• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
Presentation bank danamon
 

Presentation bank danamon

on

  • 734 views

Efficiency using green technology on Danamaon Bank, Jakarta, Indonesia

Efficiency using green technology on Danamaon Bank, Jakarta, Indonesia

Statistics

Views

Total Views
734
Views on SlideShare
734
Embed Views
0

Actions

Likes
0
Downloads
1
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Presentation bank danamon Presentation bank danamon Presentation Transcript

    • AnalisaCost-Benefit
    • Customer
      Bandara Sepinggan, Balikpapan
      PT. Caltex, Riau
      Panasonic Batrey, Batam
      VICO Indonesia, Balikpapan
      Oberoy Hotel, Lombok
      Universitas Negeri Padang
      Balai Besar Bahan Dan Barang Teknik ( B4 T ), Bandung
      Badan Sertifikasi dan Standarisasi ( BARISTAN ), Surabaya
      Universitas Pembangunan Nasional, Jakarta
      Universitas Indonesia, Jakarta
    • Customer
      Politeknik Bandung
      Gedung Sucofindo Pusat, Jakarta
      Cilegon Mall, Banten
      PT. Sumiden ( Steel Factory ), Cimanggis Depok
      PT. SKF ( Bering Factory ), Jakarta
      RS. Siloam, Jakarta
      Ice Factory, Balikpapan
      Airport Selaparang, Mataram
      Bandara Juanda, Surabaya
      YPI Pesantren Al Zaytun, Indramayu
      LIPI, Bandung
      PT. Vastek Prima, Bandung
      PT. Grand Textile Industry, Bandung
      PT. Himalaya Tunas Texindo, Bandung
      PT. Kelian Equatorial Mining ( KEM ), Kalimatan Timur
      PT. Al Ma’Soem, Bandung dll.
    • Trainning
      PT. KEM Kalimantan Timur
      PT. Vico Kalimantan Timur
      PT. Pertamina Persero Balikpapan dan Balongan
      PT. Puteraco Inti Buana, Surabaya
      PT. Caltex Pacific Indonesia, Riau
      PT. Pupuk Sriwijaya, Palembang
      Balai Latihan kerja, Bandung
      BLK Singosari, Malang
      BLK Condet, Jakarta
      BLK Balikpapan
      Politeknik Bandung
      LEMBANGTEK, Bandung
      Universitas Indonesia, Jakarta
    • PenangananMasalah
      PT. Greenstar Artek Indonesia sampai saat ini tidak pernah mendapat komplain dari para pelanggan atas penggunaan refrigeran hidrokarbon “ARTEK”.
      Atau dengan katalain refrigeran hidrokarbon “ARTEK” tidak ada masalah pada sistem pendingin yang sudah terpasang
    • Garansi / Jaminan
      Garansi / Jaminan yang dapat diberikan oleh PT. Greenstar Artek Indonesia atas pengaplikasian refrigeran hidorkarbon “ARTEK” adalah
      Saving Energy Minimal 15 %
      Maintenance Aplikasi refrigeran hidrokarbon “ARTEK” selama 3 bulan setelah retrofit dilakukan.
    • Cab. Permatahijau
      Power consumption/ month ( kWh)
      3.834
      3.137
      697
      961.274
      5.290.230
      4.328.957
      Saving Bill / month
      6.150.000
      Retrofitting cost
      6,40
      ROI ( month )
    • Pemakaian AC Listrik
      PermataHijau I
      Tanpa Hydrocarbon
      3.291.780
      Dengan Hydrocarbon
      2.822.580
    • Pemakaian AC Listrik
      PermataHijau II
      Tanpa Hydrocarbon
      2.633.040
      Dengan Hydrocarbon
      2.140.380
    • Total PenghematanPermataHijau
      Permata Hijau I
      Permata Hijau II
      Total Penghematan
      483.276
      507.440
      990.716
      Biaya Retrofit 6.150.000
      BEP ( Month ) 6,2
    • Cab. Kelapagading
      Power consumption/ month ( kWh)
      14.960
      12.038
      2.922
      4.032.188
      20.644.800
      16.612.613
      Saving Bill / month
      25.950.000
      Retrofitting cost
      6,44
      ROI ( month )
    • Pemakaian AC Listrik
      KelapaGading
      Tanpa Hydrocarbon
      22.424.880
      Dengan Hydrocarbon
      18.392.693
    • Total Penghematankelapagading
      KelapaGading
      Total Penghematan
      4.153.153
      4.153.153
      Biaya Retrofit 25.950.000
      BEP ( Month ) 6,2
    • Cab. kalibata
      Power consumption/ month ( kWh)
      3.880
      3.151
      729
      1.006.434
      5.354.745
      4.348.311
      Saving Bill / month
      6.300.000
      Retrofitting cost
      6,26
      ROI ( month )
    • Pemakaian AC Listrik
      Kalibata
      Tanpa Hydrocarbon
      8.180.359
      Dengan Hydrocarbon
      7.173.925
    • Total PenghematanKalibata
      Kalibata
      Total Penghematan
      1.036.627
      1.036.627
      Biaya Retrofit 6.300.000
      BEP ( Month ) 6,1
    • Cab. cinere
      Power consumption/ month ( kWh)
      2.010
      1.632
      379
      522.572
      2.774.145
      2.251.574
      Saving Bill / month
      3.300.000
      Retrofitting cost
      6,31
      ROI ( month )
    • Pemakaian AC Listrik
      Cinere
      Tanpa Hydrocarbon
      5.113.860
      Dengan Hydrocarbon
      4.590.840
    • Total Penghematancinere
      Cinere  
      Total Penghematan
      538.711
      538.711
      Biaya Retrofit 3.300.000
      BEP ( Month ) 6,1