SlideShare a Scribd company logo
1 of 30
Download to read offline
ARCHITECTURE
&CONSTRUCTION
AGENCY




Bulgaria, 9000 Varna
1, ILARION MAKARIOPOLSKI Str., Fl. 2,
Tel./Fax: +359 52 687555, +359 52 687 556
e-mail: office@aca.bg
ARCHITECTURE&CONSTRUCTION AGENCY



       The Architecture&Construction Agency (ACA) has been
 founded as a private company in 1993 with a separate department for
 design of steel and reinforced concrete structures. During the last years
 ACA took active part in the technological modernization of the cement
 industry in Bulgaria.

        Various customers and investors have chosen ACA to design
 industrial and civil structures including unique industrial facilities. The
 Agency is renowned for its quality design, strict dead lines keeping and
 flexibility when design modifications do need to occur. The design
 process is entirely computerized and uses up-to-date technology. ACA
 design team has an expert level in using specialized software such as
 ArchiCAD for architectural drawings, AutoCad for detailed and
 workshop drawings, SAP2000 for static, dynamic and earthquake
 analysis of structures.

         When contracted ACA performs full engineering of industrial
 facilities.


 ACA OFFERS ITS CUSTOMERS:
 m   Pre-design investigation, expertise, consulting services, advice
     on legal matters related to the design, construction and
     reconstruction of each particular project;
     Expert evaluation of the condition of existing structures and
     facilities;
     Preparation of contract drawings and bidding documentation;
 m   Complex design and approval of the project.
     Preparation of basic design drawings, engineering calculations
     and reports presented for approval by the customer and the
     State Authorities
     Workshop and detailed drawings, engineering calculations and
     reports presented for approval by the customer and the State
     Authorities including Independent Monitoring Agency;
 m   Author's Control during erection and construction including
     preparation of 'Executive/As-Built' documentation with all
     modifications occurred at site
 m   Additional services as preparation of an estimate based on the
     design documentation, project construction time schedule,
     project business plan, project coordination till plant start-up, etc.
ARCHITECTURE&CONSTRUCTION AGENCY

  ACA CONSULTS ITS CUSTOMERS ON:
  m   Legal matters related to the design, construction and
      reconstruction
  m   Local code related to the design of each particular project
  m   Structural, constructional and technological matters related to
      the industrial sector
  m   New and traditional materials
  m   Specialized software

  ACA DESIGNS INDUSTRIAL FACILITIES SUCH AS:
  m   Steel and reinforced concrete industrial facilities and structures
  m   Steel silos, hoppers, bins, reservoirs, ducts

  ACA DESIGN TEAM
  m   ACA has a team of highly qualified full-time engineers and
      draftsmen well experienced with modern computer technology
      and software packages such as ArchiCAD, AutoCAD, SAP 2000;
  m   ACA works in close relationship with renowned companies from
      the construction and industrial sectors including steel fabrication
      and erection firms;
  m   ACA extends its team of engineers with young university
      graduates with excellent academic background and promising
      career start


  Address for information and correspondence:
  Architecture&Construction Agency, Engineering Department
  Bulgaria, 9000 Varna
  1, ILARION MAKARIOPOLSKI str., Fl. 2
  Tel./Fax: +359 52 687 555, +359 52 687 556

  Contact name: Georgi Vitanov




+359 52 630 898, +359 52 630 899 e-mail: office@acahold.com
Вулкан                                           6400 Димитровгpag                     6400 Dimitrovgrad
                                                                   България                              Bulgaria
                  Vulkan                                           meл. 0391 23421                       Tel +359 391 23421
                  Italcementi Group                                фakc 0391 23512                       Fax +359 391 23512




