TM for iGCDP
iGCDP | Tier 4
Tier 1 MC Tier 3 MC Tier 4 MC
organic and balanced
growth
Tier 2 MC
organic and balanced
growth
These tiers must focus, fo...
The iGCDP OD Model for tier 3
What is the current
state?
Entity
AFGHANISTAN
ALBANIA
ALGERIA
ARMENIA
AUSTRALIA
AUSTRIA
AZERBAIJAN
BARBADOS
BELARUS
BELGIUM
BOLIVIA
BOSNIA - HERZEGOV...
25 RE
Most LCs do between
0-15 Re in this tier –
All LCs are tier 4 LCs
LCs in Tier 4 iGCDP overview
What we are aiming for?
Entities that are focused on
iGCDP in this tier ensure
ALL their LCs jump from a
scale of 0-25 to ...
What is this about?
• Pick focus LCs for iGCDP growth in your entity
• Using HR Intelligence to grow
• Building Capacity f...
How can you take
advantage of it?
Let’s GO!
1.Pick focus
LCs for iGCDP
growth
25 RE
Most LCs do between
0-15 Re in this tier –
All LCs are tier 4 LCs
LCs in Tier 4 iGCDP overview
Most entities in this...
Go through the OD Toolkit for tier 3 and tier 4!
2. Using HR Intelligence to grow in
iGCDP
Why does information help?
Example of this
EVERY LC within the MC/Entity needs to
increase its productivity, the question is
HOW?
An increase in productivity is POSS...
REMEMBER: The FINAL
KPI you are measuring is
PRODUCTIVITY, however
you need other KPIs that
are based on your specific
cha...
REMEMBER: The FINAL
KPI you are measuring is
PRODUCTIVITY, however
you need other KPIs that
are based on your specific
cha...
How do I measure
productivity?
You can measure productivity at raise,
match and realize stage!
• Productivity at RAISE = Number of members working for ra...
Generally, team structures
in iGCDP involve the same
people/number of people
working for raise, match
and realize – even s...
Productivity at realize is most
accurate but we measure
productivity at raise and
match only to check the
progress and alw...
Intelligence can help to
drive increase in
productivity?% of people in iGCDP
and % of people in
Support Functions
Time a n...
3. Planning and Building CAPACITY
based on challenge identification,
Exchange flow and OD Model of your
entity
Use TM Planning Tool to Plan for iGCDP
1. Number of Members
in iGCDP and support
functions
2. Number of TMP and
TLP Experi...
TM Planning tool download
http://www.myaiesec.net/content/viewwiki.do?conten
tid=10299749
After planning for capacity you can have any one of these 3 outcomes
1. I do not have enough
Members in any
programme/func...
Run an OPTIMIZED recruitment– 2 weeks!!
1. I do not have
enough Members in
any
programme/function
Tips to run an optimized recruitment
1. Clear and focused Promotion of Job
description
Example: Selling the global interns...
Determine who is the right
member
Skill AttitudeBackground Interest Time
Timeline
Approach existing
sign ups for TXP
and GCDP
Rejected
applicants from
last recruitment
Optimized
Selection
1 week ...
Optimize
d
Selectio
n
Value based recruitmen
 Committed and motivated members ( GIP needs
commitment and persistence)
 B...
Value based recruitment
http://www.myaiesec.net/content/viewwiki.do?
contentid=10299749
2. We have enough
members in iGCDP
and support areas
Focus on increasing productivity through L&D and
team minimums
3. We have the right
number of members in
the LC/MC but not
allocated in the right
proportion across
programmes/functions
...
Structures for…
0-25 Re 25-100 Re
FIN JD in iGCDP
TM JD in iGCDP
MKT JD in iGCDP
iGCDP Coordination JD
Project Structure
LC
VPiGCDP
OCP
OCP
OCP
VPFIN VPTM V...
Beginner LC
VP
Member Member Member
(0-25 Re)
∞
Ra-Ma-Re Inner & Outer
Journey Delivery
Note!
∞
Basic Consideration:
• As start up, LC manage the basic
process of iGCDP delivery
• There is no need to manage iGCDP
as a ...
Back Office Supports
TM Member L&D;
Sales Development Program
Finance Project Financial Model
Marketing &
Communication
Pr...
