCESSING STAGES o Slowly changing dimension stage o Slowly changing dimensions implementation o Aggregator o Copy o Compress o Expand o Filter o Modify o Sort o Switch o Lookup o Join o Marge o Change Capture o Change Apply o Compare o Difference o Funnel o Remove Duplicate o Surrogate Key Generator o Pivot stage o TransformerCONTANERS • Shared Containers • Local ContainersSTEP-10 DS-DIRECTOR • About DS Director • Validation • Scheduling • Status • View logs • Monitoring • Suppress and Demote the Warnings • Peek viewSTEP-11 DATASTAGE ADMINISTRATOR
  4. 4. • Create Project • Delete Project • Protect Project • Environmental variables • Auto purge • RCP • OSH • Commands Execute • Multiple Instances • Job Sequence SettingsSTEP-12 JOB SEQUENCE AREA • Job Activity • Job sequencer • Start loop Activity • End loop Activity • Notification Activity • Terminator Activity • Nested Condition Activity • Exception handling Activity • Execute Command Activity • Wait for file Activity • User variable Activity • Adding Check Points • RestartableSTEP-13 IBM WEB SPHERE QUALITY STAGE • Data Quality • Data Quality Stages • Investigate Stage • Standardize Stage • Match Frequency Stage • Reference Match Stage • Unduplicated Match Stage • Survive Stage • Viewing audit details in operational DASHBOARD reportsKEY SERVICE • FAQS • Covering DBA concepts • Concentration on performance tuning • Real time scenarios • Certification guidance • Resume preparation • Sample resumes • Interview & certification FAQS • How to face the interview
  5. 5. • Class notes which is useful for who is trying for job• Project preparation

×