Feedback Loops in Agile Development

  1. 1. Feedback Loops in Agile Developmentfrom the basic concepts to a prescriptive start Jamie Allsop http://www.agile-trac.org
  2. 2. Who Am I● On a payroll running distributed agile teams since 2004● Worked across different sectors in the software industry, from coding specialised DSP algorithms to delivering financial products worth 10s of millions in revenue● Currently in a company hoping to scale revenue significantly within the next two years by scaling and growing their software products● C++ Developer and co-author of a book on C++● Creator of agile-trac plugin http://www.agile-trac.org
  3. 3. Overview● Setting the context...Typical Development ● And why it can suck● Enter Agile Development...and useful Feedback ● What an Agile Methodology entails ● User Stories ● Agile Estimating and Planning ● Feedback in Agile Development● Tool Support and Practices ● Source Control Management ● Automation, Automation, Automation● A Brief Prescription
  4. 4. Typical Development● Inputs to development are usually ● Product Requirements Documents from marketing and business development (new development) ● Ticket Issues from customers (continuing development)● Product Requirements Documents ● full product specification generated up front ● used by development to create a Software Requirements Document● Transform Requirements Documents into a Development Plan ● develop a Gantt chart and Spreadsheets to provide an estimate of the work involved, typically covering a full release● Progress measured by Task Completion per Resource● Ticket Issues generally become deviation points for the plan
  5. 5. Typical Development● Inputs to development are usually ● Product Requirements Documents from marketing and business development (new development) Gat Gat ed I ed In Ticket Issues from customers (continuing development) ● nputs puts Product Requirements Documents used● full product Task Task used to D Deli to De specification generated up front Dtolcreate a Software r e ive ● very ry = P eriive = Prointo ve Task ● used by development Requirements Document● r gre Tasks Transform Requirements Documentsog a Development Plan ress s ● ss develop a Gantt chart and Spreadsheets to provide an estimate of the work involved, typically covering a full release● Progress measured by Task Completion per Resource● Ticket Issues generally become deviation points for the plan
  6. 6. Problems with Typical Development● Tasks are hard to trace to business value● Emphasis is on following a plan● The Plan is always out-of-date - changing it is heavyweight● Very difficult to assess where we are NOW● Incremental delivery of Product is hard as Tasks are not aligned with User Value● Incoming Issues deflect and interrupt the Plan – poor integration● Emphasis on where we would like to be: not where we are, or where we could be. Basically “wishful planning”
  7. 7. Problems with Typical Development● Tasks are hard to trace to business value● Emphasis is on following a plan● The Plan is always out-of-date - changing it is heavyweight Very difficult to assess where we are NOWllan P an P nhard e Tasksaare not iin Th e tais Thas rhe ad● Incremental delivery of Product a maiin t an he d full to m ve tiime ove r aligned with aiin fu to e ove● Pa n PUser Value iive t m mass interrupt the Plan – poor ass Incoming Issueses a a mand uiir es Req u r deflect integration q● Re● Emphasis on where we would like to be: not where we are, or where we could be. Basically “wishful planning”
  8. 8. Problems with Typical Development● Tasks are hard to trace to business value● Emphasis is on following a plan● The Plan is always out-of-date - changing it is heavyweight Some where we are NOW n S assess Very difficult to ometim times es man iin T h e Plla n he P a● n aniifeTt erhe ad mtaisfhard as Tasksaare not Incremental delivery of Product a nes Protje maiint Proto c a he d full jo ct Mvan tiimseeod er e m Ma t ov a m v s e ed as● aligned with aiin fu User Value t n Pa P nt r ssiive agers e ag e a ma ss interrupt the Plan – poor deflect a Incoming Issueses a mand iir es s Requ r Re u integration q●● Emphasis on where we would like to be: not where we are, or where we could be. Basically “wishful planning”
