SHIP’S SURVEY & GOOD    MAINTENANCE      ON BOARD  NIPPON KAIJI KYOKAI       (ClassNK)
Introduction to ClassNKNippon Kaiji Kyokai, known as ClassNK or NK,is a ship classification society.It is what is known un...
Presented by• Lcdr. Prayudh Thongdii Surveyor
Periodical surveys•   2.1 General•   2.2 Annual Surveys•   2.3 Intermediate Surveys•   2.4 Special Surveys•   2.5 Docking ...
Bulk Carrier
Bulk Carrier
Container Carrier
Oil Tanker
LNG Carrier
General Cargo
Reefer Carrier
Vehicles Carrier
Tug Boat
Annual Surveys1 The purpose of an Annual Survey is to confirm that the general condition of the hull is maintained at a sa...
Intermediate Surveys1 The Intermediate Survey may be held at or between the second or third Annual Survey in each five yea...
Special Surveys1 The Special Surveys are carried out at five-year intervals  for the purpose of establishing the condition...
Drydocking (Bottom) SurveysThe objective of docking the ship periodicallyis to inspect the portion of the hull beneaththe ...
Propeller Shaft Survey
Check lists•   Hull & Machinery•   Fire fighting appliances•   Machinery in engine room•   Electrical Equipment•   Mooring...
Class Survey              General Examinations                      (Hull)01 Shell plating above W.L.02 Weather deck plati...
Hull08 Load line marks09 Bulwarks, guard rails and freeing ports10 Means of access ; gangways, walkways and life  lines11 ...
Performance Test (Hull)01 Doors on watertight bulkheads02 Drainage, mooring and anchoring arrangements and  their accessor...
Hull• 11 Quantity of dry chemical powder  extinguishing medium• 12 Fixed carbon dioxide fire fighting system  (Piping and ...
Hull• 16 Fixed pressure water spraying fire fighting     system (System and pump of the system)• 17 Automatic sprinkler sy...
Machinery            • General Examinations01 Main propulsion machinery, power  transmission machinery, shafting  system,p...
Machinery                • Performance Tests01 Shut-off devices for oil tanks02 Emergency shut-down of motor for F.O. pump...
Maintenance Check lists
Hull & Machinery   Items                 Check Points• Freeboard marks     • Clearly marked on                        shel...
Hull & Machinery   Items                  Check Points• Superstructure end   • No heavy wastage  bulkhead               ex...
Hull & Machinery    Items                  Check Points• Doors of all access  • Effective  openings in bulkhead   weathert...
Hull & Machinery   Items                  Check Points• Access hatches • Effective weathertightness.                 • Hat...
Hull & Machinery    Items                    Check Points• Cargo • Effective weathertightness.  hatches • Hatch coamings a...
Hull & Machinery   Items                  Check Points• Machinery space • Effective weathertightness.  openings        • C...
Hull & Machinery    Items                    Check Points• Manholes,          • Effective weathertightness.  flush scuttle...
Hull & Machinery   Items                   Check Points• Deckhouses,        • Effective weathertightness.  companionways  ...
Hull & Machinery   Items                  Check Points• Ventilators   • Coamings in good condition                  withou...
Hull & Machinery   Items                Check Points• Air      • Coamings in good condition  pipes      without heavy corr...
Hull & Machinery   Items                  Check Points• Cargo ports    • Effective weathertightness.  and similar    • Ste...
Hull & Machinery   Items                   Check Points• Scuppers, inlets,   • Distance pieces in good  discharges        ...
Hull & Machinery   Items                    Check Points• Side scuttles     • Effective watertightness.                   ...
Hull & Machinery   Items                    Check Points• Freeing ports       • Draining arrangements                     ...
Hull & Machinery   Items                  Check Points• Bulwarks and stays, • Condition in good order  guard rails        ...
Hull & Machinery   Items                  Check Points• Life lines,     • Condition in good order  gangways,         witho...
Hull & Machinery   Items                   Check Points• Uprights, lashings   • Sockets, eye plates,                      ...
Hull & Machinery   Items                  Check Points• Main deck plating    • Condition in good order.• Cross deck platin...