VP
TL TL TL
∞
Ra-Ma-Re
∞
Ra-Ma-Re
∞
Ra-Ma-Re
IntermediateLC (25-100 Re)
VP
TL TL TL
∞
Ra-Ma-Re
∞
Ra-Ma-Re
∞
Ra-Ma-Re
Basic Consideration:
• LCs have more capacity in project management
• Project...
Back Office Supports
TM Member profiling
Member Learning & Development
Sales Development Program
Finance Project financial...
4. Learning
and
Developmen
USE TM Planning tool
How do I
plan?
FOCUS ON EDUCATION TO DRIVE RESULTS
How can
i achieve
this?
1.
Create a specific
iGCDP education
cycle
2.
Ensure the educa...
iGCDP
All Levels
TOPIC CONTENT OBJECTIVES TARGET
PRODUCT
KNOWLEDGE
 Relevance of the product in the
society
 What is a product and produc...
All levels
TOPIC CONTENT OBJECTIVES TARGET
ISSUE-BASED
SEGMENTATION
 Why and how of issue
segmentation for GCDP in
AIESEC...
iGCDPIntermediate (LCs doing between 25
TOPIC CONTENT OBJECTIVES TARGET
NATIONAL
PROJECTS
 Product knowledge of national projects
 The responsibility of making ...
HANDY TIPS
1. Make Virtual learning
effective and fun –
Ensure continuity and
consistency
2. Have practical
tasks/assignme...
How to Measure this?
TMP Retention rate
(for new members and
existing team
members
Increase in
Performance over a
period o...
A lever to support our
ambitions for iGCDP Grow iGCDP Raises
we need to have a
lever big and strong
enough to support
our ...
Sales Development for iGCDP
Golden
Rule
70%PRODUCT & PROCESS
KNOWLEDGE
30%SALES KNOWLEDGE
TG C M
RA
Goal
Sales
Negotiation
Meeting Goal
Sales Meeting
Goal
Cold Calling
Goal
Cold Leads
Goal
how much time does this...
How?
tg c m
RA
Goal
Sales
Negotiation
Meeting Goal
Sales Meeting
Goal
Cold Calling
Goal
Cold Leads
Goal
how much time does...
sdp for igCDP how
?
c m
This is where you make your sales development program framework with
the key message and best chan...
A tracker system
Education
Framework/ timelineCustomize as per
your sales reality
and OD Model!
what is sdp made of?
Conte...
Education
framework
and timeline
Ensure education is plotted on a timeline ALIGNED TO PEAKS
link all training to relevant
...
Education
framework and
timeline
Right Target/Profile
Right Content
Right Delivery/Channel
Right Timeline
Right KPI and Me...
View sample tracking system
and Sample sales conference
Agenda on spreadsheets below
Though there is a sample tracker, what makes
most sense is to embed even SDP tracking into
team minimums tracking (by focu...
5. Implemen
Team minimu
Team Minimums
Team
Plan
JD
Training
Tracking & Coaching
Evaluation Standard and sense
Reason
Direction
Contribution
Tool
P...
The team minimums are the basis of
EVERYTHING YOU DO IN YOUR ENTITY!
• Team Minimums help an LC in capacity planning and i...
Team minimums are a tool for TEAM
MANAGEMENT and not something that
is implemented by an MCVP TM or an
MCVP OD! OR AN LCVP...
HOW DO I
TRACK THESE?
Example of how to track team minimums
MC Team should start
implementing team
minimums with LCVPs!!
ole of MC! FOCUS ON LCs doing
between 0-25
GROWING IN iGCDP!!!
ole of MC!
• Support Planning process - Plan for number of
members needed through TM Planning tool
• Take action based on ...
Build capacity and education - iGCDP Tier 4
Build capacity and education - iGCDP Tier 4
Build capacity and education - iGCDP Tier 4
Build capacity and education - iGCDP Tier 4
Build capacity and education - iGCDP Tier 4
Build capacity and education - iGCDP Tier 4
Build capacity and education - iGCDP Tier 4
Upcoming SlideShare
Loading in...5
×

Build capacity and education - iGCDP Tier 4

459

Published on

0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
459
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
44
Comments
0
Likes
1
Embeds 0
No embeds

No notes for slide
  • Add link to the TMP Recruitment
  • Add link to the TMP Recruitment
  • They have already seen this. However just give one example of how this can work with oGIP. Just very quicky to recap (don’t go into much detail)
  • Build capacity and education - iGCDP Tier 4

    1. 1. TM for iGCDP iGCDP | Tier 4
    2. 2. Tier 1 MC Tier 3 MC Tier 4 MC organic and balanced growth Tier 2 MC organic and balanced growth These tiers must focus, for Tier 1 and 2 the focus should be on organic and balanced growth (particularly balancing focus with GIP). For Tier 3 and 4 it’s about jumping in GCDP. What does this mean?