  9. 9. Progress is Measured Against the First, and Most Inaccurate, Estimate● Garbage in – Garbage Out● ISO 9001 – Clean Pipes, Dirty Water – Focus on how things are done, not why things are done● RAG status – How we are doing against our most inaccurate estimate? – Green for the lifetime of a delivery but still be late? R – Red for the lifetime of a delivery but be early? A – What does late and early actually mean? – We can base performance metrics on this data G● Focus on gated delivery and traceability● Often unclear whats done and whats not
  10. 10. Progress is Measured Against the First, and Most Inaccurate, Estimate● Garbage in – Garbage Out● ISO 9001 – Clean Pipes, Dirty Water – Focus on how things are done, not why things lu a eue lare done Va d V our most RAG status – How we are doingiite d te against Liim● inaccurate estimate? of Lm – Green for the lifetime of ck of ba ck R baadelivery but be early? a delivery but still be late? – Red for the lifetimed ee d ee of Fand early actually mean? F A – What does d iim m te d te late iibase performance metrics on this data G LL – We can● Focus on gated delivery and traceability● Often unclear whats done and whats not
  11. 11. Just iterating is not enough...● Bad data more often, doesnt make it good data● Reacting more often to bad data is worse● Reinforces bad habits● Insufficient time and freedom to make positive changes● Lack of useful data to build feedback loops gives you the overhead of iterations without the benefits● Keeping plans up-to-date is very expensive
  12. 12. Just iterating is not enough...● Bad data more often, doesnt make it good data● Reacting more often to bad data is worse● Reinforces bad habits● Insufficient time and freedom to make positive changes● Lack of useful data to build feedback loops gives you the overhead of iterations without the benefits● Keeping plans up-to-date is very expensive
  13. 13. Just iterating is not enough...● Bad data more often, doesnt make it good data● Reacting more often to bad data is worse Reinforces bad habits nent a ne nt● Perto a erm make positive P m● akes M akes ct Insufficient time and freedom tiice M erfe ct changes Prac t ce Prac NOT P erfe TP● NO build feedback loops Lack of useful data to gives you the overhead of iterations without the benefits● Keeping plans up-to-date is very expensive
  14. 14. What can we do?● Shift our focus from Plans that deliver Tasks● Instead focus on Planning and Value delivery● Observe and learn from Feedback paths● Avoid reacting to bad data● Understand what has been delivered● Have a view on what is still left to be done● Easier said than done...
  15. 15. What can we do?● Shift our focus from Plans that deliver Tasks Instead focus on Planning and Value delivery p......● ellp paths Observe and learn from Feedback n he an h t ca● nt c Avoid reacting to badme n me op data ellop● ev e been delivered D ev Understandille D has what gi e● Ag A● Have a view on what is still left to be done● Easier said than done...
  16. 16. Agile Development is Value Driven
  17. 17. Agile Development is Value Driven 30% Complete T3 T2 T1
  18. 18. Agile Development is Value Driven 30% Complete S1 S2 S3 T3 T2 T1
  19. 19. Agile Development is Value Driven 30% Complete Little or No User ValueTask to Value Correlation Low S1 S2 S3 T3 T2 T1
  20. 20. Agile Development is Value Driven 30% Complete Little or No User Value Means 30% DONETask to Value Correlation Low 30% User Value Delivered S1 S2 S3 T3 T2 T1
  21. 21. Agile Development is Value Driven 30% Complete Little or No User Value Means 30% DONETask to Value Correlation Low 30% User Value Delivered S1 S2 S3 T3 T2 T1 Selection of Ingredients vs Slices of the Cake
  22. 22. Where to begin...?
  23. 23. http://www.halfarsedagilemanifesto.org/ Where to begin...?
  24. 24. Where to begin...?http://www.halfarsedagilemanifesto.org/ d...... sse d A sse H H allf- A a f- iing e ng of b e of b are w ar e Be w Be
  25. 25. Lets try again Point your browser tohttp://agilemanifesto.org/
  26. 26. The Agile Value System
  27. 27. We All Need Principles● Early and continuous delivery of valuable software● Welcome changing requirements● Deliver working software frequently● Business people and developers work together● Trust motivated individuals● Working software is the primary measure of progress● Promote sustainable development● Technical excellence and good design● Simplicity is essential● Self-organising teams● Team reflection and adjustment● Face to Face Communication is the most effective
