SlideShare a Scribd company logo
1 of 4
Download to read offline
Shooting Schedule
Date: Wednesday the 29th January 2014.
Location: Nunnington Hall, Ryedale
Equipment:

Booked? (Y/N)

DSLR Camera

Y

Tripod

Y

Memory Card
Model Release forms

Y
Y

Models: The images will be part of a collection of eight photographs that document
Nunnington Hall. From Workers in the gardens preserving the National park to the
workers in the shops selling local produce from farms nearby. The models used will
be other people taking photographs as it is more of a documentary type of
photography rather than a photojournalist approach.

Props: Props used will only be that of what is found at Nunnington Hall, such as the
tables and chairs found in the interior of the site.

Risk assessment completed? Yes
Contingency: To go into York city centre and take images of the old buildings and
walls. Also as Nunnington halls staff might not be working, a contingency is put in
place to take photographs of any workers in the garden industry. Should the weather
effect the outcome of the photographs then it has been thought about to take the
image indoors. One shoot should be enough to take the documentary images
however if needed a location will be prepared for a second shoot.

Risk Assessment
Name: Alan Smith
Project: Discovery/
Photography
Location: Nunnington Hall
Hazard

Person(s) / Equipment at
Risk

Risk Control Taken

What Health and Safety legislation might you need to consider in this project?
Health and safety at work act 1974. I people and
Tripping over due to weather Could harm am to consider the general duties strap over my when they the
Having the of the students
care because of I will therefore look at students acting responsibly and being safe when around certain
of the tutors.
conditions or
maybe others around.
head supporting the camera
sites or equipment. To also consider the tutors (People in charge of students behaviour) and the way
natural environment at the
Camera falling may result in
and making sure to look
they should act. They should be trained to deal with certain aspects of the trip and to set an example on
site.
the lens being scratched or
around the surroundings.
how to behave in the premises of a National Park. They should also know whether the location of where
even broken.
the students going is safe. Also instruct the students to take photographs without supervision.
Health and Safety (Display Screen Equipment) Regulations act 1992. This may be considered when
editing the images taken on the computer. Regular breaks to be taken to avoid eye problems.

Disturbing people’s Hazardous and healththe photographs
People in (COSHH) regulations (2002). Registration, evaluation,
Making sure nobody is in the
Control of privacy.
taken to chemicals to be
way these camera when
authorisation and restrictionmay not want(REACH) both of of the are used for risk assessment
pictured.
capturing an image. Also ask
people if they mind or not
being taken of.
Touching harmful equipment
(Gardening equipment)

The person who may get
hurt, the person responsible
may be at risk of being
punished and the equipment
may be damaged.

To not touch anything that
has been left by a worker,
also be aware of
surroundings at all times.

Darkroom exposure to
chemical agents.

It may lead to respiratory,
allergic, and nervous system
diseases.

Having breaks every 15
minutes when in dark areas.

SomeoneProvision and Use of Work may lead toRegulations 1998 (PUWER) the tripod
falling over Tripod This Equipment the person
To always keep
tripping over to be harmed
close by and not where
and the tripod to potentially someone can walk near it.
break.
Pedestrians/ people
Getting lost

Ergonomic risk of handling
heavy equipment.

Me be crowded and can fall
on the floor damaging
equipment and others.
Finding yourself lost from
the others and may be
harmed.

To avoid going in areas
where there are a vast
amount of people.
To stay within the grounds at
all times and don’t go too far
a drift from the other
students.

Person at risk of strain or the To make sure regular breaks
camera and tripod may be in are taken to avoid neck pain
danger of falling on the floor. and back pain.
Planned places for photographsImage of a person taking a photograph. (No depth of field)
(Quick shutter speed) (Model release form)
Image of the full building (Wide shot) (Daylight White balance) (Rule of thirds)
Image of worker- Gardener (Portrait- if possible or candid to show him at work) (Model
release form)
Image of giant chess set (Close up, looking up- to make the pieces look bigger)
Image of inside (Tables & Chairs) (Rule of thirds)
Image of organic garden- (Long shot, leading lines)
Image of shop (workers) (Portrait, observational)
Image of canteen (Medium shot)
Image of Pic-nic spots (Depth of field used)
Close ups on buildings design (Texture) (Slow Shutter speed)
Image of exhibition (Use depth of field to capture many pieces in good detail)

Example of model Release form! Models are to sign this in order to take images.
This needs to be printed off and handed out to each model that participates in the
photographs. If the person is of a young age then the parent/guardian must consent to
images being taken.