                                                       REFERENCE


To Whom It May Concern


Architecture&Construction Agency Ltd. (ACA) has been chosen by ItalCementi Group to
perform full engineering services on the Coal Mill Project in the Vulkan Cement Plant,
Dimitrovgrad, Bulgaria. The total of 9 months design and construction duration time for the
project began in March 2000 and finished in December 2000 with installation start-up. The new
Coal Mill Facility is now used to supply Kilns 3&4 with grounded mixture of coal and coke
instead of the expensive natural gas.
ACA in cooperation with TAI (Italian engineering company that supplied basic design for the
project) and CTG (Engineering Department of ItalCementi Group that approved all drawings
during design) prepared and supplied the following documentation:
−   civil works foundations (engineering calculations, reports and detailed drawings)
−   steel supporting structures (engineering calculations, reports and detailed drawings)
−   ducts, chutes, compensators (engineering calculations, reports and detailed drawings)
−   coal dust silo (engineering calculations, reports and detailed drawings)
−   steel structure covering the coal mill, cladding with corrugated steel sheets, stairways,
    galleries for belt conveyors, service platforms, etc. (engineering calculations, reports and
    detailed drawings)
−   steel doors (detailed drawings)
−   authorization of the electrical installation documentation (project drawings and reports
    supplied by and in cooperation with the Italian Company Seit)
For this particular project ACA engineering team used software packages such as ArchiCad for
architectural drawings, AutoCad 2000 for detailed and workshop drawings, MATHCAD for
calculation reports, SAP 2000 for modeling and static, dynamic and earthquake engineering
calculations based on FEM, etc. The final documentation was supplied by ACA as a hard copy
and computer files.




                                                                  Peгucmpupaно в Okpъжeн Съg - Xackoвo    Registered in Haskovo District Court
                                                                  nog фирмено geло N° 39/1990             under Company Pile No.39/1990
                                                                  Данъчен N» 1260000485                   Tax registration No.1260000485
                                                                  BУЛCTAT 836145646 Ю                     BULSTAT 836145646 Ю
ACA team of young and highly qualified Civil and Structural Engineers (all university graduates)
managed to supply in short terms an excellent Job on a unique for the Bulgarian Industry coal mm
instalfation. During the design development of the project substantial restrictions appeared due to
the fact that some new equipment had to be placed inside an old existing building increasing
heavily the job complexity. During the whole contract and duration of the project ACA engineers
provided reiable services in the field of the Industrial Civil and Structural engineering as well as
Workshop Detailing. All ItalCementi project requirements and deadlines were kept within narrow
limits ACA engineering department took full advantage of the modem IT and computer
Sology thus being able to send, receive and process massive number of computer drawings
per day. ACA easily achieved a high quality end product, which was initial compulsory
requirement by ItalCementi for granting the full engineering service contract. Personally was
very impressed by the professionalism of ACA engineers in their everyday contact with their
CTG, TAI and Seit colleagues. The result was cost effective coordination and quick approval of
drawings.
I do consider ACA engineering team as very experienced and professional in the area of industrial
construction and modernization and have the pleasure to sign this recommendation addressing it
to any Bulgarian or foreign investor.



 Sincerely Yours,



P. Grancharov, M.Sc.
Modernization and Reconstruction Project Manager
Девня Цимент                               9160 Девня                            9160 Devnya
                                                     Промишлена зона                       Industrial Zone
          Devnya Cement                              България                              Bulgaria
          Italcementi Group                          meл. 0519 2420                        Tel +359 519 2420
                                                     meл. 052 691484                       Tel +359 52 691484
                                                     фakc 0519 3214                        Fax +359 519 3214




                                           REFERENCE

To Whom It May Concern

Architecture&Construction Agency Ltd. (ACA) received its first contract with Devnya
Cement in 1997 to perform engineering and structural services on the project 'Coal Mill
Facility for Kilns 5&6'. This facility in operation since 1999 supplies Kilns 5&6 with
grounded mixture of coal and coke instead of the expensive natural gas.
ACA in cooperation with Loesche GmbH (German manufacturer and supplier of the
coal mill unit) prepared and supplied the following documentation:
−    civil works foundations (engineering calculations, reports and detailed drawings)
−   steel supporting structures (engineering calculations, reports and detailed drawings)
−   ducts, chutes, compensators (engineering calculations, reports and detailed drawings)
The next contracts awarded by Devnya Cement to ACA in cooperation with Christian
Pfeiffer (Austrian manufacturer and supplier of grinding equipment) were for
engineering services for the reconstruction of Cement Mills 3&2&1 with modification
from open to closed technological cycle (filters, separators and related equipment).
Cement Mill 3 project ended in 1998, Cement Mill 2 project ended in 1999 and Cement
Mill 1 project is planned for year 2002. ACA supplied workshop drawings for all
relevant steel supporting structures and service platforms.
In 2000 Christian Pfeiffer (supplier of the new equipment for Cement Mills 3&2&1)
together with ItalCementi Group contracted ACA to perform an earthquake analysis of
the existing cement mill building and to estimate the influence of the new structures and
loads on the building. A detailed model of the building was created. The earthquake
analysis proved that certain structural elements of the existing cement mill building
needed modification and reinforcement due to new substantially greater dead and service
loads. ACA engineering department prepared detailed drawings for the reinforcement.
The project was finished at the end of 2000.
For the contracts mentioned above ACA engineering team used software packages such
as ArchiCad for architectural drawings, AutoCad 2000 for detailed and workshop
drawings, MATHCAD for calculation reports, SAP 2000 for modeling and static,
dynamic and earthquake engineering calculations based on FEM, etc. The final
documentation was supplied by ACA as a hard copy and computer files.



