Your SlideShare is downloading. ×
0
STUDIO NAVALE General Presentation, April 2013
STUDIO NAVALE General Presentation, April 2013
STUDIO NAVALE General Presentation, April 2013
STUDIO NAVALE General Presentation, April 2013
STUDIO NAVALE General Presentation, April 2013
STUDIO NAVALE General Presentation, April 2013
STUDIO NAVALE General Presentation, April 2013
STUDIO NAVALE General Presentation, April 2013
STUDIO NAVALE General Presentation, April 2013
STUDIO NAVALE General Presentation, April 2013
STUDIO NAVALE General Presentation, April 2013
STUDIO NAVALE General Presentation, April 2013
STUDIO NAVALE General Presentation, April 2013
STUDIO NAVALE General Presentation, April 2013
STUDIO NAVALE General Presentation, April 2013
STUDIO NAVALE General Presentation, April 2013
STUDIO NAVALE General Presentation, April 2013
STUDIO NAVALE General Presentation, April 2013
STUDIO NAVALE General Presentation, April 2013
STUDIO NAVALE General Presentation, April 2013
STUDIO NAVALE General Presentation, April 2013
STUDIO NAVALE General Presentation, April 2013
STUDIO NAVALE General Presentation, April 2013
STUDIO NAVALE General Presentation, April 2013
STUDIO NAVALE General Presentation, April 2013
STUDIO NAVALE General Presentation, April 2013
STUDIO NAVALE General Presentation, April 2013
STUDIO NAVALE General Presentation, April 2013
STUDIO NAVALE General Presentation, April 2013
STUDIO NAVALE General Presentation, April 2013
STUDIO NAVALE General Presentation, April 2013
STUDIO NAVALE General Presentation, April 2013
STUDIO NAVALE General Presentation, April 2013
STUDIO NAVALE General Presentation, April 2013
STUDIO NAVALE General Presentation, April 2013
STUDIO NAVALE General Presentation, April 2013
STUDIO NAVALE General Presentation, April 2013
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

STUDIO NAVALE General Presentation, April 2013

300

Published on

A brief description of the capabilities of Studio Navale and its personnel. Studio Navale Maritime and Technical Ltd. is a leading technical a consulting firm, located in Piraeus, since 1987.

A brief description of the capabilities of Studio Navale and its personnel. Studio Navale Maritime and Technical Ltd. is a leading technical a consulting firm, located in Piraeus, since 1987.