    3. 3. The iGCDP OD Model for tier 3
    4. 4. What is the current state?
    5. 5. Entity AFGHANISTAN ALBANIA ALGERIA ARMENIA AUSTRALIA AUSTRIA AZERBAIJAN BARBADOS BELARUS BELGIUM BOLIVIA BOSNIA - HERZEGOVINA BOTSWANA BURKINA FASO CANADA CAPE VERDE CHILE COSTA RICA CROATIA DENMARK DOMINICAN REPUBLIC ECUADOR EL SALVADOR ESTONIA FINLAND FRANCE GABON GEORGIA GERMANY GUATEMALA HONG KONG ICELAND IRAN IRELAND JAPAN JORDAN KAZAKHSTAN KUWAIT KYRGYZSTAN LAOS LATVIA LIBERIA LUXEMBOURG MALTA MOLDOVA MONGOLIA MONTENEGRO NAMIBIA NEPAL NEW ZEALAND NICARAGUA NIGERIA NORWAY OMAN PANAMA PARAGUAY PUERTO RICO QATAR REPUBLIC OF MACEDONIA RWANDA SENEGAL SINGAPORE SLOVENIA SPAIN SWEDEN SWITZERLAND TAJIKISTAN THE NETHERLANDS UNITED ARAB EMIRATES UNITED KINGDOM UNITED STATES URUGUAY Entities in Tier 4 iGCDP - 72
    6. 6. 25 RE Most LCs do between 0-15 Re in this tier – All LCs are tier 4 LCs LCs in Tier 4 iGCDP overview
    7. 7. What we are aiming for? Entities that are focused on iGCDP in this tier ensure ALL their LCs jump from a scale of 0-25 to 25-100 The key driver for this is planning for TM driving iGCDP, structures, L&D, building sales intensity and implementing team minimums!!
    8. 8. What is this about? • Pick focus LCs for iGCDP growth in your entity • Using HR Intelligence to grow • Building Capacity for iGCDP • Learning and Development for iGCDP • Team Minimums implementation for iGCDP • Role of MC
    9. 9. How can you take advantage of it? Let’s GO!
    10. 10. 1.Pick focus LCs for iGCDP growth
    11. 11. 25 RE Most LCs do between 0-15 Re in this tier – All LCs are tier 4 LCs LCs in Tier 4 iGCDP overview Most entities in this tier have between 1 -10 LCs (A lot of entities below 5 LCs)
    12. 12. Go through the OD Toolkit for tier 3 and tier 4!
    13. 13. 2. Using HR Intelligence to grow in iGCDP
    14. 14. Why does information help?
    15. 15. Example of this
    16. 16. EVERY LC within the MC/Entity needs to increase its productivity, the question is HOW? An increase in productivity is POSSIBLE by IDENTIFYING what is your challenge! Examples: 1. If new members/TMP Participants leave the organization within 1-2 weeks of the role starting, focus on INCREASE in TMP Retention Rate can increase productivity 1. If you do not know which level of membership is achieving or not achieving results, team minimums implementation to manage performance will allow you to see which level is contributing most to performance and allow you to focus on this segment or the segment that is not performing to increase productivity
    17. 17. REMEMBER: The FINAL KPI you are measuring is PRODUCTIVITY, however you need other KPIs that are based on your specific challenges to indicate this increase in productivity!
    18. 18. REMEMBER: The FINAL KPI you are measuring is PRODUCTIVITY, however you need other KPIs that are based on your specific challenges to indicate this increase in productivity!
    19. 19. How do I measure productivity?
    20. 20. You can measure productivity at raise, match and realize stage! • Productivity at RAISE = Number of members working for raise in iGCDP (in front office and back office)/ Number of Raises (In the specific time period) • Productivity at MATCH = Number of members working for match in iGCDP (in front office and back office)/Number of matched (In the specific time period) • Productivity at REALIZE = Total number of members working in iGCDP (front office and back office)/Number of realizations in iGCDP (In the specific time period)
    21. 21. Generally, team structures in iGCDP involve the same people/number of people working for raise, match and realize – even so since iGCDP runs in peaks it makes sense to measure productivity through the peaks
    22. 22. Productivity at realize is most accurate but we measure productivity at raise and match only to check the progress and always establish the connection between TM/OD and programme growth!