                                                     Peгucmpupaно 6 Окръжен Съд -- Bapнa    Registered in Varna District Court
                                                     nog фupмeно geло №4997/1993            under Company File No.4997/1993
                                                     Данъчен N» 1038008192                  Tax registration No.1038008192
                                                     BУЛCTAT 8131098330                     BULSTAT 8131098330
ACA team of young and highly qualified engineers (all university graduates) proved
their ability to offer in short terms high quality engineering solutions to the complex
demands for modernization and reconstruction in the Bulgarian cement industry in the
late 90's. During the design development of the projects supervised by me all
requirements and deadlines were kept within narrow limits.
The high quality end product that ACA persistently achieved would be a great advantage
to any organization especially if cost effective coordination and quick approval of
drawings is needed.
I do consider ACA engineering team as very experienced and professional in the area of
industrial construction and modernization and have the pleasure to sign this
recommendation addressing it to any Bulgarian or foreign investor.


Sincerely Yours,




P. Grancharov,
M.ScModernization and Reconstruction Project Manager
Christian Pfeiffer
                                                             Systems and components

                                         REFERENCE

       Christian Pfeiffer started to work with Architecture&Construction

Agency in 1998 on the cement mill No. 3 modernization project located

at the Devnya Cement Plant, Varna, Bulgaria. The deadline for the

project was 6 months, a very short time for such reconstruction. The job

consisted of partial modification of the main structure of the cement mill

building and an addition of a new structure for our equipment. Based on

our technological flowsheet and preliminary drawings ACA engineering

team in short time managed to produce quality workshop and detailed

documentation for fabrication and erection purposes.

       After the initial successful business relationship in 1998 during the

next two years Christian Pfeiffer and ACA managed to modernize and

reconstruct also Cement Mill No. 2 and part of Cement Mill No. 1.

       Due to new and substantially greater dead and service loads on

the   cement       mill     building    an   earthquake   survey   and     structural

modification for strengthening of the existing building was necessary.

ACA received an order and its team accomplished the job in less than

three months. The final documentation consisted of a very detailed

earthquake       analysis     and      workshop   drawings   for   steel   structure

modifications.

       It was a pleasure for us to work with ACA young and ambitious

engineering team during the past three years. I would also recommend

ACA as a reliable partner for engineering services to any eventual investor in

the Bulgarian Industry or abroad.
ARCHITECTURE&CONSTRUCTION AGENCY




                         Steel Supporting Structures

                         Steel Structures covering
                         Machines and Equipment

                         Warehouses Steel Structures
                         with Unlimited Dimensions




                         Coal Dust Silo Steel
                         Supporting Structure
                         Vulkan Cement Plant,
                         Dimitrovgrad, Bulgaria
                         Operational January, 2001
ARCHITECTURE&CONSTRUCTION AGENCY




                         Steel Structures
                         Foundations

                         Heavy Duty Equipment
                         Foundations

                         Reinforced Concrete
                         Facilities
                         (Reservoirs, Hoppers,
                         Bins, etc.)

                         Civil Structures




                         Coal Mill Foundation
                         Vulkan Cement Plant,
                         Dimitrovgrad, Bulgaria
                         Operational January, 2001
ARCHITECTURE&CONSTRUCTION AGENCY




                         Raw Materials Steel Silos

                         Steel Reservoirs
                         for Water and Fuel

                         High and Low Pressure
                         Steel Vessels




                         Coal Dust Silo
                         Vulkan Cement Plant,
                         Dimitrovgrad, Bulgaria
                         Operational December, 2000
ARCHITECTURE&CONSTRUCTION AGENCY




