Your SlideShare is downloading. ×
Sm group peb presentation
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Sm group peb presentation

874
views

Published on

Published in: Business

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
874
On Slideshare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
38
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. WELCOME
    • S M GROUP OF INDUSTRIES
    “ We Binding to a Quality Service & Customer Satisfaction”
  • 2. S M Group of Industries “ Everything in Turnkey Industrial Projects”
  • 3.
    • PEB Building Structure.
    • Land Development.
    • Fabrication & Fire Works.
    • Over Head Crane.
    • Construction.
    • Electrical H.T. & L.T.
    • Plumbing & Sanitation.
    • Painting & Office Interior.
    • Air Conditioner.
    • M/C Erection.
  • 4.
    • Office Buildings.
    • Factory Shed.
    • Godown/Warehouse.
    • Car Parking.
    • Stadiums/Auditoriums.
    • Show Rooms.
    • Petrol Pumps.
    • Railway Ports.
    • Airports.
    • Ship Yards.
    SCOP OF SUPPLY
  • 5. INTRODUCTION-PEB
    • 1900s -CONCEPT OF METAL BUILDINGS ORIGINATED IN US.
    • SIMPLE INDUSTRIAL STRUCTURES USING TRUSS RAFTERS, STRAIGHT COLUMNS.
    • SECTIONAL ROOFS & WALL. WEDGE PINS FOR
    • CONNECTIONS.
    • 1940s -MASS PRODUCTION HOUSING AND STORAGE MODULES FOR US ARMY DURING WORLD WAR II
    • 1950s -COMPUTERISED DESIGN ALLOWED BLDGS TO BE
    • TAILORED TO INDIVIDUAL CUST. REQUIREMENTS
  • 6. INTRODUCTION-PEB
    • 1960s - ROLL FORMING LINES ALLOWED CONTINUOUS SPAN COLD ROLLED Z-PURLINS.
    • COLOR COATED PANELS AND FACTORY INSULATED
    • PANELS IMPROVED ARCHITECTURAL APPEARANCE.
    • MAJOR INCREASE IN DESIGN POSSIBILITIES CONTRIBUTED TO THE BOOM IN METAL BUILDINGS.
    • THE TERM PRE-ENGINEERED BUILDINGS (PEB)CAME INTO EXISTENCE.
  • 7. INTRODUCTION-PEB
    • 1990s -PRECISION ROLL FORMING LINES FOR THE
    • CLADDING AND SEC. MEMBERS
    • AUTO. PROD. LINES FOR STRUCT. SECTIONS
    • HIGH QUALITY PAINT SYSTEMS FOR STEEL ANDCLADDING.
    • HIGH QUALITY PAINT SYSTEMS FOR STEEL AND
    • CLADDING.
    • MBMA STATISTICS SHOW, ABOUT 60 % OF LOW
    • RISE INDUSTRIAL AND COMM. BLDGS. IN THE
    • U.S.A. USE THE P.E.B. SYSTEM
  • 8. MAIN FEATURES
    • BUILDINGS ARE PRE-ENGINEERED AS THEY RELY ON STANDARD DESIGNS WITH STANDARD CONFIGURATIONS, WITH EACH COMPONENTS OF THE BUILDING SYSTEM UNIQUELY PROFILED AND PRE-ENGINEERED TO SUIT DESIGN REQUIREMENTS.
    • BY USING SOPHISTICATED MANUFACTURING FACILITIES AND ENGG SOFTWARE, THE PEBS ARE CUSTOM DESIGNED TO MEET THE SPECIFIC CUSTOMER NEEDS .
    • PEBS ARE ALWAYS MANUFACTURED IN FACTORIES AND SHIPPED TO JOB SITES FOR ASSEMBLY.
    • PEB USES SYSTEMS APPROACH BY COMBINING ELEMENTS SUCH AS ROOF PANELS, WALL PANELS, PURLINS, GIRTS, MAIN FRAMES, WIND BRACINGS ETC TO ACT INTEGRALLY.
  • 9.
    • ADVANTAGES OF PEB
  • 10. ADVANTAGES OF PEB
    • FASTER COMPLETION
    • FLEXIBILITY IN EXPANSION
    • LARGE CLEAR SPANS UPTO 90M
    • FACTORY CONTROLLED QUALITY
    • VIRTUALLY MAINTENANCE FREE
    • ARCHITECTURAL VERSATALITY
    • SINGLE SOURCE RESPONSIBILITY FOR MATERIAL SUPPLIES
    • LOWER OVERALL COST
  • 11. PROCESS FLOW CHART PROCESS FLOW CHART WITH REVIEWS AND CONTROL SALES& MARKETING Receipt of order/tender/enquiry from Customer Contract review CUSTOMER SUPPORT DEPT. Co-ordination /Communication with customer Contract review Design & Development of product. Engineering design as per National /International standards. Contract review Planning & Inventory control Production Planning & Inventory control Quality Control Purchasing Procurement of right material Quality Control stores Storage of material in a right manner Quality Control Production &Shipping of material Production of right quality of material &Dispatch as per Schedules Quality Control
  • 12. QUALITY ASSURANCE
    • FUNCTIONS-
    • VERIFICATION ,INSPECTION AND TESTING OF
    • RAW MATERIALS
    • IN-PROCESS PRODUCTS &
    • FINISHED PRODUCTS
  • 13. QUALITY ASSURANCE Incoming Inspection of Raw material/Accessories/Consumables:- as per “International standards -AS/ASTM /ISO PROCEDURES &Indian Standards (IS)”
  • 14. RAW MATERIAL SPECIFICATIONS IMPORTANT RAW MATERIAL SPECIFICATIONS MATERIAL USED FOR SPECSIFICATION GRADE HR PLATE COLUMNS ASTM A 572M 50 HR PLATE RAFTERS ASTM A 572M 50 HR PLATE CRANE BEAMS ASTM A 572M 50 GI COILS PURLINS/EAVES/C-SECTIONS ASTM A 572M/ GSM-120 50 COLOR COATED COILS ROOF/WALL SHEETING ASTM A 792M 50/80 PAINT SURFACE PROTECTION BURGER PAINT REDOXIDE HT FASTENERS CONNECTION NUMBERS ASTM A 325M 9.8/8.8
  • 15. IN PROCESS INSPECTION In process Inspection - AREA SUB-AREA INSPECTION PERCENTAGE REFERENCE STANDARD/SPEC. PRIMARY MEMBERS SHEARING / MULTI -TOURCH 5% OF lot MBMA PRIMARY MEMBERS H-BEAM 5% OF lot MBMA PRIMARY MEMBERS FIT-UP(BUILT-UP) 100% MBMA PRIMARY MEMBERS WELDING 100% AWS D1.1 PRIMARY MEMBERS CLEARING(FINAL) 100% MBMA SECONDARY MEMBERS ALL PROCESS 5% OF lot MBMA SECONDARY MEMBERS PAINTING 10%OF lot ASTM PRIMARY MEMBERS PAINTING 10% OF lot ASTM PRIMARY MEMBERS DISPATCH 100% SMGI SECONDARY MEMBERS DISPATCH 5% OF lot SMGI
  • 16.  

×