Hull & Machinery   Items                    Check Points• F‘cle deck plating,   • Condition in good order.• Poop deck plat...
Hull & Machinery   Items                   Check Points• All piping on deck   • Condition in good order.  with valves     ...
Hull & Machinery   Items                     Check Points• Electric cable        • Condition in good order.  conduit      ...
Hull & Machinery   Items                  Check Points• Cargo holds   • Bulkheads, frames, tanktop                  platin...
Hull & Machinery   Items                   Check Points• Ballast   • No leakage, damage.  tanks     • Bulkheads (trans/lon...
Hull & Machinery   Items                   Check Points• Cargo    • No leakage, damage.  tanks    • Bulkheads (trans/longl...
Hull & Machinery   Items                   Check Points• Fuel oil • No leakage, damage.  tanks    • Bulkheads (trans/longl...
Hull & Machinery   Items                   Check Points• Other compartments • Bulkheads (trans/longl.),  (Bos‘n store, dec...
Hull & Machinery    Items                     Check Points• Pump • Bulkheads, longitudinals, web frames, other         mem...
Hull & Machinery   Items                  Check Points• Water ingress alarm   • Working satisfactorily• system
Hull & Machinery   Items                  Check Points• Remote pump control    • Working satisfactorily  system  (F.P.T, B...
Hull & Machinery   Items                   Check Points• High velocity P/V     • Working satisfactorily• valve            ...
Fire Fighting Appliances  Item                         Check points• Fire integrity             • Insulation on “A” class ...
Fire Fighting Appliances  Item                       Check points• Fire doors              • Operate satisfactorily.      ...
Fire Fighting Appliances  Item                        Check points• Fire dampers              • Operate satisfactorily.   ...
Fire Fighting Appliances  Item                    Check points• Main fire pumps      • Operate satisfactorily.            ...
Fire Fighting Appliances  Item                    Check points• Emergency fire pump   • Operates                          ...
Fire Fighting Appliances  Item                      Check points• Fire main piping       • No leakage, heavy              ...
Fire Fighting Appliances  Item                     Check points• Hydrants              • Fire hoses easily                ...
Fire Fighting Appliances  Item                      Check points• Fire hoses             • All hoses in good              ...
Fire Fighting Appliances  Item                   Check points• Nozzles            • All nozzles in good                   ...
Fire Fighting Appliances    Item                        Check points• Portable fire    • Checking the number of portable f...
Fire Fighting Appliances   Item                          Check points• Portable foam        • Checking the air-foam nozzle...
Fire Fighting Appliances  Item                        Check points• Foam type fire              • Visual condition in good...
Fire Fighting Appliances   Item                        Check points• Fixed fire extinguishing •   CO2 or Halon cylinders t...
Fire Fighting Appliances  Item                     Check points• Fire detection        • Regular checking of              ...
Fire Fighting Appliances    Item                      Check points• Fuel oil tank shut-off      • All valves to be closed ...
Fire Fighting Appliances  Item                     Check points• Emergency stop of       • Satisfactory operation  fans   ...
Fire Fighting Appliances  Item                     Check points• Means of isolating the   • Satisfactory operation• fuel s...
Fire Fighting Appliances      Item                         Check points•   Fireman‘s •   Two(2) sets for cargo ships / Fou...
Fire Fighting Appliances  Item                     Check points• Fire extinguishing • Fire fighting system in good  arrang...
Fire Fighting Appliances  Item                      Check points• International   • At least one (1) shore   shore        ...
Fire Fighting Appliances  Item                    Check points• Inert gas system   • Operates satisfactorily.             ...
Machinery in engine room  Item          Check Points• Main engines • Operate satisfactorily.               • Safety device...
Machinery in engine room  Item            Check Points• Generator        • Operate satisfactorily.  engines          • Saf...
Machinery in engine room  Item          Check Points• Boilers    • Operate satisfactorily.             • Safety devices fu...
Machinery in engine room  Item         Check Points• Stern Tube Seal      • No leakage of oil /                         Se...
Machinery in engine room  Item            Check Points• Essential      • Operate satisfactorily.  machinery      • Safety ...
Machinery in engine room  Item         Check Points• Piping      • No heavy corrosion or leakage.              • No soft p...
