• Save
Portfolio Adrian Benavides M
Upcoming SlideShare
Loading in...5
×
 

Portfolio Adrian Benavides M

on

  • 230 views

Sample of works in which I have participated.

Sample of works in which I have participated.

Statistics

Views

Total Views
230
Views on SlideShare
230
Embed Views
0

Actions

Likes
0
Downloads
0
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Portfolio Adrian Benavides M Portfolio Adrian Benavides M Presentation Transcript

  • PORTFOLIOAdrián Benavides Martínez Architect – Arquitecto adbenav@hotmail.com
  • Tender presentation: Study for a bus terminal and 12mid-size urban bus stations in the Wilaya M´Sila.Algeria.Client: Republique Algerienne Democratique etPopulaire. Wilaya de M´Sila. Direction des Transports.Project details: Bus terminal: 10,000 sqm plot; 650 sqmbuilding. 12 urban stations: 3,000 to 10,000 sqm plots;145 to 200 sqm buildings.Total budget: 6 Million francs CFA.Function: Architectural project co-author for TRNIngeniería. 2011Presentación a oferta internacional. Estudio paraterminal de autobuses y 12 estaciones urbanas detamaño medio en la Wilaya de M´Sila. Argelia.Cliente: Republique Algerienne Democratique etPopulaire. Wilaya de M´Sila. Direction des Transports.Detalles: Terminal de autobuses: parcela 10,000 m2; 650m2 cubiertos. 12 estaciones urbanas: parcelas de 3 a10.000 m2; 145 a 200 m2 cubiertos.Presupuesto total: 6 Millones francos CFA.Función: Co-autor de proyecto de Arquitectura para TRNIngeniería. 2011 Portfolio Adrian Benavides Martinez 2
  • Project: Feasability study for a multimodalplatform in Ngaoundéré, Cameroon.Client: Ministry of Transports, Cameroon.Project details: Logistic platform: trucks and railinterchange, facilities for drivers, warehouses andworkshops. Tenant space for future development.Budget: 12,500 million CFA Francs.Function: Architectural project co-author and dossierwriting for TRN Ingeniería. 2011Proyecto: Estudio de factibilidad para una Plataformamultimodal en Ngaoundéré, Camerún.Cliente: Ministerio de Transportes, Camerún.Detalles: Plataforma Logística: aparcamiento decamiones, intercambiador ferroviario, equipamiento paraconductores, almacenes y talleres. Espacio para futurodesarrollo.Presupuesto: 12.500 millones Francos CFA.Función: Co-autor del proyecto de Arquitectura yredacción de documentos técnicos para TRN Ingeniería.2011 Portfolio Adrian Benavides Martinez 3
  • Tender presentation: Construction project forworkshops, garages and maintenance areas for LasPalmas de Gran Canaria – Maspalomas railway.Client: Ferrocarriles de Gran Canaria, Spain.Project details: Traffic control room, offices, trainsgarage and maintenance workshops.Budget: 1 million €.Function: Architectural project co-author for TRNIngeniería. 2011Presentación a oferta: Proyecto de construcciónpara talleres, cocheras y áreas de mantenimientopara Ferrocarril de Las Palmas de Gran Canaria –Maspalomas.Cliente: Ferrocarriles de Gran Canaria, España.Detalles: Centro de control de tráfico, oficinas, cocherasy áreas de mantenimiento para trenes.Presupuesto: 1 millón €.Función: Co-autor de proyecto de Arquitectura para TRNIngeniería. 2011 Portfolio Adrian Benavides Martinez 4
  • Tender presentation: Construction project for fiveInterchanges for the South Tenerife Train Line.1:Santa Cruz Centro. 2: Santa Maria del Mar. 3: SanIsidro. 4: Los Cristianos. 5: Costa Adeje.Client: Metro de Tenerife. Tenerife, Spain.This image: Santa Cruz interchange, which includeda new connection with existing bus terminal.Associated with AMP Architects and CMN Engineering.Function: Architectural project co-author for TRNIngeniería. 2010Presentación a oferta: Proyecto de construcciónpara cinco Intercambiadores para el Tren del Sur deTenerife.1: Santa Cruz Centro. 2: Santa Maria delMar. 3: San Isidro. 4: los Cristianos. 5: Costa Adeje.Cliente: Metro de Tenerife. Tenerife, España.Esta imagen: Intercambiador de Santa Cruz centro, queincluía una conexión con la estación de autobusesexistente.Asociados con AMP Arquitectos y CMN Ingenieria.Función: Co-autor de proyecto de Arquitectura para TRNIngeniería. 2010 Portfolio Adrian Benavides Martinez 5