  28. 28. We All Need Principles● F ee F Early and continuous ack dbac k eedbdelivery of valuable software● Welcome changing requirements● Deliver working software frequently● Business people and developers work together● Trust motivated individuals● Working software is the primary measure of progress● Promote sustainable development● Technical excellence and good design● Simplicity is essential● Self-organising teams● Team reflection and adjustment● Face to Face Communication is the most effective
  29. 29. We All Need Principles● F ee F Early and continuous ack dbac k eedbdelivery of valuable software k● eedbac k F ee dbac Welcome changing requirements F● Deliver working software frequently● Business people and developers work together● Trust motivated individuals● Working software is the primary measure of progress● Promote sustainable development● Technical excellence and good design● Simplicity is essential● Self-organising teams● Team reflection and adjustment● Face to Face Communication is the most effective
  30. 30. We All Need Principles● F ee F Early and continuous ack dbac k eedbdelivery of valuable software k● eedbac k F ee dbac Welcome changing requirements F k● F eedbac k Deliver working software frequentlyee F dbac● Business people and developers work together● Trust motivated individuals● Working software is the primary measure of progress● Promote sustainable development● Technical excellence and good design● Simplicity is essential● Self-organising teams● Team reflection and adjustment● Face to Face Communication is the most effective
  31. 31. We All Need Principles● F ee F Early and continuous ack dbac k eedbdelivery of valuable software k● eedbac k F ee dbac Welcome changing requirements F k F eedbac k Deliver working software frequentlyee F dbac back●● eedbac k Business people and developers work together d F ee F● Trust motivated individuals● Working software is the primary measure of progress● Promote sustainable development● Technical excellence and good design● Simplicity is essential● Self-organising teams● Team reflection and adjustment● Face to Face Communication is the most effective
  32. 32. We All Need Principles● F ee F Early and continuous ack dbac k eedbdelivery of valuable software k● eedbac k F ee dbac Welcome changing requirements F k F eedbac k Deliver working software frequentlyee F dbac back●● eedbac k Business people and developers work together d F ee F● Trust motivated individuals ck● Feedba ck Fe Working software is the primary measure of progress edba● Promote sustainable development● Technical excellence and good design● Simplicity is essential● Self-organising teams● Team reflection and adjustment● Face to Face Communication is the most effective
  33. 33. We All Need Principles● F ee F Early and continuous ack dbac k eedbdelivery of valuable software k● eedbac k F ee dbac Welcome changing requirements F k F eedbac k Deliver working software frequentlyee F dbac back●● eedbac k Business people and developers work together d F ee F● Trust motivated individuals ck● Feedba ck Fe Working software is the primary measure of progress edba● Promote sustainable development● Technical excellence and good design● Simplicity is essential● Self-organising teams k● F eedbac k Team reflection and adjustment ee F dbac● Face to Face Communication is the most effective
  34. 34. We All Need Principles● F ee F Early and continuous ack dbac k eedbdelivery of valuable software k● eedbac k F ee dbac Welcome changing requirements F k F eedbac k Deliver working software frequentlyee F dbac back●● eedbac k Business people and developers work together d F ee F● Trust motivated individuals ck● Feedba ck Fe Working software is the primary measure of progress edba● Promote sustainable development● Technical excellence and good design● Simplicity is essential● Self-organising teams k● F eedbac k Team reflection and adjustment ee F dbac● Face to Face Communication is the mosteedback F eedback effective F
  35. 35. The Essence of Agile● Incrementally delivering actual value to the stakeholders● Coping deterministically with change: not trying to protect against it● Recognising that a productive environment for developers leads to more productivity in general and higher quality overall● Observing how well we work and adapting to make improvements● Maximising project transparency, fostering shared ownership and a shared vision of the project