                         Steel Structures for
                         Belt Conveyor Galleries

                         3D Truss Steel Structures




                         Belt Conveyor Gallery,
                         Coal Supply to Grinding Unit
                         Vulkan Cement Plant,
                         Dimitrovgrad, Bulgaria
                         Operational December, 2000
Belt Conveyors

Chain Conveyors

Roller Conveyors

Static&Dynamic&Earthquake
Analysis of all kinds of
Steel Structures

Mobile Steel Structures

Driving&Driven Mechanisms




Calculation Model for
Floating Facilities
ARCHITECTURE&CONSTRUCTION AGENCY




                         Feeding Duct from Coal Dust Silo
                         to Kilns 3&4
                         Vulkan Cement Plant,
                         Dimitrovgrad, Bulgaria
                         Operational December, 2000




                         Hot/Cold
                         High/Low Pressure
                         Gas Ducts

                         Pneumatical
                         Transportation
                         Ducts




                         Duct from Hot Gas Generator
                         to Coal Mill
                         Vulkan Cement Plant,
                         Dimitrovgrad, Bulgaria
                         Operational December, 2000
Aca Devnya Hisory
Aca Devnya Hisory
Aca Devnya Hisory
Aca Devnya Hisory
Aca Devnya Hisory
Aca Devnya Hisory
Aca Devnya Hisory
Aca Devnya Hisory
Aca Devnya Hisory
Aca Devnya Hisory
Aca Devnya Hisory
Aca Devnya Hisory
Aca Devnya Hisory
Aca Devnya Hisory
Aca Devnya Hisory
Aca Devnya Hisory

More Related Content

What's hot

EDUARDO H. PARE CV - CIRCA - 04.07.2021
EDUARDO H. PARE CV - CIRCA - 04.07.2021EDUARDO H. PARE CV - CIRCA - 04.07.2021
EDUARDO H. PARE CV - CIRCA - 04.07.2021Eduardo H. Pare
 
EDUARDO H. PARE CV - STRUCTURAL ENGINEER
EDUARDO H. PARE CV - STRUCTURAL ENGINEEREDUARDO H. PARE CV - STRUCTURAL ENGINEER
EDUARDO H. PARE CV - STRUCTURAL ENGINEEREduardo H. Pare
 
EDUARDO H. PARE CV -- circa 10.2018
EDUARDO H. PARE CV  --  circa 10.2018EDUARDO H. PARE CV  --  circa 10.2018
EDUARDO H. PARE CV -- circa 10.2018Eduardo H. Pare
 
IRJET- Comparative Study on Analysis of Steel Truss Structure and Rigid Frame...
IRJET- Comparative Study on Analysis of Steel Truss Structure and Rigid Frame...IRJET- Comparative Study on Analysis of Steel Truss Structure and Rigid Frame...
IRJET- Comparative Study on Analysis of Steel Truss Structure and Rigid Frame...IRJET Journal
 
T N MURTHY-Engineering Designer
T N MURTHY-Engineering DesignerT N MURTHY-Engineering Designer
T N MURTHY-Engineering DesignerTN MURTHY
 
PQ Presentation(BADC) - Rev2
PQ Presentation(BADC) - Rev2PQ Presentation(BADC) - Rev2
PQ Presentation(BADC) - Rev2HAIDER YOUNIS
 
Lead Aircraft Design/Compliance Checker Engineer
Lead Aircraft Design/Compliance Checker EngineerLead Aircraft Design/Compliance Checker Engineer
Lead Aircraft Design/Compliance Checker EngineerLen Jones
 
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021Eduardo H. Pare
 
A.Awad_CV 1016
A.Awad_CV 1016A.Awad_CV 1016
A.Awad_CV 1016Ahmed Awad
 
Quality Management Plan
Quality Management PlanQuality Management Plan
Quality Management PlanAnuragBhat7
 
DRAUGHTSMAN Piping Mechanical_1
DRAUGHTSMAN Piping Mechanical_1DRAUGHTSMAN Piping Mechanical_1
DRAUGHTSMAN Piping Mechanical_1Nasir Mahmood
 
Eng Ahmed Naeim CV ( Mechanical Engineer ) (may 2016 )
Eng Ahmed Naeim CV ( Mechanical Engineer ) (may 2016 )Eng Ahmed Naeim CV ( Mechanical Engineer ) (may 2016 )
Eng Ahmed Naeim CV ( Mechanical Engineer ) (may 2016 )Ahmed Naeim
 