Machinery in engine room  Item              Check Points• Bilge lines          • Bilge pumps, pipings                     ...
Machinery in engine room  Item          Check Points• Overall of  •   Cleanliness of E/R  Engine Room     Must be clean wi...
Machinery in engine room  Item         Check Points• Automatic Control   •   Engine Telegraph  System              •   Ala...
Electrical system   Item                        Check Points• Lighting in E/R           • All lights in good              ...
Electrical system   Item                 Check Points• Lighting in        • All lights in good  accommodation        order...
Electrical system   Item                    Check Points• Lighting in control      • All lights in good• station, working ...
Electrical system   Item                  Check Points• Emergency cables    • Condition in good                        ord...
Electrical system   Item                   Check Points• Emergency lights     • All lights in good                        ...
Electrical system   Item                   Check Points• Anti-explosion lights   • All lights in good  in                 ...
Electrical system   Item                   Check Points• Insulating mats   • Insulating mats available  around MSB        ...
Electrical system   Item                    Check Points• Insulation resistance   • No alarm of low                       ...
Electrical system   Item                     Check Points• Penetration in fire    • Filling material in  resisting divisio...
Mooring arrangements Item                Check points• Anchor & chain   • Condition in good order, no  cables             ...
Mooring arrangements Item               Check points• Windlass       • Winches in good condition.                 • Brake ...
Mooring arrangements Item              Check points• Mooring      • Winches in good condition.  system       • Brake bands...
Docking Survey01 Shell plating including keel plates, stem and  stern frame(s) 02 Rudder(s) : Measurement Rudder Clearance...
Docking Survey05 After end of stern tube : Measurement Tail  Shaft Clearance06 Propeller(s)07 Valves and cocks on shell pl...
Propeller Shaft Survey01 Connection part with propeller (including  examination of shaft by efficient crack detection02 Pr...
Propeller Shaft Survey07 Propeller boss bore in way of shaft taper  section08 Controllable Pitch Propeller (CPP)09 Water l...
The End
Ship survey presentation
Ship survey presentation
Ship survey presentation
Upcoming SlideShare
Loading in...5
×

Ship survey presentation

16,542

Published on

NKK - Ship survey & inspection

Published in: Business
0 Comments
22 Likes
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
16,542
On Slideshare
0
From Embeds
0
Number of Embeds
10
Actions
Shares
0
Downloads
1,737
Comments
0
Likes
22
Embeds 0
No embeds

No notes for slide

Ship survey presentation

  1. 1. SHIP’S SURVEYNIPPON KAIJI KYOKAI
  2. 2.
  3. 3. SHIP’S SURVEY & GOOD MAINTENANCE ON BOARD NIPPON KAIJI KYOKAI (ClassNK)
  4. 4. Introduction to ClassNKNippon Kaiji Kyokai, known as ClassNK or NK,is a ship classification society.It is what is known under Japanese law as a publicservice foundation and in its Act of Endowment, itsultimate goal is expressed as: "to contribute to thedevelopment of maritime service for the protection ofhuman life and property at sea". Environmentalprotection has also become an increasingly majorconcern.
  5. 5. Presented by• Lcdr. Prayudh Thongdii Surveyor
  6. 6. Periodical surveys• 2.1 General• 2.2 Annual Surveys• 2.3 Intermediate Surveys• 2.4 Special Surveys• 2.5 Docking Surveys• 2.6 Boiler Survey (Skip)• 2.6 Propeller Shaft Survey
  7. 7. Bulk Carrier
  8. 8. Bulk Carrier
  9. 9. Container Carrier
  10. 10. Oil Tanker
  11. 11. LNG Carrier
  12. 12. General Cargo
  13. 13. Reefer Carrier
  14. 14. Vehicles Carrier
  15. 15. Tug Boat
  16. 16. Annual Surveys1 The purpose of an Annual Survey is to confirm that the general condition of the hull is maintained at a satisfactory level.2 Generally as the ship ages, ballast tanks are required to be subjected to more extensive overall and close-up surveys at Annual Surveys.