  • 3 Rest Areas in the A2 National highway , located onkilometers 453, 472 and 482. Lerida, Spain.Client: Dirección General de Carreteras, Ministerio deFomento, España.Details: Self-sufficient modular bathroom service units,aimed for efficient energy consumption and lowmaintenance costs.Function: Co-author of Concept design and Constructionproject for TRN Ingeniería. 20093 áreas de descanso en la autovía A-2 del Nordeste.Km 453, 472 y482. Provincia de Lérida, España.Cliente: Dirección General de Carreteras, Ministerio deFomento, España.Detalle: Unidad autosuficiente de aseos públicos,diseñados para un consumo de energía eficiente y bajoscostos de mantenimiento.Función: Desarrollo de idea y co-autor de proyecto deConstrucción para TRN Ingeniería. 2009 Portfolio Adrian Benavides Martinez 6
  • Final Career Project(Validation to spanish Architect degree).Ceramics Investigation Centre in Tavernes Blanques,Valencia, Spain.Escuela Técnica Superior de Arquitectura. UniversidadPolitécnica de Valencia, Spain.Details: Administration, Communication andEducation, Investigation, Laboratories, Design andObservations department, and Investigators residence.Total floor area: 10,000 sqm.The program was solved in one large front building withadditional “fingers” housing the specific areas.2008-2009Proyecto Fin de Carrera(Homologación de título a equivalente Español).Centro de Investigación de la Cerámica en TavernesBlanques, Valencia, España.Escuela Técnica Superior de Arquitectura. UniversidadPolitécnica de Valencia, España.Detalles: Administración, Divulgación y formacióncontinua, Investigación, Laboratorios, Unidad de Diseño yobservatorio de la Cerámica, y Residencia parainvestigadores. Área total: 10.000 m2.El programa fue resuelto en un edificio frontal con “dedos”adicionales alojando las áreas específicas.2008-2009 Portfolio Adrian Benavides Martinez 7
  • Feasability study for transport interchange, publicpedestrian spaces, and trolley line renovation andextension.Client: Vaslui city Council, Romania.Remarks: In this project I had to define the programareas, draft the solutions and deliver a publicpresentation to the Council, where all four projects wereapproved for a later request for European CohesionFunding.Budget: 4,1 million €.Function: Co-author of Architectural project for TRNIngeniería. 2009Estudio de Factibilidad para Intercambiador detransportes, áreas peatonales, y renovación yextensión de línea de trolebús.Cliente: Concejo de la ciudad de Vaslui, Rumania.Detalles: en este proyecto hubo que definir elprograma, desarrollar los esquemas conceptuales, yrealizar una presentación pública al Consejo. Todos losproyectos fueron aprobados para una posterior solicitudde Fondos de Cohesión Europeos.Presupuesto: 4,1 millones €.Función: Co-autor de proyecto de Arquitectura para TRNIngeniería. 2009 Portfolio Adrian Benavides Martinez 8