What's hot (20)

Sanriya Brochure FP
Sanriya Brochure FPSanriya Brochure FP
Sanriya Brochure FP
 
Mc cv updated 2017
Mc cv   updated 2017Mc cv   updated 2017
Mc cv updated 2017
 
SMA CV2016-1
SMA CV2016-1SMA CV2016-1
SMA CV2016-1
 
EDUARDO H. PARE CV - CIRCA - 04.07.2021
EDUARDO H. PARE CV - CIRCA - 04.07.2021EDUARDO H. PARE CV - CIRCA - 04.07.2021
EDUARDO H. PARE CV - CIRCA - 04.07.2021
 
EDUARDO H. PARE CV - STRUCTURAL ENGINEER
EDUARDO H. PARE CV - STRUCTURAL ENGINEEREDUARDO H. PARE CV - STRUCTURAL ENGINEER
EDUARDO H. PARE CV - STRUCTURAL ENGINEER
 
Derek Pattison CV1
Derek Pattison CV1Derek Pattison CV1
Derek Pattison CV1
 
EDUARDO H. PARE CV -- circa 10.2018
EDUARDO H. PARE CV  --  circa 10.2018EDUARDO H. PARE CV  --  circa 10.2018
EDUARDO H. PARE CV -- circa 10.2018
 
EDUARDO H. PARE CV
EDUARDO H. PARE CVEDUARDO H. PARE CV
EDUARDO H. PARE CV
 
2117nw
2117nw2117nw
2117nw
 
Resume
ResumeResume
Resume
 
IRJET- Comparative Study on Analysis of Steel Truss Structure and Rigid Frame...
IRJET- Comparative Study on Analysis of Steel Truss Structure and Rigid Frame...IRJET- Comparative Study on Analysis of Steel Truss Structure and Rigid Frame...
IRJET- Comparative Study on Analysis of Steel Truss Structure and Rigid Frame...
 
T N MURTHY-Engineering Designer
T N MURTHY-Engineering DesignerT N MURTHY-Engineering Designer
T N MURTHY-Engineering Designer
 
PQ Presentation(BADC) - Rev2
PQ Presentation(BADC) - Rev2PQ Presentation(BADC) - Rev2
PQ Presentation(BADC) - Rev2
 
Alaa CV
Alaa CVAlaa CV
Alaa CV
 
Lead Aircraft Design/Compliance Checker Engineer
Lead Aircraft Design/Compliance Checker EngineerLead Aircraft Design/Compliance Checker Engineer
Lead Aircraft Design/Compliance Checker Engineer
 
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021
 
A.Awad_CV 1016
A.Awad_CV 1016A.Awad_CV 1016
A.Awad_CV 1016
 
Quality Management Plan
Quality Management PlanQuality Management Plan
Quality Management Plan
 
DRAUGHTSMAN Piping Mechanical_1
DRAUGHTSMAN Piping Mechanical_1DRAUGHTSMAN Piping Mechanical_1
DRAUGHTSMAN Piping Mechanical_1
 
Eng Ahmed Naeim CV ( Mechanical Engineer ) (may 2016 )
Eng Ahmed Naeim CV ( Mechanical Engineer ) (may 2016 )Eng Ahmed Naeim CV ( Mechanical Engineer ) (may 2016 )
Eng Ahmed Naeim CV ( Mechanical Engineer ) (may 2016 )
 

Viewers also liked

Virginia’S Convergence Project
Virginia’S Convergence ProjectVirginia’S Convergence Project
Virginia’S Convergence Projectcamillav456
 
Virginia’S Convergence Project
Virginia’S Convergence ProjectVirginia’S Convergence Project
Virginia’S Convergence Projectcamillav456
 
Math Project 8-20-2009
Math Project 8-20-2009Math Project 8-20-2009
Math Project 8-20-2009MichaelSmith
 
Math Project 8 20 2009
Math Project 8 20 2009Math Project 8 20 2009
Math Project 8 20 2009MichaelSmith
 
Classification Virginia
Classification VirginiaClassification Virginia
Classification Virginiacamillav456
 
Virginia’S Convergence Project
Virginia’S Convergence ProjectVirginia’S Convergence Project
Virginia’S Convergence Projectcamillav456
 
Kamchia 2-05-en-hd
Kamchia 2-05-en-hdKamchia 2-05-en-hd
Kamchia 2-05-en-hdACA HOLDING
 