    23. 23. Intelligence can help to drive increase in productivity?% of people in iGCDP and % of people in Support Functions Time a new member or new team leader takes to start performing Applicants to iGCDP TLP positions TMP Retention Rate
    24. 24. 3. Planning and Building CAPACITY based on challenge identification, Exchange flow and OD Model of your entity
    25. 25. Use TM Planning Tool to Plan for iGCDP 1. Number of Members in iGCDP and support functions 2. Number of TMP and TLP Experiences in iGCDP and support functions
    26. 26. TM Planning tool download http://www.myaiesec.net/content/viewwiki.do?conten tid=10299749
    27. 27. After planning for capacity you can have any one of these 3 outcomes 1. I do not have enough Members in any programme/function 2. We have enough members in iGCDP and support areas 3. We have the right number of members in the LC/MC but not allocated in the right proportion across programmes/functions
    28. 28. Run an OPTIMIZED recruitment– 2 weeks!! 1. I do not have enough Members in any programme/function
    29. 29. Tips to run an optimized recruitment 1. Clear and focused Promotion of Job description Example: Selling the global internship programme to language institutes 2. Specific people responsible for the recruitment 3. Online promotion and Offline promotion ONLY in specific universities 4. Selection based on Interests and Values (striving for excellence, pro active learner etc.) over only skills for the role 5. When Promotion is on-going through the year, an optimized recruitment becomes simpler since LC/MC already has a pool of applicants
    30. 30. Determine who is the right member Skill AttitudeBackground Interest Time
    31. 31. Timeline Approach existing sign ups for TXP and GCDP Rejected applicants from last recruitment Optimized Selection 1 week 5 days
    32. 32. Optimize d Selectio n Value based recruitmen  Committed and motivated members ( GIP needs commitment and persistence)  Building
    33. 33. Value based recruitment http://www.myaiesec.net/content/viewwiki.do? contentid=10299749
    34. 34. 2. We have enough members in iGCDP and support areas Focus on increasing productivity through L&D and team minimums
    35. 35. 3. We have the right number of members in the LC/MC but not allocated in the right proportion across programmes/functions In many cases there is enough capacity in iGCDP and members need to be re-allocated so even the GIP programmes have the right capacity!
    36. 36. Structures for… 0-25 Re 25-100 Re
    37. 37. FIN JD in iGCDP TM JD in iGCDP MKT JD in iGCDP iGCDP Coordination JD Project Structure LC VPiGCDP OCP OCP OCP VPFIN VPTM VPMKT Do Ra-Ma-Re!! Note! For ALL levels!
    38. 38. Beginner LC VP Member Member Member (0-25 Re) ∞ Ra-Ma-Re Inner & Outer Journey Delivery Note! ∞
    39. 39. Basic Consideration: • As start up, LC manage the basic process of iGCDP delivery • There is no need to manage iGCDP as a project yet - in general experience delivery will be TN based • Member Efficiency: 0-4 X / member Number of members: 3-4 Job Description: • Selling and raising, matching, and realizing • Incoming preparation seminar • Experience Co-delivery VP Member Member Member ∞ Ra-Ma-Re BeginnerLC (0-25 Re)
    40. 40. Back Office Supports TM Member L&D; Sales Development Program Finance Project Financial Model Marketing & Communication Project packaging, Project showcasing; ER External Resources integration(new Partners) VP Member Member Member ∞ Ra-Ma-Re BeginnerLC (0-25Re)
    41. 41. VP TL TL TL ∞ Ra-Ma-Re ∞ Ra-Ma-Re ∞ Ra-Ma-Re IntermediateLC (25-100 Re)
    42. 42. VP TL TL TL ∞ Ra-Ma-Re ∞ Ra-Ma-Re ∞ Ra-Ma-Re Basic Consideration: • LCs have more capacity in project management • Project concept will be centralized Nationally (National project implementation in LCs) • Start to have the needs of event/project management • Member Efficiency: 3-4 X /member Number of members: Depends on TM Planning Job Description: • Selling and raising, matching, and realizing • Project concept development and execution • Incoming preparation seminar • Experience Co-delivery (country-country partnership management) IntermediateLC (25-100 Re)
    43. 43. Back Office Supports TM Member profiling Member Learning & Development Sales Development Program Finance Project financial model Member development investment Marketing & Communication National brand alignment Showcasing EwA Public Relations Management ER External resources integration Partner engagement VP OCP OCP OCP ∞ Ra-Ma-Re ∞ Ra-Ma-Re ∞ Ra-Ma-Re IntermediateLC (25-100Re)
    44. 44. 4. Learning and Developmen
    45. 45. USE TM Planning tool How do I plan?
