0
Industrialised Building System (IBS)
1. What is IBS?
2. Why IBS?
2.1 To our economy?
2.1 Job Opportunities?
3. Types of IB...
Industrialised Building System (IBS)

1. What is IBS?
“A construction technique in which
components are manufactured in a ...
3
Industrialised Building System (IBS)

1.1 History of IBS
a) Concept IBS in not new and can be traced
back to as early 1624...
Industrialised Building System (IBS)
Crystal Palace, Hyde Park

During construction 1840

Picture taken in 1851
5
Industrialised Building System (IBS)
Eiffel Tower, Paris

During construction 1878

Picture taken in 1945
6
Industrialised Building System (IBS)

1.2 History of IBS in Malaysia
a) Concept IBS in Malaysia is not new
b) In 1966 the ...
Industrialised Building System (IBS)

1.2 History of IBS in Malaysia

KLCC

Pekeliling Flats

LRT Station

KL Tower

8
Industrialised Building System (IBS)

1.3 Characteristics of IBS
1.3.1 Five Characteristics of IBS are :
a) Industrial pro...
Industrialised Building System (IBS)

2. Why IBS
Budget Speech 2005
“The Government is determined to ensure that
every Mal...
Industrialised Building System (IBS)

2.1 The Current Scenario of
Malaysian Construction Industry

This can contributes : ...
Industrialised Building System (IBS)

2.2 Social Problems
a) Currently 75 foreign workers out of 100
construction workers
...
Industrialised Building System (IBS)

2.3 Benefits
a)Reduction of site labour
b)Minimal Wastage
c) Less site material
d)Cl...
Industrialised Building System (IBS)

2.4 Case Study

Parcel 5 & 6, Precinct 9

Parcel 4, Precinct 9

750 units (900 sqft)...
Industrialised Building System (IBS)

3. Types of IBS
3.1 In general, the construction method can be
classified into 4 cat...
Industrialised Building System (IBS)

3. Types of IBS (cont’d)
3.3 The construction method can be classified
into 4 catego...
Industrialised Building System (IBS)

3. Types of IBS (cont’d)
3.4 Based on structural aspects, IBS can be
divided into fi...
Industrialised Building System (IBS)

3. Types of IBS (cont’d)
3.4.2 Type 2 : Steel Formwork Systems

e.g: Tunnel Formwork...
Industrialised Building System (IBS)

3. Types of IBS (cont’d)
3.4.3 Type 3 : Steel Frame System

e.g: Steel Beam, columns...
Industrialised Building System (IBS)

3. Types of IBS (cont’d)
3.4.4 Type 4 : Prefabricate Timber Frame System

e.g: Timbe...
Industrialised Building System (IBS)

3. Types of IBS (cont’d)
3.4.5 Type 5 : Blockwork Systems

e.g: Interlocking concret...
Industrialised Building System (IBS)

4. Problems Faced by IBS
a) Only 15% contractors using IBS, Why?
i) Lack of Expertis...
Industrialised Building System (IBS)

4. Problems Faced by IBS
4.1 Lack of Expertise / Lack of Experience
a) Lack of exper...
Industrialised Building System (IBS)

4. Problems Faced by IBS
4.2 Cost
a) Only 15% contractors using IBS, because the
low...
Upcoming SlideShare
Loading in...5
×

Ibs part1

1,195

Published on

document not mine. credits to the owner

Published in: Education, Business, Real Estate
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
1,195
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
59
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide
  • {}
  • Transcript of "Ibs part1"