Mag rails 2011 web application deployment for small teams
Mag rails 2011   web application deployment for small teamsMag rails 2011   web application deployment for small teams
Mag rails 2011 web application deployment for small teamsLee Hambley
 
Intermediate Capistrano
Intermediate  CapistranoIntermediate  Capistrano
Intermediate CapistranoLee Hambley
 
Mobile Marketing 2008 D2C
Mobile Marketing 2008 D2CMobile Marketing 2008 D2C
Mobile Marketing 2008 D2CKuan Wu
 
Pgjrn Puisi Mly Moden
Pgjrn Puisi Mly ModenPgjrn Puisi Mly Moden
Pgjrn Puisi Mly ModenAwang Kelabu
 
Teknik Pgjrn Cerpen
 Teknik Pgjrn Cerpen Teknik Pgjrn Cerpen
Teknik Pgjrn CerpenAwang Kelabu
 
Ruby Open Air presentation
Ruby Open Air presentationRuby Open Air presentation
Ruby Open Air presentationLee Hambley
 

Viewers also liked (17)

Virginia’S Convergence Project
Virginia’S Convergence ProjectVirginia’S Convergence Project
Virginia’S Convergence Project
 
Virginia’S Convergence Project
Virginia’S Convergence ProjectVirginia’S Convergence Project
Virginia’S Convergence Project
 
Math Project 8-20-2009
Math Project 8-20-2009Math Project 8-20-2009
Math Project 8-20-2009
 
Math Project 8 20 2009
Math Project 8 20 2009Math Project 8 20 2009
Math Project 8 20 2009
 
Classification Virginia
Classification VirginiaClassification Virginia
Classification Virginia
 
Aca interior
Aca interiorAca interior
Aca interior
 
Virginia’S Convergence Project
Virginia’S Convergence ProjectVirginia’S Convergence Project
Virginia’S Convergence Project
 
Kamchia 2-05-en-hd
Kamchia 2-05-en-hdKamchia 2-05-en-hd
Kamchia 2-05-en-hd
 
Mag rails 2011 web application deployment for small teams
Mag rails 2011   web application deployment for small teamsMag rails 2011   web application deployment for small teams
Mag rails 2011 web application deployment for small teams
 
Intermediate Capistrano
Intermediate  CapistranoIntermediate  Capistrano
Intermediate Capistrano
 
Mobile Marketing 2008 D2C
Mobile Marketing 2008 D2CMobile Marketing 2008 D2C
Mobile Marketing 2008 D2C
 
Spm Bm Apr Rm 4
Spm Bm Apr Rm 4Spm Bm Apr Rm 4
Spm Bm Apr Rm 4
 
Pgjrn Puisi Mly Moden
Pgjrn Puisi Mly ModenPgjrn Puisi Mly Moden
Pgjrn Puisi Mly Moden
 
Teknik Pgjrn Cerpen
 Teknik Pgjrn Cerpen Teknik Pgjrn Cerpen
Teknik Pgjrn Cerpen
 
Ruby Open Air presentation
Ruby Open Air presentationRuby Open Air presentation
Ruby Open Air presentation
 
Metodologi
Metodologi Metodologi
Metodologi
 
Metodologi muzik
Metodologi muzik Metodologi muzik
Metodologi muzik
 

Similar to Aca Devnya Hisory

Cube srl - Engineering Consulting
Cube srl - Engineering ConsultingCube srl - Engineering Consulting
Cube srl - Engineering ConsultingFederico Mecarelli
 
Case Study of BIM, Detailing and Modelling
Case Study of BIM, Detailing and ModellingCase Study of BIM, Detailing and Modelling
Case Study of BIM, Detailing and ModellingBDS VirCon
 
Portfolio Aleksa Cavic
Portfolio Aleksa CavicPortfolio Aleksa Cavic
Portfolio Aleksa CavicAleksa Cavic
 
Eng. M. El-Shorbagy CV and relater certificates ( project manager - pmp) 8.09 mb
Eng. M. El-Shorbagy CV and relater certificates ( project manager - pmp) 8.09 mbEng. M. El-Shorbagy CV and relater certificates ( project manager - pmp) 8.09 mb
Eng. M. El-Shorbagy CV and relater certificates ( project manager - pmp) 8.09 mbMohamed ElShourbagy (PMP)
 