  17. 17. Intermediate Surveys1 The Intermediate Survey may be held at or between the second or third Annual Survey in each five year Special Survey cycle. Those items, which are additional to the requirements of the Annual Surveys, may be surveyed either at or between the 2nd and 3rd Annual Survey. The intermediate survey contains requirements for extended overall and close-up surveys including thickness measurements of cargo and ballast tanks.
  18. 18. Special Surveys1 The Special Surveys are carried out at five-year intervals for the purpose of establishing the condition of the structure to confirm that the structural integrity is satisfactory in accordance with the Classification Requirements, and will remain fit for its intended purpose for another five-year period, subject to proper maintenance and operation of the ship and to periodical surveys carried out at the due dates.2 The Special Survey concentrates on close-up surveys in association with thickness measurements and is aimed at detecting fractures, buckling, corrosion and other types of structural deterioration.3 Thickness measurements are to be carried out upon agreement with the Classification Society concerned in conjunction with the Special Survey.
  19. 19. Drydocking (Bottom) SurveysThe objective of docking the ship periodicallyis to inspect the portion of the hull beneaththe water-line which those parts of the hullunder the water-line are always immersed inwater; therefore, the condition of damage inthe event of the ship stranding /grounding/damages cannot be observed.
  20. 20. Propeller Shaft Survey
  21. 21. Check lists• Hull & Machinery• Fire fighting appliances• Machinery in engine room• Electrical Equipment• Mooring arrangements• Docking Survey• Propeller Shaft Survey
  22. 22. Class Survey General Examinations (Hull)01 Shell plating above W.L.02 Weather deck plating03 Openings on deck and outside of hull, deck house, companionway, hatch coamings and covers, side ports, cargo ports and side scuttles04 Exposed engine casing and skylights05 Ventilators06 Air pipes and sounding pipes07 W. T. bulkheads and superstructures end bulkheads including W. T. doors, penetrations, Stop valves and door openings
  23. 23. Hull08 Load line marks09 Bulwarks, guard rails and freeing ports10 Means of access ; gangways, walkways and life lines11 Scuppers, inlets, other discharge pipes and valves12 Anchoring and mooring arrangement13 Fire extinguishing arrangement14 Fire protection and means of escape, etc.15 Loading computer16 Ship Identification Number
  24. 24. Performance Test (Hull)01 Doors on watertight bulkheads02 Drainage, mooring and anchoring arrangements and their accessories03 Appliances related to fire protection and escape04 Fire detection and fire alarm system including manually operated call points05 Fire pump including emergency fire pump, piping, hydrants, hoses, nozzles, etc.06 Ventilation system fan07 Fixed dry-chemical powder fire fighting system08 Water spray system09 Quantity of Carbon dioxide extinguishing medium10 Quantity of halon extinguishing medium
  25. 25. Hull• 11 Quantity of dry chemical powder extinguishing medium• 12 Fixed carbon dioxide fire fighting system (Piping and alarm of systems)• 13 Fixed halon fire fighting system (Piping and alarm of systems)• 14 Fixed foam fire fighting system (Piping)• 15 Fixed high expansion foam fire fighting system (Piping)
  26. 26. Hull• 16 Fixed pressure water spraying fire fighting system (System and pump of the system)• 17 Automatic sprinkler system (Delivery alarm and pump)• 18 Closing appliances of openings related to fire fighting in way of cargo holds
  27. 27. Machinery • General Examinations01 Main propulsion machinery, power transmission machinery, shafting system,prime movers other than main propulsion machinery, boilers, thermal oil heaters,incinerators, pressure vessels, auxiliary machinery, piping systems, control systems,electrical installations and switchboards02 Engine room, boiler spaces and means of escape03 Refrigerating machinery except "RMC“ •
  28. 28. Machinery • Performance Tests01 Shut-off devices for oil tanks02 Emergency shut-down of motor for F.O. pumps, cargo oil pumps, ventilating fans& boiler draught fans03 Emergency electrical power source04 Communication system with Engineers alarm05 Steering gears ( including control system )06 Bilge system07 Safety devices or alarm devices of main propulsion machinery and auxiliary machinery08 Safety devices or alarm devices of boilers, thermal oil heaters and incinerators09 Monitoring devices, such as pressure indicators, thermometers etc.
