PX Airside Health and Safety Procedure
Air Niugini Engineering | Airside Occupational Health and safety procedure 1
Compiled by Andrew Louis Ref: PX ASM RHO, IATA Ramp Service, UK CAA – Airside Safety Management
IATA affiliate – FSF ROSP & FAA LOSA Program
Airside Occupational Health and Safety Procedure
Four Fundamental Airside Occupational Health and Safety procedure, listed as follows;
1. Hearing Conversation (Workplace Communication)
2. Hygiene at Workplace (Clean and Tidy Working Environment)
3. Protective Clothing and Equipment Usage
4. Manuel Handling and Lifting Activity
Procedures to be adhere!
1 Hearing Conservation
1.1 Tarmac (airside) is a high-noise area where the use of personal hearing protection is
essential.
1.2 Airside personnel/staff must always use personal hearing protection gear that is
approved by the Airline Operator for the specific operational task.
1.3 In addition to regular checks of their hearing protection apparatus, personnel should
also have regular hearing tests. Regular, hearing test is compulsory.
1.4 All personnel/staff performing at airside are to be familiar and aware on how to
handle and avoid serious injuries such as listed below; if one of the listed events occurred,
refer to Manuals.
a) Bleeding
b) Fracture
c) Burns & Scalds
d) Eye Injuries
e) Electric Shock
1.5 All personnel/staff performing at airside operation area are not to use any mobile
devices and audio head phones.
1.6 No rough or boisterous playing and practical jokes which may lead to injury or
damage that is likely to impair performance.
PX Airside Health and Safety Procedure
Air Niugini Engineering | Airside Occupational Health and safety procedure 2
Compiled by Andrew Louis Ref: PX ASM RHO, IATA Ramp Service, UK CAA – Airside Safety Management
IATA affiliate – FSF ROSP & FAA LOSA Program
2 Hygiene
2.1 In order to protect against personnel health impediment, and the health of others
involved, airside personnel/staff must thoroughly wash their hands before eating or
drinking any food staff after servicing, which involves the following active areas:
a. Lavatory Handling
b. Baggage Handling.
c. Cabin Cleaning.
d. Maintenance and Component replacement activity.
e. GSE Handling and Maintenance activity.
f. Aircraft Safety Gears Placement.
g. Ancillary Equipment Handling.
2.2 All personnel/staff performing at airside must also wear gloves when servicing
aircrafts and handling passengers.
2.3 After servicing, personnel/staff should wash their hands with recommended detergent
cleaner before break or discontinue for other attention.
2.4 If hit by an equipment or aircraft component by accident, cover open cuts and
scratches with waterproof bandages and report to the supervisor immediately. Withdraw duty,
seek medical attention.
2.5 Those involved in the aircraft toilet servicing (Lavatory) require full suits of
protective clothing, gloves and mask must be worn when servicing.
2.6 All personnel/staff performing at airside operation area are to ensure that clean and
tidy workplace is demonstrated. Gears worn and control of facilities/material must be
acceptable to the standard and hygiene requirements.
2.7 Personnel/staff performing at Airside operations area are not to chew buai, or be in
position, to share or distribute among others in the workplace. If found of such act will be
penalized accordingly.
2.8 All personnel/staff performing at Airside Operation area are prohibited to Smoking at
any one time within the perimeter of the operation area or during active duty. Remember:
Smoke Kills.
2.9 No alcoholic drinks or any drugs, legal or illegal that is likely to impair performance
or judgment. Personnel/staff will be penalized, if found under the influence of the restricted
drugs and alcoholic.
2.10 Immediately report to a supervisor, and take proper rest, if you are under the influence
of the prohibited Substance
2.11 All airside working environment including workplace and tarmac operation area must
be hygienic and neat at all times.
PX Airside Health and Safety Procedure
Air Niugini Engineering | Airside Occupational Health and safety procedure 3
Compiled by Andrew Louis Ref: PX ASM RHO, IATA Ramp Service, UK CAA – Airside Safety Management
IATA affiliate – FSF ROSP & FAA LOSA Program
2.12 During walkaround, servicing and maintenance activity ensure all FOD are
considered and remove to make the working parameter clean and safe.
3 Protective Clothing and Equipment
3.1 All personnel/staff performing at Airside must wear full safety gears such as;
a. Footwear,
b. Gloves,
c. Knee pads (if required)
d. High-visibility clothing(vest),
e. Toilet-servicing protective Suits
f. Wet and winter weather jacket. (Rain Coat),
g. Sun hats and sunglasses.