ERG_New Presentation 2015- sept
ERG_New Presentation 2015- septERG_New Presentation 2015- sept
ERG_New Presentation 2015- septEnergo Brasov
 
Tyron Muller Curriculum Vitae
Tyron Muller Curriculum VitaeTyron Muller Curriculum Vitae
Tyron Muller Curriculum VitaeTyron Muller
 
Autocad_Designer-facade
Autocad_Designer-facadeAutocad_Designer-facade
Autocad_Designer-facadeVijay Shinde
 
Nemetschek Scia company profile (v 01072013)
Nemetschek Scia company profile (v 01072013)Nemetschek Scia company profile (v 01072013)
Nemetschek Scia company profile (v 01072013)Rudi Vanmechelen ✉ SCIA
 
Profil b&b en @
Profil b&b en @Profil b&b en @
Profil b&b en @EUROPAGES
 
Baumruk profil spolecnosti_czak01426_en
Baumruk profil spolecnosti_czak01426_enBaumruk profil spolecnosti_czak01426_en
Baumruk profil spolecnosti_czak01426_enEUROPAGES
 
Technology Used in Steel Detailing
Technology Used in Steel Detailing Technology Used in Steel Detailing
Technology Used in Steel Detailing AxtellaStructures
 
ENERGO Brasov - new presentation 2015 May
ENERGO Brasov -  new presentation 2015  MayENERGO Brasov -  new presentation 2015  May
ENERGO Brasov - new presentation 2015 MayDaniel DRAGOSIN
 
Electrical Draftsman
Electrical DraftsmanElectrical Draftsman
Electrical Draftsmanmohammed aly
 

Similar to Aca Devnya Hisory (20)

Portfolio Rev7.ppsx
Portfolio Rev7.ppsxPortfolio Rev7.ppsx
Portfolio Rev7.ppsx
 
Cube srl - Engineering Consulting
Cube srl - Engineering ConsultingCube srl - Engineering Consulting
Cube srl - Engineering Consulting
 
Case Study of BIM, Detailing and Modelling
Case Study of BIM, Detailing and ModellingCase Study of BIM, Detailing and Modelling
Case Study of BIM, Detailing and Modelling
 
Portfolio Aleksa Cavic
Portfolio Aleksa CavicPortfolio Aleksa Cavic
Portfolio Aleksa Cavic
 
Eng. M. El-Shorbagy CV and relater certificates ( project manager - pmp) 8.09 mb
Eng. M. El-Shorbagy CV and relater certificates ( project manager - pmp) 8.09 mbEng. M. El-Shorbagy CV and relater certificates ( project manager - pmp) 8.09 mb
Eng. M. El-Shorbagy CV and relater certificates ( project manager - pmp) 8.09 mb
 
ERG_New Presentation 2015- sept
ERG_New Presentation 2015- septERG_New Presentation 2015- sept
ERG_New Presentation 2015- sept
 
Tyron Muller Curriculum Vitae
Tyron Muller Curriculum VitaeTyron Muller Curriculum Vitae
Tyron Muller Curriculum Vitae
 
Ahmed-shawky
Ahmed-shawkyAhmed-shawky
Ahmed-shawky
 
Tekla Global BIM Awards 2013
Tekla Global BIM Awards 2013Tekla Global BIM Awards 2013
Tekla Global BIM Awards 2013
 
Autocad_Designer-facade
Autocad_Designer-facadeAutocad_Designer-facade
Autocad_Designer-facade
 
CV Joseph Rey C. Marilla
CV Joseph Rey C. MarillaCV Joseph Rey C. Marilla
CV Joseph Rey C. Marilla
 
Nemetschek Scia company profile (v 01072013)
Nemetschek Scia company profile (v 01072013)Nemetschek Scia company profile (v 01072013)
Nemetschek Scia company profile (v 01072013)
 
Profil b&b en @
Profil b&b en @Profil b&b en @
Profil b&b en @
 
RESUME
RESUMERESUME
RESUME
 
Baumruk profil spolecnosti_czak01426_en
Baumruk profil spolecnosti_czak01426_enBaumruk profil spolecnosti_czak01426_en
Baumruk profil spolecnosti_czak01426_en
 
