Your SlideShare is downloading. ×
07 AASHTO Bridge Committee Awards Presentation
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Introducing the official SlideShare app

Stunning, full-screen experience for iPhone and Android

Text the download link to your phone

Standard text messaging rates apply

07 AASHTO Bridge Committee Awards Presentation

2,514
views

Published on

'07 Awards Presentation AASHTO Bridge Committee

'07 Awards Presentation AASHTO Bridge Committee

Published in: Technology

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
2,514
On Slideshare
0
From Embeds
0
Number of Embeds
4
Actions
Shares
0
Downloads
66
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Prize Bridges Awards Presentation World Steel Bridge Symposium New Orleans, Louisiana December 6, 2007 NSBA / AISC
  • 2. Prize Bridge Jury Matt Farrar, Idaho DOT Andrew Herrmann, Hardesty Hanover Thomas Lulay, CH2M Hill Myint Lwin, FHWA
  • 3. Major Span US-93 Burro Creek Canyon Bridge Northwest Arizona (between Phoenix & Las Vegas)
  • 4. • used innovative erection techniques, weathering steel, and classis arch design ... to produce a good looking structure • constructability issues were crucial ... construction mitigated environmental impacts • consideration given to construction and worker safety are an important aspect of design
  • 5. US-93 Burro Creek Canyon Bridge Designer - Arizona Department of Transportation Phoenix, AZ Shafi Hasan Fabricator - PDM Bridge Detailer – Tensor Engineering Erector – Traylor Brothers
  • 6. Long Span Raccoon Creek Bridge Pike County, Kentucky
  • 7. • wise use of constructability & fabrication input early in the design phase …a beautiful example of a quality design, fabrication and construction effort • impressive high steel tubs with innovative ‘angel wing’ erection technique • aesthetically superior … constructability issues well thought out …pleasing span to depth ratio and symmetry
  • 8. Raccoon Creek Bridge Designer - Palmer Engineering Winchester, KY Brad Robson Fabricator – High Steel Structures Detailer – Tensor Engineering Erector – Bush & Burchett
  • 9. Medium Span I-94 Modified Tied Arch Bridge Taylor, Michigan
  • 10. • the steel design addressed numerous constraints & challenges at this location … an artistic solution • good appearance with pressurized box for arch to minimize corrosion • several innovative solutions. slender and aesthetic with complex details in context sensitive format
  • 11. I-94 Modified Tied Arch Bridge Designer – Alfred Benesch & Company Lansing, MI Muthia Kasi Ihab Darwish Fabricator - PDM Bridge Detailer – CanDraft, Inc. Erector – Whaley Steel Construction
  • 12. Short Span US-36 over Box Elder Creek Watkins, Colorado
  • 13. • innovative use of rolled shapes offers competitive choices to designers for short span bridges • good example of steel’s viability over concrete … simple, clean, with easy construction • aesthetically pleasing … innovative continuity connection …simple details, constructible, economical alternate to prestress concrete • standardization and keeping details simple are the keys to make steel sections competitive
  • 14. US-36 over Box Elder Creek Designer – Colorado Department of Transportation Denver, CO Teddy Meshesha Fabricator – Big R Manufacturing Detailer – Big R Manufacturing Erector – Structures, Inc.
  • 15. Movable Span Intracoastal Waterway Bridge Louisa, Louisiana
  • 16. • use of steel counterweight was requested by citizens and solved by the design team • clean appearance with counterweights hidden between approach span girders • minimizing counterweight resulted in a pleasing look ... haunch on approach spans complimented lift span ... good symmetry • good use of steel to push the state of the practice.
  • 17. Intracoastal Waterway Bridge Designer – HNTB Corporation Baton Rouge, LA Rudy McLellan Fabricator – Steward Machine Detailer – Steward Machine Erector – Huval & Associates
  • 18. Special Purpose Highland Bridge Denver, Colorado
  • 19. • the design & construction teams worked well to insure this complex bridge was constructible over traffic • innovative triple arch truss … complicated erection to achieve success • structure seems to rise and fly over the interstate … good use of steel to make a remarkable bridge • the sweeping view of the triple rib steel arch provides a pride of the community … prefabricated segments facilitate the construction
  • 20. Highland Bridge Designer – Jacobs Carter Burgess Denver, CO Jeff Mehle Fabricator – King Fabrication Detailer – King Fabrication Erector – Harmon Constructors
  • 21. Reconstructed St. Johns Bridge Portland, Oregon
  • 22. • design effort paid good attention to detail … historic reconstruction to meet current loads and to resist NorthWest climate impacts • historic preservation of Steinman suspension system • admirable project to rehabilitate and preserve an historic landmark • great restoration of a historic suspension bridge to meet current seismic and traffic needs
  • 23. St. Johns Bridge Designer – OBEC Consulting Engineers Jim Bollman Oregon DOT Frank Nelson Fabricator – Hogan Fabrication Detailer – Hogan Fabrication Erector – Max J. Kuney Construction
  • 24. Prize Bridges CONGRATULATIONS TO ALL NSBA / AISC