    46. 46. FOCUS ON EDUCATION TO DRIVE RESULTS How can i achieve this? 1. Create a specific iGCDP education cycle 2. Ensure the education for potential and high potential is making membership productive and able to raise and match simultaneously. 3. For start up LCs focus on raising education and for one sub-product. 4. Track length of time for membership to perform – IMPORTANT! 5. Ensure strong organizational and operational induction into AIESEC for contribution to summer
    47. 47. iGCDP All Levels
    48. 48. TOPIC CONTENT OBJECTIVES TARGET PRODUCT KNOWLEDGE  Relevance of the product in the society  What is a product and product life cycle  Know the elements of products (price, brand, quality, value, customer segments, etc.) and the different stages of products  Understand the exchange process from Calls until Completed  Know how to use all the functions on myaiesec.net for exchange management to make the process fast and effective Members, Leaders, VPs EXCHANGE PROCESSES  Exchange process flow and yearly timeline (product customer flow)  Exchange Management on the GIS SUPPLY & DEMAND MANAGEMENT  Supply and demand theory and necessity  Exchange management on the GIS INNER&OUTER JOURNEY  Why and how and what of inner and outer journey in AIESEC  Delivery of I&O journey to our customers  Understand how AIESEC develops leadership through I&O journey and know how to support our customers to go through an intense I&O journey CUSTOMER EXPERIENCE MANAGEMENT  Why, how and what of CEM?  Co-delivery  Information system management for better customer service  Understand the importance of customer experience management and know how to use the resources (data, partners) we have to create strategies for All levelsiGCDP
    49. 49. All levels TOPIC CONTENT OBJECTIVES TARGET ISSUE-BASED SEGMENTATION  Why and how of issue segmentation for GCDP in AIESEC  Changes in product and process management in the LC  Understand why issue segmentation was created and how to work with this model in the LC (changes in processes, product development, structures) Leaders & VPs CROSS- CULTURAL COMMUNICATION  Hofstede’s cultural dimensions  Behaviours and attitude needed for effective cross- cultural communication  Understand the 5 cultural dimensions of Hofstede and how to adapt communication based on that Members, Leaders, VPs CUSTOMER LOYALTY FOR STUDENTS  Building a customer relationship with trainees  Minimums of project delivery  How to satisfy our customers  Understand the standards and extra deliveries in iGCDP projects in order to have promoters and develop leadership Leaders & VPs SALES TRAINING  Basic sales knowledge and techniques  Practice sales of our products  Understand the process of sales and know how to deliver a full selling cycle Members, Leaders, VPs iGCDP
    50. 50. iGCDPIntermediate (LCs doing between 25
    51. 51. TOPIC CONTENT OBJECTIVES TARGET NATIONAL PROJECTS  Product knowledge of national projects  The responsibility of making national projects  Devision of responsibilities and roles between MC and LC and the rules of communication  Value of national partners & projects  Understanding what is the national project, how to operate with MC and feel responsible and commited to national projects. Leaders & VPs PROJECT MANAGEMENT  Definition and characterisitics of a project.  Process in project management  Goals achievement  Resource management  Understand how to build your project and the processes inside, manage effecively resources to achieve the goals. Leaders & VPs COUNTRY-TO- COUNTRY PARTNERSHIPS  What is CY2CY partnership  Value of CY2CY partnership  Responsibilities in partnerships  Main processes in cooperation management  Understand the processes in CY2CY partnerships, responsibility towards delivering the XPs on LC levels and clear WHY of working by CY2CY VPs SHOWCASING & PROMOTERS  What is showcasing and promoters stories usage  How to brand promoters stories and showcase them  Showcasing channels and partnerships  Understand how to showcase the srories of promoters for getting more customers Leaders & VPs INTERMEDIATEiGCDP
    52. 52. HANDY TIPS 1. Make Virtual learning effective and fun – Ensure continuity and consistency 2. Have practical tasks/assignments at the end of every virtual session CONTINUITY AND CONSISTENCY PRACTICAL 3. Create virtual trainings aligned to your exchange flow and exchange timeline Exchange timeline 4. Ensure there is customised content for specific LCs and specific profiles within LCs. (customize to your OD Model) CUSTOMISED