Published in: Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
300
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. ConstantlyonthealertfornewdevelopmentsintheMarinesectorApril 2013www.studionavale.grThe reliable Greek partner in ship design and constructionA brief introduction to STUDIO NAVALE
  • 2. ConstantlyonthealertfornewdevelopmentsintheMarinesectorApril 2013www.studionavale.grAgenda History Capabilities Recent Activities Why Studio Navale?
  • 3. ConstantlyonthealertfornewdevelopmentsintheMarinesectorApril 2013www.studionavale.grAgenda History Capabilities Recent Activities Why Studio Navale?
  • 4. ConstantlyonthealertfornewdevelopmentsintheMarinesectorApril 2013www.studionavale.grHistory of Studio Navale 1987 onwards19871993Milestone forthe EnhancedSurveys ofBulkers andTankerslaunchingdemandingUTMAlex Kouros established andoperated Studio Navale2000Alex Kouros joined ABS Consulting20052003The first conversionof a Panamax singlehull Tanker into adouble hull has beencontracted andturned to project,showing the way inthe market; until2005, more than 15conversions carriedoutManagement of ashipping company anda ship repairs yard2008Idle condition of Studio NavaleRe-establishmentof StudioNavale at thenew premisesOperation for 13 years from thePiraeus Office5 years hi-end consulting
  • 5. ConstantlyonthealertfornewdevelopmentsintheMarinesectorApril 2013www.studionavale.grMilestones of Studio Navale 1987• STUDIO NAVALE is established in Piraeus by the Naval Architect and Marine Engineer Alex Kouros. 1989• Finite Elements Methodology for the structural form of the cargo holds of a Cement Barge and the decks ofa Livestock Carrier. 1990• Complete preparation and issuance of drawings and studies in electronic formats. 1993• Pioneers in the preparation of the Enhanced Surveys’ Reports for the requirements of ClassificationSocieties.• Pioneers in the certifications as Class Subcontractors (NDTs). 2000• Feasibility studies for the conversion of single hull tankers into double hull ships. 2003• Participation in the first world wide Risk Management Certification on behalf of a Tank Ships Company. 2005• The renewal of rudder horn and rudder blade, along with all steering mechanism and reconstruction of theaft part of a Panamax Bulker is achieved within specified time. 2011• STUDIO NAVALE is established in the new premises at the Industrial Park of Schisto (VIPAS). 2012• STUDIO NAVALE is certified against the ISO 9001:2008 Standard by LRQA, a Lloyd’s Register branch.
  • 6. ConstantlyonthealertfornewdevelopmentsintheMarinesectorApril 2013www.studionavale.grLocation of STUDIO NAVALESTUDIO NAVALE islocated in the VIPASPARK (Industrial Park) atSchisto, Perama.The building in whichSTUDIO NAVALE deploysits world wide projectsis basis of TURBOMED.TURBOMED specializesin the field of turbinesand turbocharges.
  • 7. ConstantlyonthealertfornewdevelopmentsintheMarinesectorApril 2013www.studionavale.grFast Facts about Studio Navale A technical and consulting office focused on the servicesof demanding projects and/or projects requiring eminentexpertise and skills. More than 30 years experience in ship repairs, underdemanding conditions. High reputation and respect within the shipping industry. Fully organized with highly skilled technical personnel. Strives to continuously update equipment andinstruments. Availability 24/7. Management Team acts as the frontline at-site. Management Team with technical and commercialexpertise and experience.
  • 8. ConstantlyonthealertfornewdevelopmentsintheMarinesectorApril 2013www.studionavale.grVision and Mission of Studio Navale Vision:• To be a partner in the Technical Department of Shipping Companiesor of a Shipping and Offshore interest Entity, at short notice, in orderto offer the best technical advice and consulting services to ourclients. Mission:• To share the accumulated technical knowledge with existing and newClients by strengthening and improving existing business ties and bycreating and growing new business relationships in order to helpClients meet the continuously altered challenges of the shippingindustry;• To deploy the firm’s considerable resources and deliver services ofthe highest quality and safety standards.
  • 9. ConstantlyonthealertfornewdevelopmentsintheMarinesectorApril 2013www.studionavale.grStudio Navale decision tobecome ISO 9001:2008certified by Lloyds Registeris a proactive one that notonly anticipates thedemands of our clients, butalso demonstrates ourcommitment to providingquality services to all ourclients.Certification against ISO 9001:2008
  • 10. ConstantlyonthealertfornewdevelopmentsintheMarinesectorApril 2013www.studionavale.grAgenda History Capabilities Recent Activities Why Studio Navale?
  • 11. ConstantlyonthealertfornewdevelopmentsintheMarinesectorApril 2013www.studionavale.grRange of ServicesShips’ TechnicalDocumentationShip DesignPlan ApprovalDesign ReviewEngineering ConsultancyConversions, Modificationsand RetrofitsDesign AssistanceAdvance EngineeringAnalysis (FEM)3D Scanning of giganticstructuresCoating and CorrosionRisk and ReliabilityCondition SurveysEvaluation of ships andfloating structuresShip Management ServicesShip Repairs ManagementClaimsDefenseCapabilities Studio Navale is a technical office, with thescope of offering ship design, manufacturing,repairs, management services of utmostquality to the benefit of the Client. Up-to-date software and equipment torespond to third parties requirements. Full implementation of Finite Elementssoftware for evaluating structures. 3D Scanning of structures to producerelevant detailed drawings and studies. Condition and Evaluation Surveys. Management of ship repairs.