  29. 29. Maintenance Check lists
  30. 30. Hull & Machinery Items Check Points• Freeboard marks • Clearly marked on shell plating each side.
  31. 31. Hull & Machinery Items Check Points• Superstructure end • No heavy wastage bulkhead exceeding permissible limit.
  32. 32. Hull & Machinery Items Check Points• Doors of all access • Effective openings in bulkhead weathertightness. at ends of enclosed • No heavy corrosion, superstructures. holes. • Condition of gaskets and clamping devices in good order.
  33. 33. Hull & Machinery Items Check Points• Access hatches • Effective weathertightness. • Hatch coamings in good condition without heavy wastage or holes. • Condition of gaskets and clamping devices in good order.
  34. 34. Hull & Machinery Items Check Points• Cargo • Effective weathertightness. hatches • Hatch coamings and stays in good condition without heavy wastage or holes. • Hatch covers in good condition without heavy wastage or holes. • Condition of gaskets and clamping devices in good order. • Battens and wedges available on board in good order. • Tarpaulins in good condition without holes.
  35. 35. Hull & Machinery Items Check Points• Machinery space • Effective weathertightness. openings • Covers, casings and coamings in good condition without heavy wastage or holes
  36. 36. Hull & Machinery Items Check Points• Manholes, • Effective weathertightness. flush scuttles • Covers and bolts in good condition without heavy wastage.
  37. 37. Hull & Machinery Items Check Points• Deckhouses, • Effective weathertightness. companionways • Bulkhead plating in good with openings in condition without heavy freeboard deck corrosion or holes. • Doors in good condition without heavy • corrosion or holes. • Gaskets and clamping devices in good order.
  38. 38. Hull & Machinery Items Check Points• Ventilators • Coamings in good condition without heavy corrosion, holes. • Closing covers in good condition, efficient weathertightness. • Gaskets, clamping devices in order.
  39. 39. Hull & Machinery Items Check Points• Air • Coamings in good condition pipes without heavy corrosion or holes. • Air pipe heads in good condition without heavy corrosion or holes. • Floats in pipe heads in good order. • Wire gauzes in good condition. (for oil tanks only)
  40. 40. Hull & Machinery Items Check Points• Cargo ports • Effective weathertightness. and similar • Steel plating and attachments openings in good condition without heavy wastage.
  41. 41. Hull & Machinery Items Check Points• Scuppers, inlets, • Distance pieces in good discharges condition without heavy corrosion or holes. • Non-return valves in good order without heavy corrosion or holes.
  42. 42. Hull & Machinery Items Check Points• Side scuttles • Effective watertightness. • Deadlights in good order.
  43. 43. Hull & Machinery Items Check Points• Freeing ports • Draining arrangements in good order.
  44. 44. Hull & Machinery Items Check Points• Bulwarks and stays, • Condition in good order guard rails without heavy corrosion, holes or cracks.
  45. 45. Hull & Machinery Items Check Points• Life lines, • Condition in good order gangways, without heavy corrosion, passages missing components or holes.
  46. 46. Hull & Machinery Items Check Points• Uprights, lashings • Sockets, eye plates, stanchions in good • condition without heavy corrosion, holes or • cracks.
  47. 47. Hull & Machinery Items Check Points• Main deck plating • Condition in good order.• Cross deck plating • No heavy wastage, corrosion, cracks.
  48. 48. Hull & Machinery Items Check Points• F‘cle deck plating, • Condition in good order.• Poop deck plating • No heavy wastage, corrosion, cracks.
  49. 49. Hull & Machinery Items Check Points• All piping on deck • Condition in good order. with valves • No heavy wastage, corrosion, cracks.
  50. 50. Hull & Machinery Items Check Points• Electric cable • Condition in good order. conduit • No heavy wastage, corrosion, cracks.
  51. 51. Hull & Machinery Items Check Points• Cargo holds • Bulkheads, frames, tanktop plating in good condition. • No heavy corrosion, wastage, holes or cracks. • Access ladders, piping in good condition. • No heavy wastage, holes.