  • Construction Project: Mendez Alvaro interchange.Client: Metro de MadridDetails: Addition to improve the mobility in an existingunderground interchange (Metro and Cercanias localtrains).Area: 700 sqm; budget: 40 million €.Function: Architectural project coordinator for TRNIngenieriaMadrid, Spain. 2008Proyecto Constructivo: Intercambiador MéndezÁlvaro. Madrid.Cliente: Metro de MadridDetalles: Ampliación y reforma para mejorar lamovilidad en un intercambiador existente de Metro y trende Cercanías.Sup: 700 m2; Presupuesto: 40 millones €.Función: Coordinador de proyecto de Arquitectura paraTRN Ingeniería.Madrid, España. 2008 Portfolio Adrian Benavides Martinez 9
  • Study: Integration of Abroñigal container station intothe passenger railway network and its influence inMadrid´s urban structure.Client: Municipality of Madrid.Details: Study for Spain´s biggest passenger traininfrastructure (Puerta de Atocha) to deal with the futuretrain traffic demand. The proposal included anotherInterchange in the near Abroñigal site, to allow new Highvelocity train, subway, local trains, intercity bus station,car parking, and commercial space facilities.500,000 sqm building area.Function: Architectural project coordinator for TRNIngeniería.Madrid, Spain. 2007 - 2008Estudio: Integración de la Estación de Contendoresde Abroñigal en la red de transporte de pasajeros ysu influencia en la estructura urbana de Madrid.Cliente: Ayuntamiento de Madrid.Detalles: Estudio para la mayor infraestructura ferroviariade viajeros de España (Puerta de Atocha) para cubrir lafutura demanda de tráfico ferroviario. La propuestaincluía otro Intercambiador en el cercano predio deAbroñigal, para alojar instalaciones de tren de AltaVelocidad, Metro, tren de Cercanías, estación deautobuses interurbanos y de larga distancia,aparcamiento, y espacios comerciales.500.000 m2 cubiertos.Función: Coordinador de proyecto de Arquitectura paraTRN Ingeniería.Madrid, España. 2007 - 2008 Portfolio Adrian Benavides Martinez 10
  • Feasability study for a bus operation centre inViladecans, Barcelona, Spain.Client: EMT Barcelona.Associated with: Domingo Ferré Arquitectes.Details: Barcelona´s bus network is supported withservice bases located in both north and south of themetropolitan area. Projected service area: 70,000 sqm.Above-ground future building area for developers:70,000 sqm.Budget: 70 million €.Function: Architectural project coordinator for TRNIngeniería. 2007-2008Estudio de factibilidad para un Centro Operativo deAutobuses en Viladecans, Barcelona, España.Cliente: EMT Barcelona.Asociados con: Domingo Ferré Arquitectes.Detalles: la red de autobuses en el Área metropolitanade Barcelona está apoyada con bases de servicioslocalizadas en el norte y sur del Área metropolitana.Área de servicios proyectada: 70.000 m2. Área parafuturos desarrollos sobre rasante: 70.000 m2.Presupuesto: 70 millones €.Función: Coordinador de proyecto de Arquitectura paraTRN Ingeniería. 2007 -2008 Portfolio Adrian Benavides Martinez 11
  • Study: Urban integration of the High velocity Trainstation in Almería.Client: Ministerio de Fomento, Spain.Details: Urban project with a large station roof, supervisingan impacting render contract .Function: Architectural project coordinator for TRNIngeniería. 2007Estudio: Integración urbana de la estación de AltaVelocidad de Almería.Cliente: Ministerio de Fomento, España.Detalles: Diseño urbano de una estación con una cubiertaextensa, y la supervisión de un contrato de infografíaimpactante.Función: Coordinador de proyecto de Arquitectura paraTRN Ingeniería. 2007 Portfolio Adrian Benavides Martinez Portfolio Adrian Benavides Martinez 12