  • 12. ConstantlyonthealertfornewdevelopmentsintheMarinesectorApril 2013www.studionavale.grConsulting Capabilities Technical Services Design Review andCertification Technical SupportServices AdvancedEngineering Analysis Marine and OffshoreCertification Plant and PipelineCertification New ConstructionTechnical Support EnvironmentalManagement andAssessments Specialty Services Asset Management Project Financial Project AppraisalService Project Management Technical Training Facility Verification Boiler and PressureVessel Certification Plant and PipelineCommissioning Site and SourceInspection New ConstructionProject Support Surveys andCondition Assessment Marine and OffshoreCertification Cargo Container andCrane Certification
  • 13. ConstantlyonthealertfornewdevelopmentsintheMarinesectorApril 2013www.studionavale.grAgenda History Capabilities Recent Activities Why Studio Navale?
  • 14. ConstantlyonthealertfornewdevelopmentsintheMarinesectorApril 2013www.studionavale.grActivities on Double Hull Conversions Studio Navale is one of thepioneers in double hullproposals, feasibilitiesstudies and actualmodifications. First modification in 2003(Panamax Tanker). More than 20 conversionsof various levels ofdifficulty and complexity.
  • 15. ConstantlyonthealertfornewdevelopmentsintheMarinesectorApril 2013www.studionavale.grActivities on Finite Elements (FEM) Studio Navale is among thefirsts in utilization ofFinite Elements Methods(FEM) for investigation ofvarious structures’integrity. Utilization of FEM as earlyas 1989 (FESPA software,tailor-made to steelstructures). Cement Barges, LivestockCarrier, Bulkers.
  • 16. ConstantlyonthealertfornewdevelopmentsintheMarinesectorApril 2013www.studionavale.grActivities on 3D Scanning 3D scanning is achieved by non-contact technique, with a high-end 3D Scanner, for creation ofaccurate digital models of thesurfaces. Accurate and “As Fitted” hullmodelling of gigantic structuressurfaces and preparation of HullLines. Evaluation of the draft marksaccuracy. Accurate digital representation ofany internal space (engine room,cargo tank etc.). Digitized parts of damaged areas,based upon a symmetrical one.
  • 17. ConstantlyonthealertfornewdevelopmentsintheMarinesectorApril 2013www.studionavale.grActivities on Stern Lines Installation Design forproduction andcost-effectiveinstallation. Tailor-made designand installation. Accuratemeasurements and3D drawingspreparation forease of pre-fabrication andinstallation, evenwhen the ship isstill in operation
  • 18. ConstantlyonthealertfornewdevelopmentsintheMarinesectorApril 2013www.studionavale.grActivities on Piping Modification Modification of variouspiping systems (upgrade,retrofit). Application of the requirednorms and regulations tothe Clients discretion. Accurate measurementsystem for pre-fabricationof the pipelines aspossible. Delivery of turn-keyprojects.
  • 19. ConstantlyonthealertfornewdevelopmentsintheMarinesectorApril 2013www.studionavale.grActivities on Shaft Alignment Up-to-date and high-endinstrumentation (Easy-Laser E710 AlignmentSystem). Application in newbuildings alignmentverification, existing shipsand pro-active alignmentrelated evaluations. Evaluation of shaftingalignment on small shipsand yachts, in order forvibration to be mitigated. Evaluation of geometricaland shape problemsresulting in averseoutcome.
  • 20. ConstantlyonthealertfornewdevelopmentsintheMarinesectorApril 2013www.studionavale.grActivities on Repairs ManagementReplacement of an anchorand modification of IG SWpipe within ONE day, havingthe ship in INERTEDcondition (CARELL SAProject).Contamination of theballast tanks with fuel oil,due to a cross pipe leakage.Assessment, evaluation ofthe case and permanentrepairs within 7 days(CARELL SA Project).Evaluation of theexisting deep wellpumps in order tohandle viscus liquids.Cooperation with theMakers.Survey of the shipfor a PPCS purposeand evaluation ofthe existingdamage/repairs.
  • 21. ConstantlyonthealertfornewdevelopmentsintheMarinesectorApril 2013www.studionavale.grActivities on Repairs ManagementExtensive repairsspecification of a PolishAHTB (CARELL SA Projectpartially conducted atNEORION Shipyards).Demanding repairsspecification of aSingaporean AHTB(CARELL SA Project).Repairs on a drillingplatform under ademandingspecification andstrict HSEQ issues(NAVEP works atELEFSIS Shipyards).Acquisition of theship on behalf ofOwners and puttingher in trading.Various repairs andClass matters weredealt with.Preparation of theShipping Company.
  • 22. ConstantlyonthealertfornewdevelopmentsintheMarinesectorApril 2013www.studionavale.grActivities on Repairs Management PANAMAX BULKER’S RUDDER DAMAGE The rudder cropped out anddisappeared at the level of therudder stock. The bulker was tugged from AtlanticOcean to Piraeus (42 days) with thetug Fotiy Krylov. New configuration with a Becker typerudder was designed and fabricated. Manoeuvrability of the bulker wasimproved. Work carried out at HellenicShipyards (HSY).
  • 23. ConstantlyonthealertfornewdevelopmentsintheMarinesectorApril 2013www.studionavale.grActivities on Repairs Management CONTAINER VESSEL’S RUDDER HORNFRACTURE REPAIRS The cast rudder horn fractured asdeep as +150mm. Repairs in way of the fractured horn(on a 24-hour basis for 7 dayscontinuously). Upon completion of repair worksverification of the rudder stockalignment.
