The presentation is showing summary of relief activity in Thar Pakistan for draught affected people. The funds were donated by Pakistan Professional Forum Qatar and the relief work on ground was carried out by a group of volunteers called Team Karachi

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
232
On SlideShare
0
From Embeds
0
Number of Embeds
4
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Ppf thar relief activity june-2014

  1. 1. Phase 1 Distribution of Ration Packs and Phase 2 Installation of Water wells & Hand Coordinated by Team Karachi on 26 June , 2014 Donated by Pakistan Professional Forum Qatar Relief Activity for draught effected areas in Thar Sindh- 2014
  2. 2. Summary of the Relief Activity • Pakistan Professional Forum (PPF) donated an amount of QAR 60,000 for the relief • efforts in draught effected areas of Thar in province of Sind, Pakistan • In Pakistan , PPF collaborated with Team Karachi, a group of volunteers to carry out the • relief work on ground • The relief efforts was divided in following two phases; 1) Distribution of Ration Packs to 300 families for immediate relief 2) Installation of 10 water hand pumps and 3 wells for the long term remedy. • The phase 1 of the project was completed on April, 20, 2014 when Team Karachi distributed 300 ration packs in 15 villages of Thar • The phase 2 of the project just completed by 20th June, 2014 when Team Karachi constructed 4 water wells & 10 hand pumps in most effected areas of Thar due to draught. • This presentation provides summary of the phase 2
  3. 3. Phase 1- Distribution of Ration Packs Items in Ration Packs Sr # Goods Quantity Price (RS) 1 Flour 10kg 450 2 Rice 10kg 650 3 Sugar 10kg 500 4 Lentils 2kg 160 5 Cooking oil 2kg 360 6 Tea 400g 180 Total 2,260
  4. 4. Phase 1- Distribution Points • Distribution at 1st point was for below mentioned people of 4 different villages: 1. Hoti Kharch, Deeplo, d/s Mithi, Sindh 2. Bhinghrraai, Deeplo, d/s Mithi, Sindh 3. Thebaai, Deeplo, d/s Mithi, Sindh 4. Athaai, Deeplo, d/s Mithi, Sindh • Distribution at 2nd point was for below mentioned people of 4 different villages: 5. Phararro, Deeplo, d/s Mithi, Sindh 6. Phararro, Raahma Parrhah, Deeplo, d/s Mithi, Sindh 7. Dhedhwar, Deeplo, d/s Mithi, Sindh 8. Chrakrro, Deeplo, d/s Mithi, Sindh • Distribution at 3rd point was for below mentioned people of 2 different villages: 9. Kari Veri, Deeplo, d/s Mithi, Sindh 10. Veeram Veri, Deeplo, d/s Mithi, Sindh • Distribution at 4th point was for below mentioned people of 5 different villages: 11. Dewaar, Deeplo, d/s Mithi, Sindh 12. Tarkasar, Deeplo, d/s Mithi, Sindh 13. Kharrkaasar, Deeplo, d/s Mithi, Sindh 14. Sgaar, Deeplo, d/s Mithi, Sindh 15. Ismaailabad, Deeplo, d/s Mithi, Sindh
  5. 5. Phase 1 – Distribution of Ration Packs Summary of Expenses Item Amount (PKR) Phase 1 Expenses Cost of 300 Ration Packs (2,260 x 300) 678,000 Cost of Logistics (Packing and Delivery)- These expenses are born by Team Karachi 60,000 Total expenses 738,000
  6. 6. S. No Location No. of Houses Total Depth Water Expenses Incurred 1 Goth Gabban, Deeplo, D/S Mitthi, Sindh 100 45 189,250 2 Goth Bhongrrai, Deeplo, D/S Mitthi,Sindh 80 30 175,340 3 Goth Thebaai, Deeplo, D/S Mitthi,Sindh 70 35 170,750 4 Goth Mehrrani, Deeplo, D/S Mitthi,Sindh 70 40 181,735 1 Goth Thebaai, Deeplo, D/S Mitthi. Sindh 70 42,275 2 Goth Kalri, Deeplo, D/S Mitthi. Sindh 30 19,850 3 Goth Mithu Dabrro, Deeplo, D/S Mitthi. Sindh 70 20,750 4 Goth Chitto, Deeplo, D/S Mitthi. Sindh 32 22,550 5 Goth Soomra Sar, Deeplo, D/S Mitthi. Sindh 90 62,330 6 Goth Waand Suleman, Deeplo, D/S Mitthi. Sindh 90 61,030 7 Goth Nabi Sar, Deeplo, D/S Mitthi. Sindh 100 64,955 8 Goth Kaatho, Deeplo, D/S Mitthi. Sindh 70 40,595 9 Goth Jagaari Saad, Deeplo, D/S Mitthi. Sindh 60 38,520 10 Goth Jagaari, Deeplo, D/S Mitthi. Sindh 60 38,620 Water Wells Water Hand Pumps Phase 2 Summary - Installation ofWater Hand Pumps and Well
  7. 7. Phase 2 Expense Summary Items Amount in PKR Cost of 10 Hand Pumps 411,475/- Cost of 4 Water Wells 717,075/- Logistic, Administrative & Coloring expenses 25,000/- Total Expense 1,153,550/-
  8. 8. Phase Item No.of items Avg.Cost Per item Total Cost Phase1 Distributionof RationPackts 300 2,460 738,000 Phase2 Installationof Water Wells 4 181,769 727,075 Phase2 Installationof Water HandPumps 10 42,648 426,475 1,891,550 Summarof Expenses- Two Phases Total Cost