h. Earmuffs and Ear plugs
3.2 High-visibility clothing or vest should be mandatory on the airside operation area.
Clothing styles should fit comfortably to prevent becoming snagged.
3.3 All personnel/staff operating and handling equipment must be well trained, qualified,
as well as physically and mentally be healthy and fit proper person to engage in airside
activity.
3.4 All personnel/staff performing at airside must be aware of fire protection technique
and preventive procedure.
3.5 It is compulsory; they have basic knowledge of the use of fire extinguisher and its
emergency evacuation procedure in the event of fire or any event relating to fire.
3.6 It is mandatory; all personnel/staff operating at airside operation area must be trained
on the operation and practice of ground and cabin fire evacuation procedure.
3.7 All personnel/staff performing at airside operation area, as equipment/vehicle operator
must always drive within speed limit recommended by the Airport Authority.
(Speed Limit: 10 KPH)
3.8 Gloves or other protective measures must be taken before Handling Dangerous
Goods. If contracted with infectious substance, report immediately to the supervisor, seek
medical attention ASAP.
3.9 During severe weather condition i.e. heavy downpour, thunderstorm & deluge stop
aircraft servicing immediately. Do not run to reach shelter as wet environment and tarmac
can cause harm or danger.
3.10 During higher wind and lightening thunder storms, all personnel/staff performing at
airside operation area should not,
a. Stay out in the open area,
b. Take shelter under an aircraft,
c. Load and unload explosive or flammable material.
PX Airside Health and Safety Procedure
Air Niugini Engineering | Airside Occupational Health and safety procedure 4
Compiled by Andrew Louis Ref: PX ASM RHO, IATA Ramp Service, UK CAA – Airside Safety Management
IATA affiliate – FSF ROSP & FAA LOSA Program
4 Manual Handling and Lifting
4.1 Back injuries including other health problems are common for airside personnel/staff.
Risk or causes may include the following;
a) Improper lifting techniques,
b) Poor work attitude,
c) Lack of fitness towards work,
d) Fatigue and stress,
e) Not stretching before lifting
f) Lifting excessive loads.
4.2 Follow these guidelines for manual handling and lifting is a supportive tool for safe
practices:
• Test the object’s weight before lifting; get help if it is too heavy.
• Place your feet in a comfortable, balanced position before lifting.
• Bend your knees and, if possible, hold the load with both hands.
• Keep your back straight. Lift the load gradually by straightening your legs.
• Let your thighs, not your lower back, do the work. Keep your arms and elbows
close to your body.
• Do not twist your body to change direction.
• Carry the load close to your body, and watch where you are going.
• Use the same techniques in reverse when lowering the load.
This guideline is an aid to personnel/staff as to avoid personnel injuries during manual (handling &
lifting) servicing.
4.3 Many airlines have introduced maximum weight limits for checked passenger
baggage. All personnel/staff performing at airside operation area are to comply with the
weight limit during lifting or handling.
4.4 The limits vary from airline to airline, and some carriers have different weight limits
depending on the class of travel. If excessive weight is advised, use recommended lifting
procedure or 1-2 personnel/staff must be involved in the lifting process.
4.5 Current recommended limits include 20 kilograms (44 pounds), 23 kilograms (51
pounds) and 32 kilograms (70 pounds). On behave of PX, this recommended limits are
subject to change as per operations procedure & requirements.
PX Airside Health and Safety Procedure
Air Niugini Engineering | Airside Occupational Health and safety procedure 5
Compiled by Andrew Louis Ref: PX ASM RHO, IATA Ramp Service, UK CAA – Airside Safety Management
IATA affiliate – FSF ROSP & FAA LOSA Program
4.6 Some airlines will accept heavier bags if the passenger pays an excess-baggage
charge. . Therefore, however if excessive weight is advised, use recommended lifting
procedure and technique. (i.e. application of mobile lifting Equipment)
4.8 Some items of baggage and cargo will exceed the given limits; consideration should
be given to the use of motorized lifting equipment.
4.9 If baggage excessive load is not possible to be lifted, two-person lifting is essential.
4.10 During shift change over, all personnel/staff on the departing shift are not to execute
duty in any way unless upon approval.
4.11 Proper rest is compulsory, if any signs of sickness, stress and fatigue, report
immediately to the supervisor and take proper rest for further attention.

