Your SlideShare is downloading. ×
Production schedule
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Saving this for later?

Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime - even offline.

Text the download link to your phone

Standard text messaging rates apply

Production schedule

203
views

Published on


0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
203
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
4
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. S.T.A.Rz<br />Production Schedule <br />WhatWhoWhereWhenProps/ Material/ Equipment needed Tick if CompletedMeetingThe Production Team Class- T14Wednesday02/02/1111:00amComputerTickedBook Venue - The Alexander House (For First & Second Shooting)The Production Team, Person In Charge of VenueThe Alexander HouseThursday03/02/113:30pmLocation ContractTickedPermission slip DeadlineThe Production Team & Actors, as well as Volunteers & HelpersThe CFGS School Library (On main site)Friday04/02/1112:40pmPermission Contract & Job DescriptionTicked Health and Safety for First VenueThe Production Team The Alexander House (CFGS)Friday04/02/113:30pmHealth and Safety List TickedMeeting The Production TeamClass- T14Monday 07/02/1112- 12:20pmComputer and notes bookTickedFirst Shooting The Production Team & Actor (in place of Mother)The Alexander House (CFGS)Monday07/02/113:30pmCameras, Tripod, Costumes, & Storyboard TickedSecond ShootingThe Production Team & Actor (in place of dad), as well as other Actors (to play the role of Extra girls in scene)The Alexander House (CFGS)Monday 14/02/11Cameras, Tripod, Costumes, & StoryboardTickedThird ShootingAbisola, Extra girlsCFGS PlaygroundWednesday 16/02/1112:40-1:30 pmCameras, Tripod, Costumes, & StoryboardTickedFourth ShootingSiddiquea and Abisola CFGS dance Studio Wednesday 16/02/113:20-4:10 Cameras, Tripod, Costumes, & StoryboardTickedLast ShootingThe production team CFGS PlaygroundSiddiquea BedroomThursday 17/02/11Cameras, Tripod, Costumes, & StoryboardTicked<br />*The Production Team- Abisola, Rubina, Siddiquea and Tangina<br />