  • 24. ConstantlyonthealertfornewdevelopmentsintheMarinesectorApril 2013www.studionavale.grActivities on Repairs Management GENERAL CARGO SHIPCOLLISION DAMAGE The Chinese vessel wasdamaged in way of the CO2Room, which was totallydestroyed. The scope of work was the re-design of the CO2 Room, itsinstallations (piping,electrical), rectification of thedamaged hull andaccommodation areas andcommissioning of theinstallations. Work carried out at ElefsisShipyards, being CARELL SA theprimal Contractor.
  • 25. ConstantlyonthealertfornewdevelopmentsintheMarinesectorApril 2013www.studionavale.grActivities on Ships’ Dry Docking Works Repairs Management. Repairs Specificationpreparation. Yards’ evaluation. Attendance of various drydocking operations withnormal or extraordinary scopeof works. Attendance in variousShipyards within Greekterritories or worldwide(Singapore, China, Portugal,Latin America etc.). Representation in the Yard fornegotiations.
  • 26. ConstantlyonthealertfornewdevelopmentsintheMarinesectorApril 2013www.studionavale.grActivities on Ships’ Emergency Works Preparation, arrangementsand execution of allnecessary actions in orderfor an emergency call tobe satisfied. Emergency accommodationof ships. Emergency repairs at dockor with riding teams. Availability of technicalsupport on 24/7 basis. Replacement of anchorsand anchor chains. Bow thrusters and rudderrelated projects.
  • 27. ConstantlyonthealertfornewdevelopmentsintheMarinesectorApril 2013www.studionavale.grActivities on demanding steel works Stranding of a tanker Alignment of the sub-assembly with respect to ship’s lines andsymmetry. Work carried out at HSY by NABEP Ltd.
  • 28. ConstantlyonthealertfornewdevelopmentsintheMarinesectorApril 2013www.studionavale.grActivities on demanding steel works VLCC Tanker stranding Modeling of the side shell in way of the damage (fore portside), in order to fabricate the pre-cut transverse webs. Verification of the symmetry. Renewal of 300TN in 16 days. Work carried out at HSY by NABEP Ltd.
  • 29. ConstantlyonthealertfornewdevelopmentsintheMarinesectorApril 2013www.studionavale.grActivities on demanding steel works Stranding of a bulker Alignment of the sub-assembly with respect toship’s lines and symmetry. Work carried out at HSY byNABEP Ltd.
  • 30. ConstantlyonthealertfornewdevelopmentsintheMarinesectorApril 2013www.studionavale.grTugs Deliveries: MAKAIRA The 55TN Bollard Pull newbuilding tug MAKAIRA (HullH354) was built byanddelivered in September2011. Studio Navale scopeincluded the re-design andimprovement of theexisting tug design, as wellas the regulatory package. In addition, the tug wasdelivered on behalf ofOwners and prepared for adeep-sea voyage fromSingapore to Venezuela(12,500nm).
  • 31. ConstantlyonthealertfornewdevelopmentsintheMarinesectorApril 2013www.studionavale.grTugs Deliveries: MEDREGAL The MEDREGAL, a DamenStan 2608 Tug, which wasbuilt in Argentina atTANDANOR Shipyard,under license, completedin April 2010. Delivered in Cuba andwent straight toVenezuela. Studio Navale wasattending the delivery onbehalf of the new Ownersand prepared the tug forthe voyage. Bollard Pull trial wasconducted.
  • 32. ConstantlyonthealertfornewdevelopmentsintheMarinesectorApril 2013www.studionavale.grTugs Deliveries: RM BARRACUDA & RM MARLIN Studio Navale scope of work includedthe representation of the newOwners, delivery on their behalf andpreparation for a deep-sea voyagefrom Singapore to Venezuela, throughSuez Canal. Studio Navale scope of work included,among others, recommendations onnew automation ensuring security andcomfort of piloting and ease ofoperations. Feasibility studies for conversion toFiFi Class 1.
  • 33. ConstantlyonthealertfornewdevelopmentsintheMarinesectorApril 2013www.studionavale.grTugs Deliveries: SIGMA I & OMEGA I Representation of the new Ownersduring the S&P and delivery of thetugs on their behalf. Scheduling and arrangements ofextensive repairs and dry dockingworks. Preparation for a deep-sea voyagefrom Singapore to Venezuela,through Suez Canal (12,500nm). Technical attendance during thepassage and repairs at scheduledstop overs (Colombo, Suez,Piraeus, Las Palmas, Curacao).
  • 34. ConstantlyonthealertfornewdevelopmentsintheMarinesectorApril 2013www.studionavale.grAgenda History Capabilities Organization Chart 3D Scanning Services Recent Activities Why Studio Navale?
  • 35. ConstantlyonthealertfornewdevelopmentsintheMarinesectorApril 2013www.studionavale.gr One-person contact. Services aiming solely for the Client’s satisfaction. Experience of more than 30 years in the production. Experienced engineers with up-to-date skills. Knowledge of the ship repairs market from the inside. Excellent relationships with Classification Societies. Competitive and cost-effective business relationships. Pool of unique subcontractors, worldwide. Respect of the market. 24/7 service.Why Studio Navale?
  • 36. ConstantlyonthealertfornewdevelopmentsintheMarinesectorApril 2013www.studionavale.grLocation: GREECE!Reliable andfriendlyenvironment.Within mainshippingtrading routes.Competitive cost anduncompromisedQuality.In the front doorto Europe.
  • 37. ConstantlyonthealertfornewdevelopmentsintheMarinesectorApril 2013www.studionavale.grCommitted to the client superior resultsThe reliable Greek partner in ship design and construction

×