More Related Content

What's hot

Shooting schedule & risk assessment
Shooting schedule & risk assessmentShooting schedule & risk assessment
Shooting schedule & risk assessmentAlanSmith96
 
Shooting schedule & risk assessment
Shooting schedule & risk assessmentShooting schedule & risk assessment
Shooting schedule & risk assessmentAlanSmith96
 
Shooting schedule & risk assessment
Shooting schedule & risk assessmentShooting schedule & risk assessment
Shooting schedule & risk assessmentAlanSmith96
 
Shooting schedule & risk assessment
Shooting schedule & risk assessmentShooting schedule & risk assessment
Shooting schedule & risk assessmentAlanSmith96
 
Shooting Schedule & Risk Assessment
Shooting Schedule & Risk AssessmentShooting Schedule & Risk Assessment
Shooting Schedule & Risk AssessmentAlanSmith96
 
Shooting schedule & risk assessment
Shooting schedule & risk assessmentShooting schedule & risk assessment
Shooting schedule & risk assessmentAlanSmith96
 
Shooting schedule & risk assessment
Shooting schedule & risk assessmentShooting schedule & risk assessment
Shooting schedule & risk assessmentAlanSmith96
 
Shooting schedule & risk assessment!!
Shooting schedule & risk assessment!!Shooting schedule & risk assessment!!
Shooting schedule & risk assessment!!AlanSmith96
 
Shooting schedule & risk assessment
Shooting schedule & risk assessmentShooting schedule & risk assessment
Shooting schedule & risk assessmentAlanSmith96
 
Recce & photography done
Recce & photography doneRecce & photography done
Recce & photography doneKimberley Kasumba
 

What's hot (14)

Shooting schedule & risk assessment
Shooting schedule & risk assessmentShooting schedule & risk assessment
Shooting schedule & risk assessment
 
Shooting schedule & risk assessment
Shooting schedule & risk assessmentShooting schedule & risk assessment
Shooting schedule & risk assessment
 
Task 5
Task 5Task 5
Task 5
 
Task 5!
Task 5!Task 5!
Task 5!
 
Shooting schedule & risk assessment
Shooting schedule & risk assessmentShooting schedule & risk assessment
Shooting schedule & risk assessment
 
Shooting schedule & risk assessment
Shooting schedule & risk assessmentShooting schedule & risk assessment
Shooting schedule & risk assessment
 
Task 5
Task 5Task 5
Task 5
 
Shooting Schedule & Risk Assessment
Shooting Schedule & Risk AssessmentShooting Schedule & Risk Assessment
Shooting Schedule & Risk Assessment
 
Task 5!
Task 5!Task 5!
Task 5!
 
Shooting schedule & risk assessment
Shooting schedule & risk assessmentShooting schedule & risk assessment
Shooting schedule & risk assessment
 
Shooting schedule & risk assessment
Shooting schedule & risk assessmentShooting schedule & risk assessment
Shooting schedule & risk assessment
 
Shooting schedule & risk assessment!!
Shooting schedule & risk assessment!!Shooting schedule & risk assessment!!
Shooting schedule & risk assessment!!
 
Shooting schedule & risk assessment
Shooting schedule & risk assessmentShooting schedule & risk assessment
Shooting schedule & risk assessment
 
Recce & photography done
Recce & photography doneRecce & photography done
Recce & photography done
 

Viewers also liked (9)

Eugenia noelia
Eugenia noeliaEugenia noelia
Eugenia noelia
 
#1 The Ball Game
#1 The Ball Game#1 The Ball Game
#1 The Ball Game
 
Aa
AaAa
Aa
 
Hora del cuento: San Jordi
Hora del cuento: San JordiHora del cuento: San Jordi
Hora del cuento: San Jordi
 
Hoe te beginnen met sketchnotes
Hoe te beginnen met sketchnotesHoe te beginnen met sketchnotes
Hoe te beginnen met sketchnotes
 
Presentation1
Presentation1Presentation1
Presentation1
 
Julie
JulieJulie
Julie
 
Case Study - Heritage School
Case Study - Heritage SchoolCase Study - Heritage School
Case Study - Heritage School
 