More Related Content

What's hot

GROUND HANDLING QUICK GUIDE
GROUND HANDLING QUICK GUIDEGROUND HANDLING QUICK GUIDE
GROUND HANDLING QUICK GUIDETranos Matezhure
 
Types of Ground Handling Operations
Types of Ground Handling OperationsTypes of Ground Handling Operations
Types of Ground Handling OperationsTransworld Aviation
 
airside operation 3
airside operation 3airside operation 3
airside operation 3AiDY
 
Safe Push back Procedure.
Safe Push back Procedure.Safe Push back Procedure.
Safe Push back Procedure.Andrew Louis
 
Flight safety awareness program
Flight safety awareness  programFlight safety awareness  program
Flight safety awareness programS P Singh
 
AIRPORT EMERGENCY PLAN FAAN.pdf
AIRPORT EMERGENCY PLAN FAAN.pdfAIRPORT EMERGENCY PLAN FAAN.pdf
AIRPORT EMERGENCY PLAN FAAN.pdfcosmasejide1
 
Aviation terminology by Kalyan S Patil
Aviation terminology by Kalyan S PatilAviation terminology by Kalyan S Patil
Aviation terminology by Kalyan S PatilKalyan S Patil
 
AIRSEDE OPERATION
AIRSEDE OPERATIONAIRSEDE OPERATION
AIRSEDE OPERATIONAiDY
 
Ground Handling
Ground HandlingGround Handling
Ground HandlingToy Ang
 
Global logistics
Global logisticsGlobal logistics
Global logisticsManu Singh
 
Transportation Security Administration "TSA 101"
Transportation Security Administration "TSA 101"Transportation Security Administration "TSA 101"
Transportation Security Administration "TSA 101"TSA
 
LOAD CONTROL SUPERVISOR / LOAD PLANNER
LOAD CONTROL SUPERVISOR / LOAD PLANNERLOAD CONTROL SUPERVISOR / LOAD PLANNER
LOAD CONTROL SUPERVISOR / LOAD PLANNERGIRISHCHAVAN13
 
AVIATION PPT (RAHUL GUPTA)
AVIATION PPT (RAHUL GUPTA) AVIATION PPT (RAHUL GUPTA)
AVIATION PPT (RAHUL GUPTA) rahul gupta
 
Aircraft ground handling
Aircraft ground handlingAircraft ground handling
Aircraft ground handlingkrackerbrandon
 

What's hot (20)

Airline security new
Airline security newAirline security new
Airline security new
 
GROUND HANDLING QUICK GUIDE
GROUND HANDLING QUICK GUIDEGROUND HANDLING QUICK GUIDE
GROUND HANDLING QUICK GUIDE
 
Types of Ground Handling Operations
Types of Ground Handling OperationsTypes of Ground Handling Operations
Types of Ground Handling Operations
 
airside operation 3
airside operation 3airside operation 3
airside operation 3
 
Safe Push back Procedure.
Safe Push back Procedure.Safe Push back Procedure.
Safe Push back Procedure.
 
Flight safety awareness program
Flight safety awareness  programFlight safety awareness  program
Flight safety awareness program
 
AIRPORT EMERGENCY PLAN FAAN.pdf
AIRPORT EMERGENCY PLAN FAAN.pdfAIRPORT EMERGENCY PLAN FAAN.pdf
AIRPORT EMERGENCY PLAN FAAN.pdf
 
Aviation terminology by Kalyan S Patil
Aviation terminology by Kalyan S PatilAviation terminology by Kalyan S Patil
Aviation terminology by Kalyan S Patil
 
Airport Management 11
Airport Management  11Airport Management  11
Airport Management 11
 
AIRSEDE OPERATION
AIRSEDE OPERATIONAIRSEDE OPERATION
AIRSEDE OPERATION
 
Aircraft marshalling
Aircraft marshallingAircraft marshalling
Aircraft marshalling
 
Ground Handling
Ground HandlingGround Handling
Ground Handling
 
Global logistics
Global logisticsGlobal logistics
Global logistics
 
Transportation Security Administration "TSA 101"
Transportation Security Administration "TSA 101"Transportation Security Administration "TSA 101"
Transportation Security Administration "TSA 101"
 