    1. 1. Industrialised Building System (IBS) 1. What is IBS? 2. Why IBS? 2.1 To our economy? 2.1 Job Opportunities? 3. Types of IBS? 4. Problem Faced by IBS 1
    2. 2. Industrialised Building System (IBS) 1. What is IBS? “A construction technique in which components are manufactured in a controlled environment (on or off site), transported, positioned and assembled into a structure with minimal additional site works” 2
    3. 3. 3
    4. 4. Industrialised Building System (IBS) 1.1 History of IBS a) Concept IBS in not new and can be traced back to as early 1624 b) In 1624, panellised timber houses were shipped from England to the new settlement in North America c) 1851 Crystal Palace in Hyde Park, London and 1889 Eiffel Tower, Paris 4
    5. 5. Industrialised Building System (IBS) Crystal Palace, Hyde Park During construction 1840 Picture taken in 1851 5
    6. 6. Industrialised Building System (IBS) Eiffel Tower, Paris During construction 1878 Picture taken in 1945 6
    7. 7. Industrialised Building System (IBS) 1.2 History of IBS in Malaysia a) Concept IBS in Malaysia is not new b) In 1966 the two pilot project started by using IBS concept. Namely? i) Pekeliling Flat, Kuala Lumpur ii) The Rifle Range Flat, Penang c) In 1981-1993 PKNS acquired pre-cast concrete technology from Praton Haus International, Germany to built housing project 7
    8. 8. Industrialised Building System (IBS) 1.2 History of IBS in Malaysia KLCC Pekeliling Flats LRT Station KL Tower 8
    9. 9. Industrialised Building System (IBS) 1.3 Characteristics of IBS 1.3.1 Five Characteristics of IBS are : a) Industrial production of components though prefabrication b) Reduced labour during prefabrication of components and site works c) Modern design and manufacturing method using CAD/CAM d) Systematic Quality Control i.e ISO 9000 e) Open Building System i.e permitting hybrid applications 9
    10. 10. Industrialised Building System (IBS) 2. Why IBS Budget Speech 2005 “The Government is determined to ensure that every Malaysian will have access to affordable homes. During the period 1971-2003, the Government constructed 490,000 units of low-cost houses. The government intends to provide an additional 100,000 units of affordable homes to be implemented through the Industrialised Building System (IBS).This system will ensure quality, save cost, create a safer and cleaner working environment as well as reduce the dependence of foreign workers” 10
    11. 11. Industrialised Building System (IBS) 2.1 The Current Scenario of Malaysian Construction Industry This can contributes : Messy Sites, High Wastage, Labour Intensive, Low Quality and Delays 11
    12. 12. Industrialised Building System (IBS) 2.2 Social Problems a) Currently 75 foreign workers out of 100 construction workers b) There are 318,000 foreign workers in Malaysian Construction Industry Let say one foreign worker gain RM400 pe rmonth; RM400.00 x 12 months = RM5,000 per year, 318,000 x RM5,000 = RM 1.59 Billion per year It shows the High outflow of Ringgit 12
    13. 13. Industrialised Building System (IBS) 2.3 Benefits a)Reduction of site labour b)Minimal Wastage c) Less site material d)Cleaner environment e)Controlled quality f) Neater and safer sites g)Faster project completion h)Lower total construction costs due to the above 13
    14. 14. Industrialised Building System (IBS) 2.4 Case Study Parcel 5 & 6, Precinct 9 Parcel 4, Precinct 9 750 units (900 sqft) 520 units (1000 sqft) Durations : 18 months Durations : 18 months 14
    15. 15. Industrialised Building System (IBS) 3. Types of IBS 3.1 In general, the construction method can be classified into 4 categories : a) Conventional Method b) Cast-in situ c) Composite Method d) Fully prefabricated 1st ASSIGNMENT -Form a group which is consist min of 5 members. -Each group will elaborate what is a), b), c) and d) -Please attach pictures and references to support your finding. 3.2 Method b,c and d can be classified as non conventional methods and all types of IBSs are categorized under these three 15
    16. 16. Industrialised Building System (IBS) 3. Types of IBS (cont’d) 3.3 The construction method can be classified into 4 categories : 16
    17. 17. Industrialised Building System (IBS) 3. Types of IBS (cont’d) 3.4 Based on structural aspects, IBS can be divided into five major types : 3.4.1 Type 1 : Pre-Cast Concrete Framing, Panel and Box System e.g: Pre-Cast Columns, Beams, Slabs, Staircase, Toilet 17
    18. 18. Industrialised Building System (IBS) 3. Types of IBS (cont’d) 3.4.2 Type 2 : Steel Formwork Systems e.g: Tunnel Formwork, Beam, Column and slab moulding form 18
    19. 19. Industrialised Building System (IBS) 3. Types of IBS (cont’d) 3.4.3 Type 3 : Steel Frame System e.g: Steel Beam, columns, portal frames, roof trusses 19
    20. 20. Industrialised Building System (IBS) 3. Types of IBS (cont’d) 3.4.4 Type 4 : Prefabricate Timber Frame System e.g: Timber frame, timber roof trusses 20
    21. 21. Industrialised Building System (IBS) 3. Types of IBS (cont’d) 3.4.5 Type 5 : Blockwork Systems e.g: Interlocking concrete masonry unit (CMU), lightweight concrete blocks 21
    22. 22. Industrialised Building System (IBS) 4. Problems Faced by IBS a) Only 15% contractors using IBS, Why? i) Lack of Expertise / Lack of Experience ii) Cost 22
    23. 23. Industrialised Building System (IBS) 4. Problems Faced by IBS 4.1 Lack of Expertise / Lack of Experience a) Lack of experience practicing/designing IBS by the consultants/contractors/clients b) Short of experience workers in the manufacturing and installation works (most of them are foreign workers) c) Defect works by previous pre cast system (close system) d) QS lack of experience pricing the IBS projects (most of them not pricing the total cost of project) 23
    24. 24. Industrialised Building System (IBS) 4. Problems Faced by IBS 4.2 Cost a) Only 15% contractors using IBS, because the low labour cost in this country is the root causes b) Labour cost is cheap, so why IBS? 24
    1. A particular slide catching your eye?

      Clipping is a handy way to collect important slides you want to go back to later.

    ×