  • Technical Assistance: Main Tunnels Control Centre,Second Control Centre and Safety systems intunnels.Client: Madrid Calle 30.Details: Main Control Centre: 2,700 sqm, urban roadtunnels: 50 km.Budget: Main Control Centre: 2,7 million €; safetysignalling: 4,9 million €; Total project budget: 6,3 billion €.The images show the Control Room and one of theemergency exits in the tunnels.Function: Technical Assistance Architect, Site managersupervision for TRN Ingeniería.Madrid, Spain. 2006 - 2007Asistencia Técnica: Centro de Control de Túnelesprincipal, Centro de Control de Respaldo y Sistemasde seguridad en túneles.Cliente: Madrid Calle 30.Detalles: Centro de Control principal: 2.700 m2, 50 km detúneles urbanos.Presupuesto: Centro de Control principal: 2,7 millones €;Señalización de seguridad: 4,9 millones €; Presupuestoglobal: 6.300 millones €.Las imágenes son de la Sala de Control y de uno de lospórticos de las Salidas de Emergencia en túneles.Función: Arquitecto para Asistencia Técnica, supervisiónde ejecución para TRN Ingeniería.Madrid, España. 2006 - 2007 Portfolio Adrian Benavides Martinez 13
  • Architectural competition:University School of Languages.Client: Universidad Nacional de Córdoba. Argentina.Details: A 2,500 sqm scholar building which had to bebuilt in two phases, keeping an overall image from thebeginning. The ramp and underground access added aplayful quality for occasional passers-by.Córdoba, Argentina. 2003Concurso de Arquitectura:Escuela Universitaria de Lenguas.Cliente: Universidad Nacional de Córdoba. Argentina.Detalles: Un edificio educativo de 2.500 m2 quehabría de construirse en dos etapas. Se propusomantener una imagen global desde el principio. Larampa y acceso subterráneo agrega una cualidad lúdicapara paseantes ocasionales.Córdoba, Argentina. 2003 Portfolio Adrian Benavides Martinez 14
  • Study: Proposal for the reorganisation of publicspaces in 15,8 hectare university campus.Client: Universidad Nacional de Córdoba. Argentina.Details: The proposal included land zoning, allocation forfuture buildings, their extensions and a study of pedestrianpaths and meeting spaces.Córdoba, Argentina. 2003Estudio: Propuesta para la reorganización de losespacios públicos. Campus universitario de 15,8hectáreas.Cliente: Universidad Nacional de Córdoba. Argentina.Detalles: La propuesta incluía la zonificación, previsiónpara nuevos edificios, sus ampliaciones y el estudio decaminos peatonales y espacios de reunión.Córdoba, Argentina. 2003 Portfolio Adrian Benavides Martinez 15
  • International Architectural competition:“Portal Bicentenario”.Details: A former airport, with 245 hectares of availableland for a master plan proposal.Santiago de Chile. 2001Concurso Internacional de Proyectos:“Portal Bicentenario”.Detalles: Un antiguo aeropuerto, con 245 hectáreas desuelo disponible para un proyecto de desarrollourbanístico.Santiago de Chile. 2001 Portfolio Adrian Benavides Martinez 16
  • International Architectural competition:Cordoba government house.Details: An urban master plan proposal including a100,000 sqm civic centre complex designed with a 430 mlong building.Córdoba, Argentina. 2001Concurso Internacional de Arquitectura:Casa de Gobierno de Córdoba.Detalles: propuesta urbana que incluía un complejogubernamental de 100.000 m2 resuelto con un edificiode 430 m de largo.Córdoba, Argentina. 2001 Portfolio Adrian Benavides Martinez 17
  • National Architectural competition:300 public housing complex “El Pocito”.A 26,500 sqm, complex with 300 social housing units.The idea was to create two opposite sides, facing onehigh-rise (9-10 floors high) and one low-rise (2-3 floors)neighbourhood.Córdoba, Argentina. 1998Concurso Nacional de arquitectura:300 viviendas en “El Pocito”.Un conjunto de 26.500 m2 con 300 viviendas deprotección oficial. La idea fue crear dos caras opuestas,enfrentando un barrio de edificios altos (9-10 plantas) yotro de edificios bajos (2-3 plantas).Córdoba, Argentina. 1998 Portfolio Adrian Benavides Martinez 18