  36. 36. The Essence of Agile● Incrementally delivering actual value to the stakeholders Coping deterministically with change: not trying to Ma x M ax● Thi T im protecthagainst itimi is iis s s ise U se U Recognising a mu productive environment for a ma that u s ef sefu ch b ull Fe ch b productivity in general and● developers leads to more ette Feedba e tt edb higher quality overall er p r plla ack ck ace ce to to s t star Observing how well we work and adapting to make art● improvements t● Maximising project transparency, fostering shared ownership and a shared vision of the project
  37. 37. Agile Development in a Nutshell
  38. 38. Agile Development in a Nutshell STARTIncubation Incubation
  39. 39. Agile Development in a Nutshell STARTIncubation Incubation Initiation Initiation
  40. 40. Agile Development in a Nutshell START Incubation Incubation Initiation Initiation User Stories Story 12 Story 2Story 1 Story 17 Story 13 Story 3Story 6 Story 7 Story 9Story 14 Story 4 Story 10 Story 8 Story 5 Story 16 Story 11 Story 15 Story 12 Story 18 Story 22Story 23 Story 21 Story 25 Story 19 Story 24 Story 20
  41. 41. Agile Development in a Nutshell START Incubation Incubation Initiation Initiation User Stories Story 12 Story 2Story 1 Story 17 Story 13 Story 3 ArchitectureStory 6 Story 7 Story 9 ArchitectureStory 14 Story 4 Story 10 Story 8 Story 5 Story 16 Story 11 Story 15 Story 12 Story 18 Story 22Story 23 Story 21 Story 25 Story 19 Story 24 Story 20
  42. 42. Agile Development in a Nutshell START Incubation Incubation Initiation Initiation TacitKnowledge User Stories Story 12 Story 2 Story 1 Story 17 Story 13 Story 3 Architecture Story 6 Story 7 Story 9 Architecture Story 14 Story 4 Story 10 Story 8 Story 5 Story 16 Story 11 Story 15 Story 12 Story 18 Story 22 Story 23 Story 21 Story 25 Story 19 Story 24 Story 20
  43. 43. Agile Development in a Nutshell START Incubation Incubation Initiation Initiation TacitKnowledge User Stories Story 12 Story 2 Story 1 Story 17 Story 13 Story 3 Architecture Story 6 Story 7 Story 9 Architecture Story 14 Story 4 Story 10 Story 8 Story 5 Story 16 Story 11 Story 15 Story 12 Story 18 Story 22 Story 23 Story 21 Story 25 Story 19 Story 24 Story 20 M1 M2 M3 Mn
  44. 44. Agile Development in a Nutshell START Incubation Incubation Initiation Initiation Tacit SharedKnowledge User Stories Vision Story 12 Story 2 Story 1 Story 17 Story 13 Story 3 Architecture Story 6 Story 7 Story 9 Architecture Story 14 Story 4 Story 10 Story 8 Story 5 Story 16 Story 11 Story 15 Story 12 Story 18 Story 22 Story 23 Story 21 Story 25 Story 19 Story 24 Story 20 M1 M2 M3 Mn
  45. 45. Agile Development in a Nutshell START Incubation Incubation Initiation Initiation Tacit SharedKnowledge User Stories Vision Story 12 Story 2 Story 1 Story 17 Story 13 Story 3 Architecture Story 6 Story 7 Story 9 Architecture Story 14 Story 4 Story 10 Story 8 Story 5 Story 16 Story 11 Story 15 Story 12 Story 18 Story 22 Story 23 Story 21 Story 25 Story 19 Story 24 Story 20 M1 M2 M3 Mn
  46. 46. Agile Development in a Nutshell START Incubation Incubation User Stories Iteration Planning Iteration Planning Initiation Initiation Tacit SharedKnowledge User Stories Vision Story 12 Story 2 Story 1 Story 17 Story 13 Story 3 Architecture Story 6 Story 7 Story 9 Architecture Story 14 Story 4 Story 10 Story 8 Story 5 Story 16 Story 11 Story 15 Story 12 Story 18 Story 22 Story 23 Story 21 Story 25 Story 19 Story 24 Story 20 M1 M2 M3 Mn
  47. 47. Agile Development in a Nutshell START Iteration Development Iteration Development Incubation Incubation User Stories Design Task List Write Tests Code Iteration Planning Iteration Planning Refactor Initiation Initiation User Doc Acceptance Tests Use Cases y da Update 1 Status Test Tacit Shared CasesKnowledge User Stories Vision Story 12 Story 2 Story 1 Story 17 Story 13 Story 3 Architecture Story 6 Story 7 Story 9 Architecture Story 14 Story 4 Story 10 Story 8 Story 5 Story 16 Story 11 Story 15 Story 12 Story 18 Story 22 Story 23 Story 21 Story 25 Story 19 Story 24 Story 20 M1 M2 M3 Mn
  48. 48. Agile Development in a Nutshell START Iteration Development Iteration Development Incubation Incubation User Stories Design Task List Write Tests Code Iteration Planning Iteration Planning Refactor Initiation Initiation User Doc Acceptance Tests Use Cases y da Update 1 Status Test Tacit Shared CasesKnowledge User Stories Vision Working Software Story 2 Story 12 & Documentation Story 1 Story 17 Story 13 Story 3 Architecture Story 6 Story 7 Story 9 Architecture Story 14 Story 4 Story 10 Story 8 Story 5 Story 16 Story 11 Story 15 Story 12 Story 18 Story 22 Story 23 Story 21 Story 25 Story 19 Story 24 Story 20 M1 M2 M3 Mn
