Your SlideShare is downloading. ×
Massood Eftekhari Outlook 2012 2 of 2
Massood Eftekhari Outlook 2012 2 of 2
Massood Eftekhari Outlook 2012 2 of 2
Massood Eftekhari Outlook 2012 2 of 2
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Massood Eftekhari Outlook 2012 2 of 2

552

Published on

Massood Eftekharis Presentation 2 of 2 at Outlook 2012

Massood Eftekharis Presentation 2 of 2 at Outlook 2012

Published in: Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
552
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
11
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. County of Los Angeles - Department of Public Works Construction Division ; COR~I~~ l~,~, FQ~~ ~ ~. C ,~~~~, f ~~ +~GN I Y Y r ` t- b T L ~, ~. ~ 4 ~ ~h~ . ~ ~ ~ ,hail:+`~~ "~ .:~ ~ ~~ RDC0015463 Buelah Circle Drainage Improvements 02(21112 03120112 TSM0010049 San Gabriel Boulevard - Sierra Madre 02121/12 03120112 Boulevard TSSP FCC0001209 Alamitos Bay & Claretta Drain Pump 03/06/12 04110112 Station Upgrades includes: 1) Alamitos Bay Pump Station 2) Claretta Drain Pump Station SMDAC00132 Calabasas Sewer Upgrade 03106/12 04103/12 AAA RDC0015526 Holliston Avenue, et al. 03106112 04103112 RDC0015500 Mulholland HighwaylNewton Canyon 03/06112 04103112 Road, et al. includes: (RDC0014070) 1. Mulholland Highway at C.M. 15.47, et al. (RDC0014798) 2. Newton Canyon Road, et al. SLT0000004 Workman Mill Road Between Valley 03106112 04103112 Blvd &San Jose Creek RDC0015137 Admiralty Way at Palawan Way, et al. 3113/12 04110/12 Pending MDR Ph - II Waterline Schedule FCC0001198 Alamitos Barrier Project New 03120112 04117112 Observation Wells RDC0014151 Slauson Avenue - Compton 03120/12 04117112 Start construction after AvenuelAlameda Street completion of Randolph St. (RDC0014410)
  • 2. LOS ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS CAPITAL PROJECTS ESTIMATED ADVERTISING PROJECT DESCRIPTION LOCATION COST DATE Fire Station 69 Septic Tank The proposed new septic system will replace the Topanga, CA $360,000 Jan-12 Replacement existing failing system which will cAnsist of a 1,500- gallon main processing tank, filter pods, a distribution box, and three seepage pits. Manhattan Beach Library The project consists of demolition of a 12,118 Manhattan Beach $14,500,000 Jan-12 square-feet existing library and the construction of a CA 21,500 square-feet library facility on the same site. The project will be designed and built to LEED Gold Certification level. OVMC Can Sterilizer Bldg The building is a single story concrete masonry Sylmar, CA $187,500 Jan-12 Replacement block, 800 square feet in area, with steel sash windows, steel door frames and composition shingled roof. Bald Mountain New The project will consist of aself-supporting steel Gorman, CA $682,000 Feb-12 CommunicationTower lattice communications antenna tower that will be 150 feet in height and will be equipped with all the necessary mounts and accessories. Barton Fuel System The scope of work is to remove and replace six Pacoima, CA $1,988,800 Feb-12 Refurbishment fueling locations and all piping from existing underground tank, add a seventh fueling location, add a 10,000 gallon above ground fuel tank, add two canopies and new fuel pumps, and remove and replace two existing 500 gallon waste oil tanks. Upgrade all electrical components and add a new electrical service. Hauser Peak New Tower The project will consist of aself-supporting steel Palmdale, CA $682,000 Feb-12 lattice communications antenna tower that will be 150 feet in height and will be equipped with all the necessary mounts and accessories. KH Eastern Ridgeline Project LANDSCAPE: The project is located within the Baldwin Hills, CA $1,460,000 Feb-12 Kenneth Hahn State Recreational Area. The project proposes to construct four fitness areas along a proposed and approximate 1l2 mile nature walking trail. Puente Hls New Communication The project will consist of one communications Rowland Heights, $1,656,000 Feb-12 Tower building (approximately 422 square feet), one CA equipment building (approximately 999 square feet), and aself-supporting steel lattice communications antenna tower that will be 150 feet in height and will be equipped with all the necessary mounts and accessories. Rio Hondo New Communication The project will consist of a communications building Whittier, CA $1,483,500 Feb-12 Tower (approximately 999 square feet) and a self- supporting steel lattice communications antenna tower that will be 150 feet in height and will be equipped with all the necessary mounts and accessories. Santa Monica Canyon Rubber The Santa Monica Canyon Channel Rubber Dam Santa Monica $1,007,500 Feb-12 Dam Project will use an inflatable rubber dam installed in Canyon Channel the Santa Monica Channel to divert winter low water flows to the City of L. A.s water treatment plant.01/12/2012 Page 1 of 3