Leyenda De San Jorge
Leyenda De San JorgeLeyenda De San Jorge
Leyenda De San Jorge
 

Similar to Shooting schedule & risk assessment

Shooting Schedule & Risk Assessment
Shooting Schedule & Risk AssessmentShooting Schedule & Risk Assessment
Shooting Schedule & Risk AssessmentAlanSmith96
 
Shooting Schedule & risk assessment
Shooting Schedule & risk assessmentShooting Schedule & risk assessment
Shooting Schedule & risk assessmentAlanSmith96
 
Photography risk assessment portrait
Photography risk assessment portraitPhotography risk assessment portrait
Photography risk assessment portraitLewisDunn
 
5.%2520 pre production
5.%2520 pre production5.%2520 pre production
5.%2520 pre productionLukeHeadland2
 
Photography shoot risk assessment form portrait inside
Photography shoot risk assessment form portrait insidePhotography shoot risk assessment form portrait inside
Photography shoot risk assessment form portrait insideMegan Hughes
 
Risk assessment lo2
Risk assessment lo2Risk assessment lo2
Risk assessment lo2jp05064325
 
Location recces
Location reccesLocation recces
Location recces960940
 
Portrait Photography Shoot Risk Assessment Form
Portrait Photography Shoot Risk Assessment FormPortrait Photography Shoot Risk Assessment Form
Portrait Photography Shoot Risk Assessment Formryansharman
 
Risk assessment
Risk assessmentRisk assessment
Risk assessmentOliviaBolt
 
Risk assessment
Risk assessmentRisk assessment
Risk assessmentOliviaBolt
 

Similar to Shooting schedule & risk assessment (17)

Shooting Schedule & Risk Assessment
Shooting Schedule & Risk AssessmentShooting Schedule & Risk Assessment
Shooting Schedule & Risk Assessment
 
Shooting Schedule & risk assessment
Shooting Schedule & risk assessmentShooting Schedule & risk assessment
Shooting Schedule & risk assessment
 
Photography risk assessment portrait
Photography risk assessment portraitPhotography risk assessment portrait
Photography risk assessment portrait
 
5.%2520 pre production
5.%2520 pre production5.%2520 pre production
5.%2520 pre production
 
Location rose
Location roseLocation rose
Location rose
 
Photography shoot risk assessment form portrait inside
Photography shoot risk assessment form portrait insidePhotography shoot risk assessment form portrait inside
Photography shoot risk assessment form portrait inside
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment lo2
Risk assessment lo2Risk assessment lo2
Risk assessment lo2
 
Location recces
Location reccesLocation recces
Location recces
 
Recce questions
Recce questionsRecce questions
Recce questions
 
Portrait Photography Shoot Risk Assessment Form
Portrait Photography Shoot Risk Assessment FormPortrait Photography Shoot Risk Assessment Form
Portrait Photography Shoot Risk Assessment Form
 
Risk assessment form
Risk assessment formRisk assessment form
Risk assessment form
 
Risk assesment
Risk assesmentRisk assesment
Risk assesment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment form
Risk assessment formRisk assessment form
Risk assessment form
 
Risk assessment form
Risk assessment formRisk assessment form
Risk assessment form
 

More from AlanSmith96

Graphic narrative resubmission!
Graphic narrative resubmission!Graphic narrative resubmission!
Graphic narrative resubmission!AlanSmith96
 
Graphic narrative resubmission!
Graphic narrative resubmission!Graphic narrative resubmission!
Graphic narrative resubmission!AlanSmith96
 
Writing copy resubmission!
Writing copy resubmission!Writing copy resubmission!
Writing copy resubmission!AlanSmith96
 
Writing copy resubmission!
Writing copy resubmission!Writing copy resubmission!
Writing copy resubmission!AlanSmith96
 
Writing copy resubmission
Writing copy resubmissionWriting copy resubmission
Writing copy resubmissionAlanSmith96
 
Social action resubmission !
Social action resubmission !Social action resubmission !
Social action resubmission !AlanSmith96
 
Design for advertising!
Design for advertising!Design for advertising!
Design for advertising!AlanSmith96
 
Design For Advertising (Task 3+)
Design For Advertising (Task 3+)Design For Advertising (Task 3+)
Design For Advertising (Task 3+)AlanSmith96
 
Design For Advertising Resubmission!
Design For Advertising Resubmission! Design For Advertising Resubmission!
Design For Advertising Resubmission! AlanSmith96
 
Task 9! Evaluation
Task 9! Evaluation Task 9! Evaluation
Task 9! Evaluation AlanSmith96
 

More from AlanSmith96 (20)

Graphic narrative resubmission!
Graphic narrative resubmission!Graphic narrative resubmission!
Graphic narrative resubmission!
 