    53. 53. How to Measure this? TMP Retention rate (for new members and existing team members Increase in Performance over a period of time Time to start performing Eg: from 1 month to 1 week – for new members and team leaders Increase in Performance over a period of time
    54. 54. A lever to support our ambitions for iGCDP Grow iGCDP Raises we need to have a lever big and strong enough to support our iGCDP ambitions :) sdp for igCDP why ? Using the Sales Development Program a education and tracking tool to increase the sales capacity and intensity of iGCDP members
    55. 55. Sales Development for iGCDP Golden Rule 70%PRODUCT & PROCESS KNOWLEDGE 30%SALES KNOWLEDGE
    56. 56. TG C M RA Goal Sales Negotiation Meeting Goal Sales Meeting Goal Cold Calling Goal Cold Leads Goal how much time does this process take? Define what you want to achieve in iGCDP and when so that your SDP can be tailored to your sales needs. Sales Development for iGCDP
    57. 57. How? tg c m RA Goal Sales Negotiation Meeting Goal Sales Meeting Goal Cold Calling Goal Cold Leads Goal how much time does this process take? Who is going to achieve this? This will define the key target for your SDP. eg. I’m going to target iGCDP Sales-Raising TMP
    58. 58. sdp for igCDP how ? c m This is where you make your sales development program framework with the key message and best channels to connect to your target audience! :D
    59. 59. A tracker system Education Framework/ timelineCustomize as per your sales reality and OD Model! what is sdp made of? Content and Delivery Sales Conference if needed
    60. 60. Education framework and timeline Ensure education is plotted on a timeline ALIGNED TO PEAKS link all training to relevant team and individual activity happening at the time (link content to push for Peak) each class must have clear KPIs and output that are tracked by the LCVP and MCVP responsibles Ensure the local TM can leverage off SDP by time lining their activity too.
    61. 61. Education framework and timeline Right Target/Profile Right Content Right Delivery/Channel Right Timeline Right KPI and Measurement Ensure that SDP content is tailored for LC scale: - 0-25 - 25-100 - 100-200
    62. 62. View sample tracking system and Sample sales conference Agenda on spreadsheets below
    63. 63. Though there is a sample tracker, what makes most sense is to embed even SDP tracking into team minimums tracking (by focusing on tracking sales teams)
    64. 64. 5. Implemen Team minimu
    65. 65. Team Minimums Team Plan JD Training Tracking & Coaching Evaluation Standard and sense Reason Direction Contribution Tool Performance
    66. 66. The team minimums are the basis of EVERYTHING YOU DO IN YOUR ENTITY! • Team Minimums help an LC in capacity planning and implementation (and makes it simpler for MC to track) • Team Minimums allows an MC to create the right education cycle for the entity and an LC to customize education for every function in the right way • Team Minimums help in Performance Management (Because every team needs to have a JD, MoS, Plan and this needs to be tracked which means performance management in the entity can be structures) • Team minimums help the MC to have the right information to identify what is going well and what are the challenges and how can this lead to increasing productivity!
    67. 67. Team minimums are a tool for TEAM MANAGEMENT and not something that is implemented by an MCVP TM or an MCVP OD! OR AN LCVP TM! Every MCVP and LCVP is using these to lead, manage and track their teams!
    68. 68. HOW DO I TRACK THESE?
    69. 69. Example of how to track team minimums
    70. 70. MC Team should start implementing team minimums with LCVPs!!
    71. 71. ole of MC! FOCUS ON LCs doing between 0-25 GROWING IN iGCDP!!!
    72. 72. ole of MC! • Support Planning process - Plan for number of members needed through TM Planning tool • Take action based on your current reality and recruit into the right structures • Create a specific Learning and Development cycle (embed SDP and Supply and Demand into this) • Implement Team Minimums (not just the MCVP TM, all MCVPs need to do this)
    1. A particular slide catching your eye?

      Clipping is a handy way to collect important slides you want to go back to later.

    ×