×
  • Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
 

11.bicriteria in n x 0002www.iiste.org call for paper flow shop scheduling problem under specified rental policy, processing time, setup time each associated with probabilities including job block criteria

by Editor in chief at International Institute for Science, Technology and Education on May 13, 2012

  • 182 views

IISTE-call for paper www.iiste.org/Journals

IISTE-call for paper www.iiste.org/Journals

Statistics

Views

Total Views
182
Views on SlideShare
182
Embed Views
0

Actions

Likes
0
Downloads
0
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via SlideShare as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
Post Comment
Edit your comment

11.bicriteria in n x 0002www.iiste.org call for paper flow shop scheduling problem under specified rental policy, processing time, setup time each associated with probabilities including job block criteria 11.bicriteria in n x 0002www.iiste.org call for paper flow shop scheduling problem under specified rental policy, processing time, setup time each associated with probabilities including job block criteria Document Transcript