Graphic narrative resubmission!
Graphic narrative resubmission!Graphic narrative resubmission!
Graphic narrative resubmission!
 
Writing copy resubmission!
Writing copy resubmission!Writing copy resubmission!
Writing copy resubmission!
 
Writing copy resubmission!
Writing copy resubmission!Writing copy resubmission!
Writing copy resubmission!
 
Writing copy resubmission
Writing copy resubmissionWriting copy resubmission
Writing copy resubmission
 
Task 4!
Task 4!Task 4!
Task 4!
 
Task 4
Task 4Task 4
Task 4
 
Task 4
Task 4Task 4
Task 4
 
Task 4!
Task 4!Task 4!
Task 4!
 
Task 10!!
Task 10!!Task 10!!
Task 10!!
 
Social Action
Social ActionSocial Action
Social Action
 
Social action resubmission !
Social action resubmission !Social action resubmission !
Social action resubmission !
 
Task 10!!
Task 10!!Task 10!!
Task 10!!
 
Design for advertising!
Design for advertising!Design for advertising!
Design for advertising!
 
Design For Advertising (Task 3+)
Design For Advertising (Task 3+)Design For Advertising (Task 3+)
Design For Advertising (Task 3+)
 
Task 6
Task 6Task 6
Task 6
 
Task 5
Task 5Task 5
Task 5
 
Task 4
Task 4Task 4
Task 4
 
Design For Advertising Resubmission!
Design For Advertising Resubmission! Design For Advertising Resubmission!
Design For Advertising Resubmission!
 
Task 9! Evaluation
Task 9! Evaluation Task 9! Evaluation
Task 9! Evaluation
 

Recently uploaded

Cat & Art98 A collection of cat paintings
Cat & Art98 A collection of cat paintingsCat & Art98 A collection of cat paintings
Cat & Art98 A collection of cat paintingssandamichaela *
 
layered-cardboard-sculptures-miika-nyyssonen.pdf
layered-cardboard-sculptures-miika-nyyssonen.pdflayered-cardboard-sculptures-miika-nyyssonen.pdf
layered-cardboard-sculptures-miika-nyyssonen.pdfbaroquemodernist
 
Olympia Cafe, Restaurants-cafes, Albuquerque, NM
Olympia Cafe, Restaurants-cafes, Albuquerque, NMOlympia Cafe, Restaurants-cafes, Albuquerque, NM
Olympia Cafe, Restaurants-cafes, Albuquerque, NMroute66connected
 
Cat & Art99 A collection of cat paintings
Cat & Art99 A collection of cat paintingsCat & Art99 A collection of cat paintings
Cat & Art99 A collection of cat paintingssandamichaela *
 
Roadrunner Motel, Motel/Residence. Tucumcari, NM
Roadrunner Motel, Motel/Residence. Tucumcari, NMRoadrunner Motel, Motel/Residence. Tucumcari, NM
Roadrunner Motel, Motel/Residence. Tucumcari, NMroute66connected
 
asteroid mining presentation for earth and space science
asteroid mining presentation for earth and space scienceasteroid mining presentation for earth and space science
asteroid mining presentation for earth and space sciencetshmvm547v
 
IT TOWER DESIGN CHANDAKA BHUBANESWAR ODISHA
IT TOWER DESIGN CHANDAKA BHUBANESWAR ODISHAIT TOWER DESIGN CHANDAKA BHUBANESWAR ODISHA
IT TOWER DESIGN CHANDAKA BHUBANESWAR ODISHAalwayslogo
 
Bai tap thuc hanh Anh 6 Mai Lan Huong.docx
Bai tap thuc hanh Anh 6 Mai Lan Huong.docxBai tap thuc hanh Anh 6 Mai Lan Huong.docx
Bai tap thuc hanh Anh 6 Mai Lan Huong.docxbichthuyt81
 