LOAD CONTROL SUPERVISOR / LOAD PLANNER
LOAD CONTROL SUPERVISOR / LOAD PLANNERLOAD CONTROL SUPERVISOR / LOAD PLANNER
LOAD CONTROL SUPERVISOR / LOAD PLANNER
 
1 basic cargo course
1   basic cargo course1   basic cargo course
1 basic cargo course
 
Ramp Handling
Ramp HandlingRamp Handling
Ramp Handling
 
Aviation
AviationAviation
Aviation
 
AVIATION PPT (RAHUL GUPTA)
AVIATION PPT (RAHUL GUPTA) AVIATION PPT (RAHUL GUPTA)
AVIATION PPT (RAHUL GUPTA)
 
Aircraft ground handling
Aircraft ground handlingAircraft ground handling
Aircraft ground handling
 

Similar to Airside Occupational Health and Safety Procedure - 2015

B1_M07.17_MECH_2012.07.24 Aircraft Handling.pdf
B1_M07.17_MECH_2012.07.24 Aircraft Handling.pdfB1_M07.17_MECH_2012.07.24 Aircraft Handling.pdf
B1_M07.17_MECH_2012.07.24 Aircraft Handling.pdfKhoiTruong19
 
Eletson Familiarization
Eletson FamiliarizationEletson Familiarization
Eletson Familiarizationcyalxel
 
Airport contractor safety induction
Airport contractor safety inductionAirport contractor safety induction
Airport contractor safety inductionyasirtesters
 
JHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdf
JHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdfJHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdf
JHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdfHaroon AbdulRahim
 
Preflight safety
Preflight safetyPreflight safety
Preflight safetyabarget
 
Imo entry into enclosed space permit
Imo entry into enclosed space permitImo entry into enclosed space permit
Imo entry into enclosed space permitPrince Mathew
 
HSE Management Plan
HSE Management PlanHSE Management Plan
HSE Management PlanPhilip Hà
 
risk assessment - pile cap.pdf
risk assessment - pile cap.pdfrisk assessment - pile cap.pdf
risk assessment - pile cap.pdfmydl2
 
Health & Safety Induction Training
Health & Safety Induction TrainingHealth & Safety Induction Training
Health & Safety Induction TrainingThe Pathway Group
 
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdfFESTUS RICHARD SIAME
 

Similar to Airside Occupational Health and Safety Procedure - 2015 (20)

aviation_safety_cards.pdf
aviation_safety_cards.pdfaviation_safety_cards.pdf
aviation_safety_cards.pdf
 
B1_M07.17_MECH_2012.07.24 Aircraft Handling.pdf
B1_M07.17_MECH_2012.07.24 Aircraft Handling.pdfB1_M07.17_MECH_2012.07.24 Aircraft Handling.pdf
B1_M07.17_MECH_2012.07.24 Aircraft Handling.pdf
 
Eletson Familiarization
Eletson FamiliarizationEletson Familiarization
Eletson Familiarization
 
CHAPTER 9.pptx
CHAPTER 9.pptxCHAPTER 9.pptx
CHAPTER 9.pptx
 
Airport contractor safety induction
Airport contractor safety inductionAirport contractor safety induction
Airport contractor safety induction
 
JHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdf
JHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdfJHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdf
JHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdf
 
Preflight safety
Preflight safetyPreflight safety
Preflight safety
 
Form on1
Form on1Form on1
Form on1
 
Form on1
Form on1Form on1
Form on1
 
update 20feb1
update 20feb1update 20feb1
update 20feb1
 
Imo entry into enclosed space permit
Imo entry into enclosed space permitImo entry into enclosed space permit
Imo entry into enclosed space permit
 
On board safety
   On board safety    On board safety
On board safety
 
HSE Management Plan
HSE Management PlanHSE Management Plan
HSE Management Plan
 
risk assessment - pile cap.pdf
risk assessment - pile cap.pdfrisk assessment - pile cap.pdf
risk assessment - pile cap.pdf
 
Health & Safety Induction Training
Health & Safety Induction TrainingHealth & Safety Induction Training
Health & Safety Induction Training
 