  49. 49. Agile Development in a Nutshell START Iteration Development Iteration Development Incubation Incubation Tacit User Stories Knowledge Design Task List Write Tests Code Iteration Planning Iteration Planning Refactor Initiation Initiation User Doc Acceptance Tests Use Cases y da Update 1 Status Test Tacit Shared CasesKnowledge User Stories Vision Working Software Story 2 Story 12 & Documentation Story 1 Story 17 Story 13 Story 3 Architecture Story 6 Story 7 Story 9 Architecture Story 14 Story 4 Story 10 Story 8 Story 5 Story 16 Story 11 Story 15 Story 12 Story 18 Story 22 Story 23 Story 21 Story 25 Story 19 Story 24 Story 20 M1 M2 M3 Mn
  50. 50. Agile Development in a Nutshell START Iteration Development Iteration Development Incubation Incubation Tacit User Stories Knowledge Design Task List Write Tests Code Iteration Planning Iteration Planning Refactor Initiation Initiation User Doc Acceptance Tests Use Cases y da Update 1 Status Test Tacit Shared CasesKnowledge User Stories Vision Working Software Story 2 Story 12 & Documentation Story 1 Story 17 Story 13 Story 3 Architecture Story 6 Story 7 Architecture Story 14 Story 9 Story 4 Iteration Review Iteration Review Story 10 Story 8 Story 5 Story 16 Story 11 Story 15 Story 12 Story 18 Story 22 Story 23 Story 21 Story 25 Story 19 Story 24 Story 20 M1 M2 M3 Mn
  51. 51. Agile Development in a Nutshell START Iteration Development Iteration Development Incubation Incubation Tacit User Stories Knowledge Design Task List Write Tests Code Iteration Planning Iteration Planning Refactor Initiation Initiation User Doc Acceptance Tests Use Cases y da Update 1 Status Test Tacit Shared CasesKnowledge User Stories Vision Working Software Story 2 Story 12 & Documentation Story 1 Story 17 Story 13 Story 3 Architecture Story 6 Story 7 Architecture Story 14 Story 9 Story 4 Iteration Review Iteration Review Story 10 Story 8 Story 5 Story 16 Story 11 Story 15 Story 12 Story 18 Story 22 Story 23 Story 21 Story 25 Story 19 Iteration Retrospective Iteration Retrospective Story 24 Story 20 M1 M2 M3 Mn
  52. 52. Agile Development in a Nutshell START Iteration Development Iteration Development Incubation Incubation Tacit User Stories Knowledge Design Task List Write Tests Code Iteration Planning Iteration Planning Refactor Initiation Initiation User Doc Acceptance Tests Use Cases y da Update 1 Status Test Tacit Shared CasesKnowledge User Stories Vision Working Software Story 2 Story 12 & Documentation Story 1 Story 17 Story 13 Story 3 Architecture Story 6 Story 7 Architecture Story 14 Story 9 Story 4 Iteration Review Iteration Review Story 10 Story 8 Story 5 Story 16 Story 11 Story 15 Story 12 Story 18 Story 22 Story 23 Story 21 Story 25 Story 19 Iteration Retrospective Iteration Retrospective Story 24 Story 20 Ownership M1 M2 M3 Mn Evolution
  53. 53. Agile Development in a Nutshell START Iteration Development Iteration Development Incubation Incubation Tacit User Stories Knowledge Design Task List Write Tests Code Iteration Planning Iteration Planning Refactor Initiation Initiation User Doc Acceptance Tests Use Cases y da Update 1 Status Test Tacit Shared CasesKnowledge User Stories Vision Working Software Story 12 & Documentation Story 2 Issues Issues POs Story 1 Story 17 Story 13 Defects POs Requests Story 3 User Stories Architecture Story 6 Story 7 Architecture User Story Story 14 Story 9 Story 4 M1 M2 M3 GA Mn User Story User Story Iteration Review Iteration Review Story 10 Story 8 Story 5 Story 16 Story 11 Story 15 Story 12 Story 18 Release Planning Story 22 Release Planning Story 23 Story 21 Story 25 Story 19 Iteration Retrospective Iteration Retrospective Story 24 Story 20 Ownership M1 M2 M3 Mn Evolution
  54. 54. Agile Development in a Nutshell START Iteration Development Iteration Development Incubation Incubation Tacit User Stories Knowledge Design Task List Write Tests Code Iteration Planning Iteration Planning Refactor Initiation Initiation User Doc Acceptance Tests Use Cases y da Update 1 Status Test Tacit Shared CasesKnowledge User Stories Vision Working Software Story 12 & Documentation Story 2 Issues Issues POs Story 1 Story 17 Story 13 Defects POs Requests Story 3 User Stories Architecture Story 6 Story 7 Architecture User Story Story 14 Story 9 Story 4 M1 M2 M3 GA Mn User Story User Story Iteration Review Iteration Review Story 10 Story 8 Story 5 Story 16 Story 11 Story 15 Story 12 Story 18 Release Planning Story 22 Release Planning Story 23 Story 21 Story 25 Story 19 Iteration Retrospective Iteration Retrospective Story 24 Story 20 Shared Vision Ownership M1 M2 M3 Mn Evolution