ReverseEngineerBoards_StarWarsEpisodeIII
ReverseEngineerBoards_StarWarsEpisodeIIIReverseEngineerBoards_StarWarsEpisodeIII
ReverseEngineerBoards_StarWarsEpisodeIIIartbysarahrodriguezg
 
Lost Keys Storyboard - Randomized Timed Exercise
Lost Keys Storyboard - Randomized Timed ExerciseLost Keys Storyboard - Randomized Timed Exercise
Lost Keys Storyboard - Randomized Timed Exercisemagalybtapia
 
Cat & Art100 A collection of cat paintings
Cat & Art100 A collection of cat paintingsCat & Art100 A collection of cat paintings
Cat & Art100 A collection of cat paintingssandamichaela *
 
怎么办理美国UC Davis毕业证加州大学戴维斯分校学位证书一手渠道
怎么办理美国UC Davis毕业证加州大学戴维斯分校学位证书一手渠道怎么办理美国UC Davis毕业证加州大学戴维斯分校学位证书一手渠道
怎么办理美国UC Davis毕业证加州大学戴维斯分校学位证书一手渠道7283h7lh
 
Aposimz storyboard portfolio piece Part 1
Aposimz storyboard portfolio piece Part 1Aposimz storyboard portfolio piece Part 1
Aposimz storyboard portfolio piece Part 1elijfdavis
 
San Jon Motel, Motel/Residence, San Jon, NM
San Jon Motel, Motel/Residence, San Jon, NMSan Jon Motel, Motel/Residence, San Jon, NM
San Jon Motel, Motel/Residence, San Jon, NMroute66connected
 
DAO 2004-24 - FORESHORE LEASE AGREEMENT.pptx
DAO 2004-24 - FORESHORE LEASE AGREEMENT.pptxDAO 2004-24 - FORESHORE LEASE AGREEMENT.pptx
DAO 2004-24 - FORESHORE LEASE AGREEMENT.pptxPhillisYvonMarshBagu
 
Edgar Allan Poe's City in the Sea - Storyboard
Edgar Allan Poe's City in the Sea - StoryboardEdgar Allan Poe's City in the Sea - Storyboard
Edgar Allan Poe's City in the Sea - Storyboardelijfdavis
 
Teepee Curios, Curio shop, Tucumcari, NM
Teepee Curios, Curio shop, Tucumcari, NMTeepee Curios, Curio shop, Tucumcari, NM
Teepee Curios, Curio shop, Tucumcari, NMroute66connected
 
My Morning Routine - Storyboard Sequence
My Morning Routine - Storyboard SequenceMy Morning Routine - Storyboard Sequence
My Morning Routine - Storyboard Sequenceartbysarahrodriguezg
 
SLIDESHARE. ART OF THE ROMANTIC PERIOD/ROMANTICISM Art
SLIDESHARE. ART OF THE ROMANTIC PERIOD/ROMANTICISM ArtSLIDESHARE. ART OF THE ROMANTIC PERIOD/ROMANTICISM Art
SLIDESHARE. ART OF THE ROMANTIC PERIOD/ROMANTICISM ArtChum26
 
Photos for Social Media - Summarized Research & Best Practices Lecture for f...
Photos for Social Media - Summarized Research & Best Practices Lecture for  f...Photos for Social Media - Summarized Research & Best Practices Lecture for  f...
Photos for Social Media - Summarized Research & Best Practices Lecture for f...Valters Lauzums
 

Recently uploaded (20)

Cat & Art98 A collection of cat paintings
Cat & Art98 A collection of cat paintingsCat & Art98 A collection of cat paintings
Cat & Art98 A collection of cat paintings
 
layered-cardboard-sculptures-miika-nyyssonen.pdf
layered-cardboard-sculptures-miika-nyyssonen.pdflayered-cardboard-sculptures-miika-nyyssonen.pdf
layered-cardboard-sculptures-miika-nyyssonen.pdf
 
Olympia Cafe, Restaurants-cafes, Albuquerque, NM
Olympia Cafe, Restaurants-cafes, Albuquerque, NMOlympia Cafe, Restaurants-cafes, Albuquerque, NM
Olympia Cafe, Restaurants-cafes, Albuquerque, NM
 