3220 warehouse
3220 warehouse3220 warehouse
3220 warehouse
 
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
 
Cabin Safety
Cabin SafetyCabin Safety
Cabin Safety
 
CONFINED SPACES
CONFINED SPACESCONFINED SPACES
CONFINED SPACES
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 

Airside Occupational Health and Safety Procedure - 2015

  • 1. PX Airside Health and Safety Procedure Air Niugini Engineering | Airside Occupational Health and safety procedure 1 Compiled by Andrew Louis Ref: PX ASM RHO, IATA Ramp Service, UK CAA – Airside Safety Management IATA affiliate – FSF ROSP & FAA LOSA Program Airside Occupational Health and Safety Procedure Four Fundamental Airside Occupational Health and Safety procedure, listed as follows; 1. Hearing Conversation (Workplace Communication) 2. Hygiene at Workplace (Clean and Tidy Working Environment) 3. Protective Clothing and Equipment Usage 4. Manuel Handling and Lifting Activity Procedures to be adhere! 1 Hearing Conservation 1.1 Tarmac (airside) is a high-noise area where the use of personal hearing protection is essential. 1.2 Airside personnel/staff must always use personal hearing protection gear that is approved by the Airline Operator for the specific operational task. 1.3 In addition to regular checks of their hearing protection apparatus, personnel should also have regular hearing tests. Regular, hearing test is compulsory. 1.4 All personnel/staff performing at airside are to be familiar and aware on how to handle and avoid serious injuries such as listed below; if one of the listed events occurred, refer to Manuals. a) Bleeding b) Fracture c) Burns & Scalds d) Eye Injuries e) Electric Shock 1.5 All personnel/staff performing at airside operation area are not to use any mobile devices and audio head phones. 1.6 No rough or boisterous playing and practical jokes which may lead to injury or damage that is likely to impair performance.
  • 2. PX Airside Health and Safety Procedure Air Niugini Engineering | Airside Occupational Health and safety procedure 2 Compiled by Andrew Louis Ref: PX ASM RHO, IATA Ramp Service, UK CAA – Airside Safety Management IATA affiliate – FSF ROSP & FAA LOSA Program 2 Hygiene 2.1 In order to protect against personnel health impediment, and the health of others involved, airside personnel/staff must thoroughly wash their hands before eating or drinking any food staff after servicing, which involves the following active areas: a. Lavatory Handling b. Baggage Handling. c. Cabin Cleaning. d. Maintenance and Component replacement activity. e. GSE Handling and Maintenance activity. f. Aircraft Safety Gears Placement. g. Ancillary Equipment Handling. 2.2 All personnel/staff performing at airside must also wear gloves when servicing aircrafts and handling passengers. 2.3 After servicing, personnel/staff should wash their hands with recommended detergent cleaner before break or discontinue for other attention. 2.4 If hit by an equipment or aircraft component by accident, cover open cuts and scratches with waterproof bandages and report to the supervisor immediately. Withdraw duty, seek medical attention. 2.5 Those involved in the aircraft toilet servicing (Lavatory) require full suits of protective clothing, gloves and mask must be worn when servicing. 2.6 All personnel/staff performing at airside operation area are to ensure that clean and tidy workplace is demonstrated. Gears worn and control of facilities/material must be acceptable to the standard and hygiene requirements. 2.7 Personnel/staff performing at Airside operations area are not to chew buai, or be in position, to share or distribute among others in the workplace. If found of such act will be penalized accordingly. 2.8 All personnel/staff performing at Airside Operation area are prohibited to Smoking at any one time within the perimeter of the operation area or during active duty. Remember: Smoke Kills. 2.9 No alcoholic drinks or any drugs, legal or illegal that is likely to impair performance or judgment. Personnel/staff will be penalized, if found under the influence of the restricted drugs and alcoholic. 2.10 Immediately report to a supervisor, and take proper rest, if you are under the influence of the prohibited Substance 2.11 All airside working environment including workplace and tarmac operation area must be hygienic and neat at all times.