  52. 52. Hull & Machinery Items Check Points• Ballast • No leakage, damage. tanks • Bulkheads (trans/longl.), longitudinals, transverse rings, horizontal girders, other members in good condition. No heavy corrosion, wastage, holes or cracks. • Access ladders, piping in good condition. No heavy wastage, holes
  53. 53. Hull & Machinery Items Check Points• Cargo • No leakage, damage. tanks • Bulkheads (trans/longl.), longitudinals, transverse rings, horizontal girders, other members in good condition. No heavy corrosion, wastage, holes or cracks. • Access ladders, piping in good condition. No heavy wastage, holes
  54. 54. Hull & Machinery Items Check Points• Fuel oil • No leakage, damage. tanks • Bulkheads (trans/longl.), longitudinals, transverse rings, horizontal girders, other members in good condition. No heavy corrosion, wastage, holes or cracks. • Access ladders, piping in good condition. No heavy wastage, holes
  55. 55. Hull & Machinery Items Check Points• Other compartments • Bulkheads (trans/longl.), (Bos‘n store, deck longitudinals, transverse stores, etc.) rings, horizontal girders, other members in good condition. No heavy corrosion, wastage, holes or cracks.
  56. 56. Hull & Machinery Items Check Points• Pump • Bulkheads, longitudinals, web frames, other members in good condition. No heavy room corrosion, wastage, holes or cracks. • Access ladders, piping in good condition. • No heavy wastage, holes. • Particular care to be taken to ensure electrical equipment in good order, lights (explosion proof). • Protection of cargo pump room (bilge alarm, gas monitoring system, temperature sensor, inter-lock system) working satisfactorily
  57. 57. Hull & Machinery Items Check Points• Water ingress alarm • Working satisfactorily• system
  58. 58. Hull & Machinery Items Check Points• Remote pump control • Working satisfactorily system (F.P.T, Bos’n store) (for Bulk Carrier)
  59. 59. Hull & Machinery Items Check Points• High velocity P/V • Working satisfactorily• valve • No sticking/clogging by solidifying • substances
  60. 60. Fire Fighting Appliances Item Check points• Fire integrity • Insulation on “A” class bulkheads and decks ingood condition. • Penetrations of ventilation ducts cable • penetration and pipes through “A” class bulk • heads and decks in good order.
  61. 61. Fire Fighting Appliances Item Check points• Fire doors • Operate satisfactorily. • Self-closing doors not to be fitted with hold-back hooks.• Skylights • Closing arrangements in good order • Skylights to be of steel and not contain glass panels.
  62. 62. Fire Fighting Appliances Item Check points• Fire dampers • Operate satisfactorily. • Cargo holds • Engine room • Accommodation spaces • Control stations • Other spaces • Clear marking of “Close- Open”. • No hole / defection of dampers
  63. 63. Fire Fighting Appliances Item Check points• Main fire pumps • Operate satisfactorily. • Proper pressure maintained. • Pressure gauges in good order
  64. 64. Fire Fighting Appliances Item Check points• Emergency fire pump • Operates satisfactorily. • Proper pressure maintained. • Pressure gauges in good order • Prime mover in good condition. • Exhaust gas piping in good order.
  65. 65. Fire Fighting Appliances Item Check points• Fire main piping • No leakage, heavy wastage in lines • No doublers, clamps, • soft patches in lines• Isolation valves • Operate satisfactorily.
  66. 66. Fire Fighting Appliances Item Check points• Hydrants • Fire hoses easily coupled to hydrants • Satisfactory operation of valves. • Valve handles not broken
  67. 67. Fire Fighting Appliances Item Check points• Fire hoses • All hoses in good condition, without leakage. • Checking the number of hoses acc. to the fire • control plan • Complete with nozzle and couplings
  68. 68. Fire Fighting Appliances Item Check points• Nozzles • All nozzles in good condition, without leakage. • Jet type nozzles, and jet/spray dual type in engine room. • Operation of easy change mode. • Operation of easy change mode and shut-off devices.