Cat & Art99 A collection of cat paintings
Cat & Art99 A collection of cat paintingsCat & Art99 A collection of cat paintings
Cat & Art99 A collection of cat paintings
 
Roadrunner Motel, Motel/Residence. Tucumcari, NM
Roadrunner Motel, Motel/Residence. Tucumcari, NMRoadrunner Motel, Motel/Residence. Tucumcari, NM
Roadrunner Motel, Motel/Residence. Tucumcari, NM
 
asteroid mining presentation for earth and space science
asteroid mining presentation for earth and space scienceasteroid mining presentation for earth and space science
asteroid mining presentation for earth and space science
 
IT TOWER DESIGN CHANDAKA BHUBANESWAR ODISHA
IT TOWER DESIGN CHANDAKA BHUBANESWAR ODISHAIT TOWER DESIGN CHANDAKA BHUBANESWAR ODISHA
IT TOWER DESIGN CHANDAKA BHUBANESWAR ODISHA
 
Bai tap thuc hanh Anh 6 Mai Lan Huong.docx
Bai tap thuc hanh Anh 6 Mai Lan Huong.docxBai tap thuc hanh Anh 6 Mai Lan Huong.docx
Bai tap thuc hanh Anh 6 Mai Lan Huong.docx
 
ReverseEngineerBoards_StarWarsEpisodeIII
ReverseEngineerBoards_StarWarsEpisodeIIIReverseEngineerBoards_StarWarsEpisodeIII
ReverseEngineerBoards_StarWarsEpisodeIII
 
Lost Keys Storyboard - Randomized Timed Exercise
Lost Keys Storyboard - Randomized Timed ExerciseLost Keys Storyboard - Randomized Timed Exercise
Lost Keys Storyboard - Randomized Timed Exercise
 
Cat & Art100 A collection of cat paintings
Cat & Art100 A collection of cat paintingsCat & Art100 A collection of cat paintings
Cat & Art100 A collection of cat paintings
 
怎么办理美国UC Davis毕业证加州大学戴维斯分校学位证书一手渠道
怎么办理美国UC Davis毕业证加州大学戴维斯分校学位证书一手渠道怎么办理美国UC Davis毕业证加州大学戴维斯分校学位证书一手渠道
怎么办理美国UC Davis毕业证加州大学戴维斯分校学位证书一手渠道
 
Aposimz storyboard portfolio piece Part 1
Aposimz storyboard portfolio piece Part 1Aposimz storyboard portfolio piece Part 1
Aposimz storyboard portfolio piece Part 1
 
San Jon Motel, Motel/Residence, San Jon, NM
San Jon Motel, Motel/Residence, San Jon, NMSan Jon Motel, Motel/Residence, San Jon, NM
San Jon Motel, Motel/Residence, San Jon, NM
 
DAO 2004-24 - FORESHORE LEASE AGREEMENT.pptx
DAO 2004-24 - FORESHORE LEASE AGREEMENT.pptxDAO 2004-24 - FORESHORE LEASE AGREEMENT.pptx
DAO 2004-24 - FORESHORE LEASE AGREEMENT.pptx
 
Edgar Allan Poe's City in the Sea - Storyboard
Edgar Allan Poe's City in the Sea - StoryboardEdgar Allan Poe's City in the Sea - Storyboard
Edgar Allan Poe's City in the Sea - Storyboard
 
Teepee Curios, Curio shop, Tucumcari, NM
Teepee Curios, Curio shop, Tucumcari, NMTeepee Curios, Curio shop, Tucumcari, NM
Teepee Curios, Curio shop, Tucumcari, NM
 
My Morning Routine - Storyboard Sequence
My Morning Routine - Storyboard SequenceMy Morning Routine - Storyboard Sequence
My Morning Routine - Storyboard Sequence
 
SLIDESHARE. ART OF THE ROMANTIC PERIOD/ROMANTICISM Art
SLIDESHARE. ART OF THE ROMANTIC PERIOD/ROMANTICISM ArtSLIDESHARE. ART OF THE ROMANTIC PERIOD/ROMANTICISM Art
SLIDESHARE. ART OF THE ROMANTIC PERIOD/ROMANTICISM Art
 
Photos for Social Media - Summarized Research & Best Practices Lecture for f...
Photos for Social Media - Summarized Research & Best Practices Lecture for  f...Photos for Social Media - Summarized Research & Best Practices Lecture for  f...
Photos for Social Media - Summarized Research & Best Practices Lecture for f...
 