  • 3. PX Airside Health and Safety Procedure Air Niugini Engineering | Airside Occupational Health and safety procedure 3 Compiled by Andrew Louis Ref: PX ASM RHO, IATA Ramp Service, UK CAA – Airside Safety Management IATA affiliate – FSF ROSP & FAA LOSA Program 2.12 During walkaround, servicing and maintenance activity ensure all FOD are considered and remove to make the working parameter clean and safe. 3 Protective Clothing and Equipment 3.1 All personnel/staff performing at Airside must wear full safety gears such as; a. Footwear, b. Gloves, c. Knee pads (if required) d. High-visibility clothing(vest), e. Toilet-servicing protective Suits f. Wet and winter weather jacket. (Rain Coat), g. Sun hats and sunglasses. h. Earmuffs and Ear plugs 3.2 High-visibility clothing or vest should be mandatory on the airside operation area. Clothing styles should fit comfortably to prevent becoming snagged. 3.3 All personnel/staff operating and handling equipment must be well trained, qualified, as well as physically and mentally be healthy and fit proper person to engage in airside activity. 3.4 All personnel/staff performing at airside must be aware of fire protection technique and preventive procedure. 3.5 It is compulsory; they have basic knowledge of the use of fire extinguisher and its emergency evacuation procedure in the event of fire or any event relating to fire. 3.6 It is mandatory; all personnel/staff operating at airside operation area must be trained on the operation and practice of ground and cabin fire evacuation procedure. 3.7 All personnel/staff performing at airside operation area, as equipment/vehicle operator must always drive within speed limit recommended by the Airport Authority. (Speed Limit: 10 KPH) 3.8 Gloves or other protective measures must be taken before Handling Dangerous Goods. If contracted with infectious substance, report immediately to the supervisor, seek medical attention ASAP. 3.9 During severe weather condition i.e. heavy downpour, thunderstorm & deluge stop aircraft servicing immediately. Do not run to reach shelter as wet environment and tarmac can cause harm or danger. 3.10 During higher wind and lightening thunder storms, all personnel/staff performing at airside operation area should not, a. Stay out in the open area, b. Take shelter under an aircraft, c. Load and unload explosive or flammable material.
  • 4. PX Airside Health and Safety Procedure Air Niugini Engineering | Airside Occupational Health and safety procedure 4 Compiled by Andrew Louis Ref: PX ASM RHO, IATA Ramp Service, UK CAA – Airside Safety Management IATA affiliate – FSF ROSP & FAA LOSA Program 4 Manual Handling and Lifting 4.1 Back injuries including other health problems are common for airside personnel/staff. Risk or causes may include the following; a) Improper lifting techniques, b) Poor work attitude, c) Lack of fitness towards work, d) Fatigue and stress, e) Not stretching before lifting f) Lifting excessive loads. 4.2 Follow these guidelines for manual handling and lifting is a supportive tool for safe practices: • Test the object’s weight before lifting; get help if it is too heavy. • Place your feet in a comfortable, balanced position before lifting. • Bend your knees and, if possible, hold the load with both hands. • Keep your back straight. Lift the load gradually by straightening your legs. • Let your thighs, not your lower back, do the work. Keep your arms and elbows close to your body. • Do not twist your body to change direction. • Carry the load close to your body, and watch where you are going. • Use the same techniques in reverse when lowering the load. This guideline is an aid to personnel/staff as to avoid personnel injuries during manual (handling & lifting) servicing. 4.3 Many airlines have introduced maximum weight limits for checked passenger baggage. All personnel/staff performing at airside operation area are to comply with the weight limit during lifting or handling. 4.4 The limits vary from airline to airline, and some carriers have different weight limits depending on the class of travel. If excessive weight is advised, use recommended lifting procedure or 1-2 personnel/staff must be involved in the lifting process. 4.5 Current recommended limits include 20 kilograms (44 pounds), 23 kilograms (51 pounds) and 32 kilograms (70 pounds). On behave of PX, this recommended limits are subject to change as per operations procedure & requirements.
  • 5. PX Airside Health and Safety Procedure Air Niugini Engineering | Airside Occupational Health and safety procedure 5 Compiled by Andrew Louis Ref: PX ASM RHO, IATA Ramp Service, UK CAA – Airside Safety Management IATA affiliate – FSF ROSP & FAA LOSA Program 4.6 Some airlines will accept heavier bags if the passenger pays an excess-baggage charge. . Therefore, however if excessive weight is advised, use recommended lifting procedure and technique. (i.e. application of mobile lifting Equipment) 4.8 Some items of baggage and cargo will exceed the given limits; consideration should be given to the use of motorized lifting equipment. 4.9 If baggage excessive load is not possible to be lifted, two-person lifting is essential. 4.10 During shift change over, all personnel/staff on the departing shift are not to execute duty in any way unless upon approval. 4.11 Proper rest is compulsory, if any signs of sickness, stress and fatigue, report immediately to the supervisor and take proper rest for further attention.