Your SlideShare is downloading. ×
Lok ma chau loop & northeast new territories ndas
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Introducing the official SlideShare app

Stunning, full-screen experience for iPhone and Android

Text the download link to your phone

Standard text messaging rates apply

Lok ma chau loop & northeast new territories ndas

79
views

Published on

Planning and Engineering Study of Lok Ma Chau Loop

Planning and Engineering Study of Lok Ma Chau Loop

Published in: Technology

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
79
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. 經過了兩階段的公眾參與、規劃研究及詳細的技 術評估,研究已大致完成,河套地區的「建議發 展大綱圖」已經定稿。這份資料摘要主要向公眾 概述公眾參與的成果及研究的最後建議。 After two rounds of public engagement, planning analysis and detailed technical assessments, the Study has substantially been completed with the Recommended Outline Development Plan (RODP) confirmed. This Information Digest is mainly to inform the public the outcome of the public engagement and the final recommendations of the Study. 建議發展大綱圖定稿,研究大 致完成 Finalization of the Recommended Outline Development Plan. The Study is substantially completed. 2013 04