  69. 69. Fire Fighting Appliances Item Check points• Portable fire • Checking the number of portable fire extinguishers extinguishers of each type according to the fire foam, • control plan. dry power • Cylinders in good condition, CO2) without serious corrosion / damage. • Validity of the medium foam : one year dry powder : five year CO2 : measure at Class SS and IS
  70. 70. Fire Fighting Appliances Item Check points• Portable foam • Checking the air-foam nozzle,• applicator unit portable tank of foam making liquid, and one spare tank. Testing the connection to fire main by a fire hose. • Condition of stowage container in good order. • Validity of foam making liquid: four years (impossible to extend by sampling)
  71. 71. Fire Fighting Appliances Item Check points• Foam type fire • Visual condition in good extinguisher of 45 /135 order,without wastage. liters capacity or • Easily usable condition. equivalent in firing • Validity of the medium space of boiler and in Foam : one year spaces of fuel oil system dry powder : five years CO2 : measure at Class SS and IS
  72. 72. Fire Fighting Appliances Item Check points• Fixed fire extinguishing • CO2 or Halon cylinders to be level/ arrangement in E/R, weight measured at Class SS and IS. cargo spaces and cargo • Proper test certificate on board. pump room* • Validity of foam liquid (5 years).• (CO2 or Halon, foam,• water spray) After 5 years, effectiveness of foam liquid to be checked, and a sample test certificate available on board. • Testing the audible alarm for the release of gas (CO2 or Halon)
  73. 73. Fire Fighting Appliances Item Check points• Fire detection • Regular checking of the detection system and fire alarm.
  74. 74. Fire Fighting Appliances Item Check points• Fuel oil tank shut-off • All valves to be closed by valves; remote control from• Over 500L: ships built on outside of E/R. and after 1 July 1995 Satisfactory operation of• Over 1000L: ships built valves. before 1 July 1995 • In case that shut-off valves are operated by air, the air cylinder is always charged with correct pressure. • Pressure gauge in good condition.
  75. 75. Fire Fighting Appliances Item Check points• Emergency stop of • Satisfactory operation fans of emergency stop.• and fuel oil pumps in• Engine room
  76. 76. Fire Fighting Appliances Item Check points• Means of isolating the • Satisfactory operation• fuel supply to of means to isolate• individual engines the fuel supply
  77. 77. Fire Fighting Appliances Item Check points• Fireman‘s • Two(2) sets for cargo ships / Four(4) sets for tankers outfit • Stowage condition in good order according to the fire control plan. • Protective clothing, boots and gloves, helmet,electric safety lamp, axe. Easily usable condition. • Breathing apparatus with a smoke helmet or smoke mask and air pump, with proper length of air hose, or a self-contained breathing apparatus. • 200 % spare air cylinders available on board or 100 % + Air compressor. • A fireproof lifeline of sufficient length for each breathing apparatus with a snap hook. • Storage position is clearly marked.
  78. 78. Fire Fighting Appliances Item Check points• Fire extinguishing • Fire fighting system in good arrangement in order. paint lockers • (Type of arrangement is in accordance with the requirements of the flag state. e.g. portable fire extinguisher is acceptable for ships flying flag of Panama, Japan, etc.
  79. 79. Fire Fighting Appliances Item Check points• International • At least one (1) shore shore connection with standard connection flange dimensions available on board. • Four sets of bolts and nuts, each of 16 ㎜ in diameter, 50 ㎜ in length available on board. • One gasket packing available on board.
  80. 80. Fire Fighting Appliances Item Check points• Inert gas system • Operates satisfactorily. • Alarms in the control panel function properly.
  81. 81. Machinery in engine room Item Check Points• Main engines • Operate satisfactorily. • Safety devices function properly. • Remote control functions properly. • No leakage of oil / water • Jacketed High Press. FO pipes in good order • FO leak alarm in good order
  82. 82. Machinery in engine room Item Check Points• Generator • Operate satisfactorily. engines • Safety devices function properly. • Remote and automatic control functions properly. • No leakage of oil / water • Jacketed High Press. FO pipes in good order • FO leak alarm in good order
  83. 83. Machinery in engine room Item Check Points• Boilers • Operate satisfactorily. • Safety devices function properly. • Remote and automatic control function • properly. • Pressure gauges in good order, and calibration is made every year. • No leakage of steam / water / oil. • Water level gauges in good order.