  55. 55. Agile Development in a Nutshell START ITERATE Iteration Development Iteration Development Incubation Incubation Tacit User Stories Knowledge Design Task List Write Tests Code Iteration Planning Iteration Planning Refactor Initiation Initiation User Doc Acceptance Tests Use Cases y da Update 1 Status Test Tacit Shared CasesKnowledge User Stories Vision Working Software Story 12 & Documentation Story 2 Issues Issues POs Story 1 Story 17 Story 13 Defects POs Requests Story 3 User Stories Architecture Story 6 Story 7 Architecture User Story Story 14 Story 9 Story 4 M1 M2 M3 GA Mn User Story User Story Iteration Review Iteration Review Story 10 Story 8 Story 5 Story 16 Story 11 Story 15 Story 12 Story 18 Release Planning Story 22 Release Planning Story 23 Story 21 Story 25 Story 19 Iteration Retrospective Iteration Retrospective Story 24 Story 20 Shared Vision Ownership M1 M2 M3 Mn Evolution
  56. 56. Milestones, Iterations & Releases Milestone A Milestone B Iteration x Iteration x+1 Iteration x+2 Time
  57. 57. Milestones, Iterations & Releases Milestone A Milestone B Iteration x Iteration x+1 Iteration x+2User Stories Completed Over Time Time
  58. 58. Milestones, Iterations & Releases Milestone A Milestone B Iteration x Iteration x+1 Iteration x+2User Stories Completed Over Time Time
  59. 59. Milestones, Iterations & Releases Milestone A Milestone B Iteration x Iteration x+1 Iteration x+2User Stories Completed Over Time Time
  60. 60. Milestones, Iterations & Releases Milestone A Milestone B Iteration x Iteration x+1 Iteration x+2 User Stories Completed Over Time TimeRelease at end of Iteration Internal External Release x
  61. 61. Milestones, Iterations & Releases Milestone A Milestone B Iteration x Iteration x+1 Iteration x+2 User Stories Completed Over Time TimeRelease at end of Iteration Internal Milestone A External Release x Release x+1
  62. 62. Milestones, Iterations & Releases Milestone A Milestone B Iteration x Iteration x+1 Iteration x+2 User Stories Completed Over Time TimeRelease at end of Iteration Internal Milestone A External Release x Release x+1 Release x+2
  63. 63. Milestones, Iterations & Releases Milestone A Milestone B Iteration x Iteration x+1 Iteration x+2 User Stories Completed Over Time TimeRelease at end of Iteration Internal Milestone A External Release x Release x+1 Release x+2Release at end Milestone A of Milestone Internal External
  64. 64. Milestones, Iterations & Releases Milestone A Milestone B Iteration x Iteration x+1 Iteration x+2 User Stories Completed Over Time TimeRelease at end of Iteration Internal Milestone A External Release x Release x+1 Release x+2Release at end Milestone A of Milestone Internal External Release A?
  65. 65. Milestones, Iterations & Releases● Milestones are prioritised collections of User Stories● Iterations are fixed-length, time-boxed periods over which User Stories are Delivered● Release scope is defined by the User Stories it contains, not the Iteration it is delivered in● You may time Releases with Iterations but the scope will always be bounded by the Stories● Think of a Release as an Externalised Milestone
  66. 66. Milestones, Iterations & Releases● Milestones are prioritised collections of User Stories Miilles M est tones on fixed-length, time-boxed periods Iterations are es Grou● Itera Iterat Group tiio User p & Pr Delivered over whichons DeStories&areiiorit ns Del Pr or Rellea Re eas liiver T ver Th itiise S se Sto ses Ex is defined em the UsertStories it es Ex Release scope ter hem in by in T oriies r es ternal Tiime-b● naliise it is deliveredoin contains, not the Iterationto Ss e to me-b Stake oxes x es takeho hollder● You may time Releases with Iterationsdbut the ers s scope will always be bounded by the Stories● Think of a Release as an Externalised Milestone
  67. 67. User Stories: Sized, Measurable Units of Value● Identifies the need to Deliver Value to a User without committing to all the details● Just-In-Time Understanding● Captures both functional and non-functional requirements in a uniform way● Stories Relatively Sized from a fixed scale 1 2 3 5 8 13 20 40 100 A reasonable size to consider Too large to consider for work in an for work in an Iteration. Iteration. Needs to be split.
