Status report 3
Upcoming SlideShare
Loading in...5
×
 

Status report 3

on

  • 154 views

 

Statistics

Views

Total Views
154
Views on SlideShare
154
Embed Views
0

Actions

Likes
0
Downloads
0
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Status report 3 Status report 3 Presentation Transcript

  • Status Report #2
    Team 8
    January24, 2011
    Zachery Chaney
    Mark Foresman
    Ryan Mertz
    Wesley Richard
    ATALIS is an automated alcohol inventory control system for use in bars and restaurants.
  • Overall Need
    Bars and restaurants lose up to 30 percent of their inventory due to alcohol “shrinkage” because of a lack of accurate and reliable inventory tracking.
    Project Milestones
    19 January 2011 – Design dimensions finalized
    01 February 2011 – Prototype stand holder completed
    01 March 2011 – Sensor circuits complete and combined with bottle stand.
    01 April 2011 – Software fully implemented and working
    25 April 2011 – Project completed and demonstrated
  • Recently Completed Tasks
    Website
    First sensor driving circuit complete
    Took weight of full bottle for calibration and conditioning of sensors.
    Built second prototype board and experimented with different inner molding materials
    Finished RFID reader code
    View slide
  • Ongoing/ Pending Tasks
    Still developing most workable/usable stand design for real world application
    Conditioning/Calibration of force sensors.
    RFID reader testing
    Final stages of website
    View slide
  • Upcoming Tasks
    Final construction of stand (hopefully)
    RFID code testing
    Software implementation
  • Second prototype construction/molding materials and first sensor circuit.
  • Functional Block Diagram
  • Project Schedule
  • Questions?