  84. 84. Machinery in engine room Item Check Points• Stern Tube Seal • No leakage of oil / Sea water
  85. 85. Machinery in engine room Item Check Points• Essential • Operate satisfactorily. machinery • Safety devices function properly. • Remote and automatic control function properly. • No leakage from pump grand • Meters and gauges in good order.
  86. 86. Machinery in engine room Item Check Points• Piping • No heavy corrosion or leakage. • No soft patches / doublers / cement box • All valves operate satisfactorily.
  87. 87. Machinery in engine room Item Check Points• Bilge lines • Bilge pumps, pipings in good order. • Emerg. Bilge suction Valve operate satisfactorily
  88. 88. Machinery in engine room Item Check Points• Overall of • Cleanliness of E/R Engine Room Must be clean without rubbish or waste oil. • Guards and fencing Protection covers and/or guards • All Meters and Gauges • Self-closing device for sounding pipe of FO Tank • Means to prevent oil spay provided on flange / joint in oil piping • Insulation for all surfaces of machinery with high temp. above 220 deg. C
  89. 89. Machinery in engine room Item Check Points• Automatic Control • Engine Telegraph System • Alarm printer (UMS) • Engine Console • Extension alarm (UMS) • M/E operation from Bridge
  90. 90. Electrical system Item Check Points• Lighting in E/R • All lights in good order. • Protection covers or guards in good order.
  91. 91. Electrical system Item Check Points• Lighting in • All lights in good accommodation order. spaces • Protection covers or guards in good order.
  92. 92. Electrical system Item Check Points• Lighting in control • All lights in good• station, working room, order.• steering room and • Protection covers or other guards in good order.• spaces
  93. 93. Electrical system Item Check Points• Emergency cables • Condition in good order. • No exposed wire, heavy corrosion, especially • on weather deck.
  94. 94. Electrical system Item Check Points• Emergency lights • All lights in good order without damage.
  95. 95. Electrical system Item Check Points• Anti-explosion lights • All lights in good in order.• dangerous spaces, • No broken covers and• pump room, battery guards.• room, paint locker etc. • Tightening handles available on board.
  96. 96. Electrical system Item Check Points• Insulating mats • Insulating mats available around MSB on board or insulation cement permanently laid up on the floor.
  97. 97. Electrical system Item Check Points• Insulation resistance • No alarm of low insulation
  98. 98. Electrical system Item Check Points• Penetration in fire • Filling material in resisting divisions good order • (no clearance)
  99. 99. Mooring arrangements Item Check points• Anchor & chain • Condition in good order, no cables heavy wastage, missing components or damage. • Stowage condition in good order.
  100. 100. Mooring arrangements Item Check points• Windlass • Winches in good condition. • Brake bands in good condition, no abnormal wear. • Foundations, grating plates in good condition, no wastage, missing or broken sections.
  101. 101. Mooring arrangements Item Check points• Mooring • Winches in good condition. system • Brake bands in good condition, no abnormal wear. • Foundations, grating plates in good condition, no wastage, missing or broken sections. • Sufficient ropes available on board and in good condition. • Capstans operate satisfactorily.
  102. 102. Docking Survey01 Shell plating including keel plates, stem and stern frame(s) 02 Rudder(s) : Measurement Rudder Clearance 03 Sea inlets and overboard discharges and their valves below freeboard deck 04 Sealing devices for stern tube and shaft bracket bearing
  103. 103. Docking Survey05 After end of stern tube : Measurement Tail Shaft Clearance06 Propeller(s)07 Valves and cocks on shell plating, sea chests and distance pieces08 Anchors, anchor chain cables, ropes, hawse pipes, chain lockers and chain stoppers
  104. 104. Propeller Shaft Survey01 Connection part with propeller (including examination of shaft by efficient crack detection02 Propeller shaft except connection part with propeller03 Stern tube bearing04 Bearing wear down05 Shaft bearing clearance06 Open-up examination of sealing devices
  105. 105. Propeller Shaft Survey07 Propeller boss bore in way of shaft taper section08 Controllable Pitch Propeller (CPP)09 Water lubrication line10 Oil lubrication line including alarms, temperature measuring devices, L.O. pumps11 Lubrication oil record book
  106. 106. The End