  68. 68. User Story Dependency View Implicit Implementation Ordering● The flatter this view the more flexible the release planning Dependency View of User Stories
  69. 69. User Story Dependency View Implicit Implementation Ordering● The flatter this view the more flexible the release planning Dependency View of User Stories iings h ngs me t h ers o me t h ers fe:: S o re ot h iife S o e ot of L t of L n bef or Fac t Fac e n bef happ e h ap p ha h ve to a ve to
  70. 70. User Story Dependency View Implicit Implementation Ordering● The flatter this view the more flexible the release planning Dependency View of User Stories Howe Howev ver cle er clev iings h ngs allllow a ow ver SSome t h er :SSo me t e : t ory Se others Spif iLiif e t ory r pli thers Spif iL f o k ng t befo Se lottiing act o k ngethrou or p it t ng can F ac t F app pp n r efgh enhbough can ve to h a e to h the t the tr ree ha v ha ee
  71. 71. Split Large Stories as their Priority Increases● Large Stories in upcoming milestones should be split● Stories too big for an iteration must be split● This is not easy, but improves understanding● The User Story Tree gets broader and deeper SystemAdmin should be SourceAdmin should have able to enjoy an the ability, within the SourceAdmin can AWESOME automated context of this product, configure which sources install on Windows 2000, to report on sources are collectable. XP, 2003 available to the product SourceAdmin SourceAdmin SourceAdmin can ... can ... ... can ... SystemAdmin ... can ... SourceAdmin can ... SystemAdmin should ... SourceAdmin SourceAdmin can ... should ... SystemAdmin can ... SystemAdmin Capability View of User Stories SourceAdmin will ... will ...
  72. 72. Split Large Stories as their Priority Increases● Large Stories in upcoming milestones should be split● Stories too big for an iteration must be split This is not easy, but improves understanding iiew biilliity V ew Capa b ty V pa ugh the Ca and deepercture ugh the● The Userkiing Th ro StoryTh ro gets broader chiite cture Spiik n Sp g Tree the Ar ch te ugh the Ar● g th r o u g h piikiin g thro llllows S p k n a ow s S SystemAdmin should be SourceAdmin should have a able to enjoy an the ability, within the SourceAdmin can AWESOME automated context of this product, configure which sources install on Windows 2000, to report on sources are collectable. XP, 2003 available to the product SourceAdmin SourceAdmin SourceAdmin can ... can ... ... can ... SystemAdmin ... can ... SourceAdmin can ... SystemAdmin should ... SourceAdmin SourceAdmin can ... should ... SystemAdmin can ... SystemAdmin Capability View of User Stories SourceAdmin will ... will ...
  73. 73. From Not Done to DONE● We want consistent delivery of User Stories● We plan to deliver User Stories NOT Tasks● Sizing and Iterations allow us to predict future work
  74. 74. From Not Done to DONE● We want consistent delivery of User Stories● We plan to deliver User Stories NOT Tasks● Sizing and Iterations allow us to predict future work 5 1 13 8 2 5 1 8 20 3 3 1 5 2 13 5 3 40 8 5 5 3 2 5 13 8 3 1 8 2 13 1 13 20 20 8 100 5 8 3 13
  75. 75. From Not Done to DONE● We want consistent delivery of User Stories● We plan to deliver User Stories NOT Tasks● Sizing and Iterations allow us to predict future work 5 1 13 8 2 5 1 3 8 20 Time and Effort 3 1 5 2 13 5 3 40 8 5 5 3 2 5 13 8 3 1 8 2 13 1 13 20 20 8 100 5 8 3 13
  76. 76. From Not Done to DONE● We want consistent delivery of User Stories● We plan to deliver User Stories NOT Tasks● Sizing and Iterations allow us to predict future work 8 Time and Effort 3 1 5 2 13 5 2 3 40 1 8 3 5 5 3 2 2 8 5 5 13 8 3 1 8 5 3 8 2 13 1 13 5 1 13 20 20 8 100 13 5 8 3 13 8 8
  77. 77. Planning to Deliver “Planning is everything, plans are nothing”● Agile focuses on the practice of planning but avoids trying to follow a plan● We do planning to help us understand where we might be in the future, based on what we know today, and what we observed in the past● Planning allows us to continually update our view of the future for the short, medium and long term● In Agile we plan at several levels and throughout the development of a product
