Unit78 production log_251113

149 views

Published on

Published in: Design
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
149
On SlideShare
0
From Embeds
0
Number of Embeds
22
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Unit78 production log_251113

  1. 1. Salford City College Eccles Sixth Form Centre BTec Level 3 Extended Diploma in Creative Media Production Games Design Unit 78 – Digital Graphics for Computer Games HA3 – Transformation Production Log Name Adam Bailey Date:20-11-2013 I finished Task 1 to 3 through the study day and then started on Task 4 with great difficulty due to the fact of not understanding what had to be done in this task Date:25-11-2013 Got some help from Harry so I could understand what I had to do in Task 4 do a bit of Task 4 then started on Task 5 by starting to do the background on illustrator. I didn’t start the photo-shoot or the Photoshop collage because I thought if I did the background first it would be easier due to the fact of saving the easier stuff for last. Date:26-11-2013 Harry told me that I had to do the photo-shoot so I could have a start to the character I did multiple shots so that the Date:27-11-2013 I did some drawing at home but I realised that my drawing wasn’t that great so I binned then and then gathered images from the internet as secondary sources and then started on the character collage, at first I started on gathering images Date:2-12-2013 I started collaging the images over the idea of my character image from the photo-shoot
  2. 2. Date:3-12-2013 Finished the background on illustrator, focus more on the Photoshop collage Date:9-12-2013 Finished the photoshop collage and then start tracing round the items and character Date:10-12-2013 Start trying to make layering of tracings work well with each other Date:16-12-2013 Start work on the Task 6 and 7 Date:17-12-2013 Started work on the production log from task 4, I did the production log now because I thought it would be easier to do it then instead of during at the time. Date: Date: Date:
  3. 3. Add as required

×