Shooting schedule & risk assessment

  • 1. Shooting Schedule Date: Wednesday the 29th January 2014. Location: Nunnington Hall, Ryedale Equipment: Booked? (Y/N) DSLR Camera Y Tripod Y Memory Card Model Release forms Y Y Models: The images will be part of a collection of eight photographs that document Nunnington Hall. From Workers in the gardens preserving the National park to the workers in the shops selling local produce from farms nearby. The models used will be other people taking photographs as it is more of a documentary type of photography rather than a photojournalist approach. Props: Props used will only be that of what is found at Nunnington Hall, such as the tables and chairs found in the interior of the site. Risk assessment completed? Yes Contingency: To go into York city centre and take images of the old buildings and walls. Also as Nunnington halls staff might not be working, a contingency is put in place to take photographs of any workers in the garden industry. Should the weather effect the outcome of the photographs then it has been thought about to take the image indoors. One shoot should be enough to take the documentary images however if needed a location will be prepared for a second shoot. Risk Assessment Name: Alan Smith Project: Discovery/ Photography Location: Nunnington Hall
  • 2. Hazard Person(s) / Equipment at Risk Risk Control Taken What Health and Safety legislation might you need to consider in this project? Health and safety at work act 1974. I people and Tripping over due to weather Could harm am to consider the general duties strap over my when they the Having the of the students care because of I will therefore look at students acting responsibly and being safe when around certain of the tutors. conditions or maybe others around. head supporting the camera sites or equipment. To also consider the tutors (People in charge of students behaviour) and the way natural environment at the Camera falling may result in and making sure to look they should act. They should be trained to deal with certain aspects of the trip and to set an example on site. the lens being scratched or around the surroundings. how to behave in the premises of a National Park. They should also know whether the location of where even broken. the students going is safe. Also instruct the students to take photographs without supervision. Health and Safety (Display Screen Equipment) Regulations act 1992. This may be considered when editing the images taken on the computer. Regular breaks to be taken to avoid eye problems. Disturbing people’s Hazardous and healththe photographs People in (COSHH) regulations (2002). Registration, evaluation, Making sure nobody is in the Control of privacy. taken to chemicals to be way these camera when authorisation and restrictionmay not want(REACH) both of of the are used for risk assessment pictured. capturing an image. Also ask people if they mind or not being taken of. Touching harmful equipment (Gardening equipment) The person who may get hurt, the person responsible may be at risk of being punished and the equipment may be damaged. To not touch anything that has been left by a worker, also be aware of surroundings at all times. Darkroom exposure to chemical agents. It may lead to respiratory, allergic, and nervous system diseases. Having breaks every 15 minutes when in dark areas. SomeoneProvision and Use of Work may lead toRegulations 1998 (PUWER) the tripod falling over Tripod This Equipment the person To always keep tripping over to be harmed close by and not where and the tripod to potentially someone can walk near it. break. Pedestrians/ people Getting lost Ergonomic risk of handling heavy equipment. Me be crowded and can fall on the floor damaging equipment and others. Finding yourself lost from the others and may be harmed. To avoid going in areas where there are a vast amount of people. To stay within the grounds at all times and don’t go too far a drift from the other students. Person at risk of strain or the To make sure regular breaks camera and tripod may be in are taken to avoid neck pain danger of falling on the floor. and back pain.
  • 3. Planned places for photographsImage of a person taking a photograph. (No depth of field) (Quick shutter speed) (Model release form) Image of the full building (Wide shot) (Daylight White balance) (Rule of thirds)
  • 4. Image of worker- Gardener (Portrait- if possible or candid to show him at work) (Model release form) Image of giant chess set (Close up, looking up- to make the pieces look bigger) Image of inside (Tables & Chairs) (Rule of thirds) Image of organic garden- (Long shot, leading lines) Image of shop (workers) (Portrait, observational) Image of canteen (Medium shot) Image of Pic-nic spots (Depth of field used) Close ups on buildings design (Texture) (Slow Shutter speed) Image of exhibition (Use depth of field to capture many pieces in good detail) Example of model Release form! Models are to sign this in order to take images. This needs to be printed off and handed out to each model that participates in the photographs. If the person is of a young age then the parent/guardian must consent to images being taken.