  78. 78. Planning to Deliver “Planning is everything, plans are nothing”● Agile focuses on the practice of planning but avoids trying to follow a plan rst and dwhattwed We do planning to help us understandawhere we n de rs n know might be in the future,etter u n e● b et t er u to b based on atiing e whatd toobservedtiin the ng needwe today, W e nee d Est im at past W and n Es m niing a nd● Pllan n nto a P an us g continually update our view of Planning allows the future for the short, medium and long term● In Agile we plan at several levels and throughout the development of a product
  79. 79. Understand Different Levels of Planning
  80. 80. Understand Different Levels of Planning Strategy
  81. 81. Understand Different Levels of Planning Strategy Portfolio
  82. 82. Understand Different Levels of Planning Product is composed of Releases Strategy Portfolio Product
  83. 83. Understand Different Levels of Planning Product is composed of Releases Milestone 1 Strategy Portfolio Product Release
  84. 84. Understand Different Levels of Planning Product is composed of Releases Milestone 1 Milestone 2 is Release 1.0 Strategy Portfolio Product Release
  85. 85. Understand Different Levels of Planning Product is composed of Releases Milestone 1 Milestone 2 is Release 1.0 Milestone 3 Strategy Portfolio Product Release
  86. 86. Understand Different Levels of Planning Product is composed of Releases Milestone 1 Milestone 2 is Release 1.0 Milestone 3 Strategy Portfolio Product Release Iteration 1
  87. 87. Understand Different Levels of Planning Product is composed of Releases Milestone 1 Milestone 2 is Release 1.0 Milestone 3 Strategy Portfolio Product Release Iteration 1 Iteration Task Time Design X 1 hour Implement X ½ day Implement Y 4 days Meetings 1 hour Automate Tests 2 days
  88. 88. Understand Different Levels of Planning Product is composed of Releases Milestone 1 Milestone 2 is Release 1.0 Milestone 3 Strategy Portfolio Product Release Iteration 1 Iteration Task Time Design X 1 hour Implement X ½ t? day midays m4 Implement Y Co MeetingsC an 1 hour Automate Tests 2 days
  89. 89. Understand Different Levels of Planning Product is composed of Releases Milestone 1 Milestone 2 is Release 1.0 Milestone 3 Strategy Portfolio Product Release Iteration 1 Iteration 2 Iteration Task Time Design X 1 hour Implement X ½ t? day midays m4 Implement Y Co MeetingsC an 1 hour Automate Tests 2 days
  90. 90. Understand Different Levels of Planning Product is composed of Releases Milestone 1 Milestone 2 is Release 1.0 Milestone 3 Strategy Portfolio Product Release Iteration 1 Iteration 2 Iteration 3 Iteration 4 Iteration Task Time Design X 1 hour Implement X ½ t? day midays m4 Implement Y Co MeetingsC an 1 hour Automate Tests 2 days
  91. 91. Understand Different Levels of Planning Product is composed of Releases Milestone 1 Milestone 2 is Release 1.0 Milestone 3 Strategy Portfolio Product Release Iteration 1 Iteration 2 Iteration 3 Iteration 4 Iteration Task Time Daily Design X 1 hour Story Active Done Implement X ½ t? day midays OpsUser ... Implement Y Co m4 SysAdmin ... MeetingsC an 1 hour Trader ... Automate Tests 2 days
  92. 92. Understand Different Levels of Planning Product is composed of Releases Milestone 1 Milestone 2 is Release 1.0 Milestone 3 Strategy Portfolio Product Release Iteration 1 Iteration 2 Iteration 3 Iteration 4 Iteration Task Time Daily Design X 1 hour Story Active Done ½ t? Implement X day midays OpsUser ... ? m4 ues Implement Y an Co SysAdmin ... I ss MeetingsC 1 hour Any Trader ... Automate Tests 2 days
  93. 93. Understand Different Levels of Planning Product is composed of Releases Milestone 1 Milestone 2 is Release 1.0 Milestone 3 Strategy Portfolio Product Release Iteration 1 Iteration 2 Iteration 3 Iteration 4 Iteration Task Time Daily Design X 1 hour Story Active Done ½ t? Implement X day midays OpsUser ... ? m4 ues Implement Y an Co SysAdmin ... I ss MeetingsC 1 hour Any Trader ... Automate Tests 2 days The Planning Onion shows how the different levels of planning are layered

×