Anders Loof - Management
Upcoming SlideShare
Loading in...5
×

Like this? Share it with your network

Share

Anders Loof - Management

  • 474 views
Uploaded on

Projects

Projects

  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
474
On Slideshare
474
From Embeds
0
Number of Embeds
0

Actions

Shares
Downloads
0
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. Project ManagementCoordination & LiaisonConstruction ManagementDesign (New, Seismic, Preliminary)Proposals and TenderConcepts and IdeasL. Anders LoofC.Eng. MICE (UK)P.E. (California, USA)Chartered Architect RIBA (UK)loof_intl@hotmail.com
  • 2. Coordination – LiaisonICE Design – Client – D&B Construction 16.5 km Sea Viaducts Precast Segmental Cable Stayed Bridge Second Penang Bridge, MalaysiaProject Management – DPM, ICE (Design) during construction
  • 3. Second Penang Bridge, MalaysiaProject Management – DPM, ICE (Design) during construction
  • 4. 1018m Main Span CSB 224 Stay Cables Longest over 540m Stonecutters Bridge, Hong KongConstruction Management – RCTO for Stay Cable Installation
  • 5. Stonecutters Bridge, Hong KongConstruction Management – RCTO for Stay Cable Installation
  • 6. Managed as “win-win; - to quality - on programme - few claims.16.5 km Sea ViaductsPrecast SegmentalCable Stayed Bridgekm Sea Crossing 1.7 ILM 8x 70m Spans 170+400+170m CSB 130+150+130m Steel Box Girders Machang Bridge, South KoreaConstruction Management – Responsible All of CSB
  • 7. 16.5 km Sea ViaductsPrecast SegmentalCable Stayed Bridge Machang Bridge, South KoreaConstruction Management – Responsible All of CSB
  • 8. “It is a very difficult project, possibly the most difficult in all of China. Some people doubted that we would ever be able to build it.” – Xu Deyu of client, NCE 2005.06.16 > 120 Bridges in Construction along 117 km Expressway, RMB 6.7bn Tot, 24% ADB 17 Drill & Blast Tunnels into Carst Layered Rock, one > 2km 2x Balanced Cantilver Turned After Construct Chong Zun Expressway, ChinaConstruction Management / Bridge Expert Audits
  • 9. Chong Zun Expressway, ChinaConstruction Management / Bridge Expert Audits
  • 10. Chong Zun Expressway, ChinaConstruction Management / Bridge Expert Audits
  • 11. 1km Bridge Cable Stayed = 125+250+125m Aswan Bridge, EgyptConstruction Management / Resident Engineer CSB
  • 12. Aswan Bridge, EgyptConstruction Management / Resident Engineer CSB