  • 3. LOS ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS CAPITAL PROJECTS ESTIMATED ADVERTISING PROJECT DESCRIPTION LQCATION COST DATE. Lennox Library and Community The project will renovate the 3,000-square-foot Inglewood, CA $4,410,000 Mar-12 Center existing library, construct a new 5,400-square-foot addition to the library, and renovate the remaining 11,000 square feet for a community center. OVMC Child Care The project scope involves the design and re- Sylmar, CA $2,909,500 Apr-12 construction of approximately 5,200 sf. Day Care Facility within the Olive View Medical Center Campus. Eastern Ave Hill and Blanchard This project consists of addressing the slope erosion Los Angeles, CA $14,066,000 May-12 Slope and storm water drainage issues on the Eastern Avenue Hill including the temporary repairs to be implemented at the Blanchard East Slope erosion. Los Angeles River Headwaters The proposed project consists of design and Canoga Park, CA $6,700,000 Jun-12 construction of a trail path along both side of the Los Angeles River from the confluence of Bell Creek and Calabasas Creek to the confluence of Los Angeles River and Browns Creek. The project includes landscaping, interpretive signage, decorative fencing, and a pedestrian bridge across Browns Creek. Los Angeles River-North The proposed project consists of construction of a Studio City/Sherman $1,824,100 Jun-12 Valleyheart pedestrian trail along north sides of the Los Angeles Oaks, CA River adjacent to Valleyheart Drive between Fulton and Coldwater Canyon Avenues. Will Rogers Coastline Pkg Proposed improvements consist of reconstruction Malibu, CA $6,700,000 Jun-12 LoWiew and reinforcement of the existing eroding asphalt concrete parking lot adjacent to the beach bluff with a new 15ft high and approx. 600 LF Seawall to stabilize the slope. Also to be constructed will be a new concrete view deck on a pile foundation system with an accessible pedestrian walkway to the beach, landscaping and irrigation improvements. Camp Glenn Rockey - Modular Procure and install one (1) new modular living San Dimas, CA $629,000 Aug-12 Unit quarter (3,600 sq. ft.). Develop site (i.e., ADA compliant path of travel, utilities POC, etc.) as required for the use of new modular living quarter. Oxford Retention Basin Project This project is to improve the capacity and water Marina Del Rey, CA $8,800,000 Aug-12 quality in the O~ord Retention Basin by dredging the basin and adding a berm in the basin to recirculate water. County Data Center The project consists of constructing a new data Downey, CA $110,000,000 Sep-12 center for the County of Los Angeles. The facility will include approximately 30,000 square feet of raised floor data center. Atwo-story, 27,000 square foot annex building with two floors of underground parking will also be constructed. The facility is an essential facility, and as such, all main and support services must be designed and constructed to provide continuous service.01/12/2012 Page 2 of 3
  • 4. LOS ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS CAPITAL PROJECTS ESTIMATED ADVERTISING PROJECT DESCRIPTION LQCATION COST DATE RLANRC North Campus The North Campus Consolidation project includes Downey, CA $30,590,000 Sep-12 Consolidation renovation of the inpatient acute care rehabilitation services JPI building, construction of a new inpatient acute care rehabilitation services addition to the north of the JPI building, demolition of some existing buildings, and relocation of the outpatient services and construction of new outpatient facilities. Castaic Animal Shltr SN Clinc The Project will consist of construction of a new Castaic, CA $800,000 Oct-12 and HQ approximately 1,600-square-foot spay/neuter clinic with proper evaluation, presurgery, and post-surgery rooms, and a customer service area. In addition, the Project will include installation of a new 1,440- square-foot modular administration building. Dan Blocker Beach General improvements includes a parking lot, picnic Malibu, CA $1,276,000 Oct-12 area with protective railing, restroom facilities, planting erosion control landscape for the beach. TOTAL $27 2,711,90001/12/2012 Page 3 of 3

×