Saving on Danamon Bank on AC electricity with our technology

Saving on Danamon Bank on AC electricity with our technology

Published in: Real Estate

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
588
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
7
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. AnalisaCost-Benefit
  • 2. Customer
    Bandara Sepinggan, Balikpapan
    PT. Caltex, Riau
    Panasonic Batrey, Batam
    VICO Indonesia, Balikpapan
    Oberoy Hotel, Lombok
    Universitas Negeri Padang
    Balai Besar Bahan Dan Barang Teknik ( B4 T ), Bandung
    Badan Sertifikasi dan Standarisasi ( BARISTAN ), Surabaya
    Universitas Pembangunan Nasional, Jakarta
    Universitas Indonesia, Jakarta
  • 3. Customer
    Politeknik Bandung
    Gedung Sucofindo Pusat, Jakarta
    Cilegon Mall, Banten
    PT. Sumiden ( Steel Factory ), Cimanggis Depok
    PT. SKF ( Bering Factory ), Jakarta
    RS. Siloam, Jakarta
    Ice Factory, Balikpapan
    Airport Selaparang, Mataram
    Bandara Juanda, Surabaya
    YPI Pesantren Al Zaytun, Indramayu
    LIPI, Bandung
    PT. Vastek Prima, Bandung
    PT. Grand Textile Industry, Bandung
    PT. Himalaya Tunas Texindo, Bandung
    PT. Kelian Equatorial Mining ( KEM ), Kalimatan Timur
    PT. Al Ma’Soem, Bandung dll.
  • 4. Trainning
    PT. KEM Kalimantan Timur
    PT. Vico Kalimantan Timur
    PT. Pertamina Persero Balikpapan dan Balongan
    PT. Puteraco Inti Buana, Surabaya
    PT. Caltex Pacific Indonesia, Riau
    PT. Pupuk Sriwijaya, Palembang
    Balai Latihan kerja, Bandung
    BLK Singosari, Malang
    BLK Condet, Jakarta
    BLK Balikpapan
    Politeknik Bandung
    LEMBANGTEK, Bandung
    Universitas Indonesia, Jakarta
  • 5. PenangananMasalah
    PT. Greenstar Artek Indonesia sampai saat ini tidak pernah mendapat komplain dari para pelanggan atas penggunaan refrigeran hidrokarbon “ARTEK”.
    Atau dengan katalain refrigeran hidrokarbon “ARTEK” tidak ada masalah pada sistem pendingin yang sudah terpasang
  • 6. Garansi / Jaminan
    Garansi / Jaminan yang dapat diberikan oleh PT. Greenstar Artek Indonesia atas pengaplikasian refrigeran hidorkarbon “ARTEK” adalah
    Saving Energy Minimal 15 %
    Maintenance Aplikasi refrigeran hidrokarbon “ARTEK” selama 3 bulan setelah retrofit dilakukan.
  • 7. Cab. Permatahijau
    Power consumption/ month ( kWh)
    3.834
    3.137
    697
    961.274
    5.290.230
    4.328.957
    Saving Bill / month
    6.150.000
    Retrofitting cost
    6,40
    ROI ( month )
  • 8. Pemakaian AC Listrik
    PermataHijau I
    Tanpa Hydrocarbon
    3.291.780
    Dengan Hydrocarbon
    2.822.580
  • 9. Pemakaian AC Listrik
    PermataHijau II
    Tanpa Hydrocarbon
    2.633.040
    Dengan Hydrocarbon
    2.140.380
  • 10. Total PenghematanPermataHijau
    Permata Hijau I
    Permata Hijau II
    Total Penghematan
    483.276
    507.440
    990.716
    Biaya Retrofit 6.150.000
    BEP ( Month ) 6,2
  • 11. Cab. Kelapagading
    Power consumption/ month ( kWh)
    14.960
    12.038
    2.922
    4.032.188
    20.644.800
    16.612.613
    Saving Bill / month
    25.950.000
    Retrofitting cost
    6,44
    ROI ( month )
  • 12. Pemakaian AC Listrik
    KelapaGading
    Tanpa Hydrocarbon
    22.424.880
    Dengan Hydrocarbon
    18.392.693
  • 13. Total Penghematankelapagading
    KelapaGading
    Total Penghematan
    4.153.153
    4.153.153
    Biaya Retrofit 25.950.000
    BEP ( Month ) 6,2
  • 14. Cab. kalibata
    Power consumption/ month ( kWh)
    3.880
    3.151
    729
    1.006.434
    5.354.745
    4.348.311
    Saving Bill / month
    6.300.000
    Retrofitting cost
    6,26
    ROI ( month )
  • 15. Pemakaian AC Listrik
    Kalibata
    Tanpa Hydrocarbon
    8.180.359
    Dengan Hydrocarbon
    7.173.925
  • 16. Total PenghematanKalibata
    Kalibata
    Total Penghematan
    1.036.627
    1.036.627
    Biaya Retrofit 6.300.000
    BEP ( Month ) 6,1
  • 17. Cab. cinere
    Power consumption/ month ( kWh)
    2.010
    1.632
    379
    522.572
    2.774.145
    2.251.574
    Saving Bill / month
    3.300.000
    Retrofitting cost
    6,31
    ROI ( month )
  • 18. Pemakaian AC Listrik
    Cinere
    Tanpa Hydrocarbon
    5.113.860
    Dengan Hydrocarbon
    4.590.840
  • 19. Total Penghematancinere
    Cinere  
    Total Penghematan
    538.711
    538.711
    Biaya Retrofit 3.300.000
    BEP ( Month ) 6,1

×