Technology Used in Steel Detailing
Technology Used in Steel Detailing Technology Used in Steel Detailing
Technology Used in Steel Detailing
 
kenan Alnamous CV
kenan Alnamous CVkenan Alnamous CV
kenan Alnamous CV
 
ENERGO Brasov - new presentation 2015 May
ENERGO Brasov -  new presentation 2015  MayENERGO Brasov -  new presentation 2015  May
ENERGO Brasov - new presentation 2015 May
 
Bio_data2
Bio_data2Bio_data2
Bio_data2
 
Electrical Draftsman
Electrical DraftsmanElectrical Draftsman
Electrical Draftsman
 

More from ACA HOLDING

Vinic a 3-06-en-hd
Vinic a 3-06-en-hdVinic a 3-06-en-hd
Vinic a 3-06-en-hdACA HOLDING
 
Apple garden 5-08-en-hd
Apple garden 5-08-en-hdApple garden 5-08-en-hd
Apple garden 5-08-en-hdACA HOLDING
 
Aca interior shops
Aca interior shopsAca interior shops
Aca interior shopsACA HOLDING
 
Aca interior broshure
Aca interior broshureAca interior broshure
Aca interior broshureACA HOLDING
 
Kavarna 1-05-en-hd
Kavarna 1-05-en-hdKavarna 1-05-en-hd
Kavarna 1-05-en-hdACA HOLDING
 

More from ACA HOLDING (6)

History
HistoryHistory
History
 
Vinic a 3-06-en-hd
Vinic a 3-06-en-hdVinic a 3-06-en-hd
Vinic a 3-06-en-hd
 
Apple garden 5-08-en-hd
Apple garden 5-08-en-hdApple garden 5-08-en-hd
Apple garden 5-08-en-hd
 
Aca interior shops
Aca interior shopsAca interior shops
Aca interior shops
 
Aca interior broshure
Aca interior broshureAca interior broshure
Aca interior broshure
 
Kavarna 1-05-en-hd
Kavarna 1-05-en-hdKavarna 1-05-en-hd
Kavarna 1-05-en-hd
 

Recently uploaded

WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clashcharlottematthew16
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostZilliz
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfRankYa
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteDianaGray10
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningLars Bell
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxhariprasad279825
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piececharlottematthew16
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 

Recently uploaded (20)

WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clash
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdf
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test Suite
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine Tuning
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piece
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 

Aca Devnya Hisory

  • 1. ARCHITECTURE &CONSTRUCTION AGENCY Bulgaria, 9000 Varna 1, ILARION MAKARIOPOLSKI Str., Fl. 2, Tel./Fax: +359 52 687555, +359 52 687 556 e-mail: office@aca.bg
  • 2. ARCHITECTURE&CONSTRUCTION AGENCY The Architecture&Construction Agency (ACA) has been founded as a private company in 1993 with a separate department for design of steel and reinforced concrete structures. During the last years ACA took active part in the technological modernization of the cement industry in Bulgaria. Various customers and investors have chosen ACA to design industrial and civil structures including unique industrial facilities. The Agency is renowned for its quality design, strict dead lines keeping and flexibility when design modifications do need to occur. The design process is entirely computerized and uses up-to-date technology. ACA design team has an expert level in using specialized software such as ArchiCAD for architectural drawings, AutoCad for detailed and workshop drawings, SAP2000 for static, dynamic and earthquake analysis of structures. When contracted ACA performs full engineering of industrial facilities. ACA OFFERS ITS CUSTOMERS: m Pre-design investigation, expertise, consulting services, advice on legal matters related to the design, construction and reconstruction of each particular project; Expert evaluation of the condition of existing structures and facilities; Preparation of contract drawings and bidding documentation; m Complex design and approval of the project. Preparation of basic design drawings, engineering calculations and reports presented for approval by the customer and the State Authorities Workshop and detailed drawings, engineering calculations and reports presented for approval by the customer and the State Authorities including Independent Monitoring Agency; m Author's Control during erection and construction including preparation of 'Executive/As-Built' documentation with all modifications occurred at site m Additional services as preparation of an estimate based on the design documentation, project construction time schedule, project business plan, project coordination till plant start-up, etc.
  • 3. ARCHITECTURE&CONSTRUCTION AGENCY ACA CONSULTS ITS CUSTOMERS ON: m Legal matters related to the design, construction and reconstruction m Local code related to the design of each particular project m Structural, constructional and technological matters related to the industrial sector m New and traditional materials m Specialized software ACA DESIGNS INDUSTRIAL FACILITIES SUCH AS: m Steel and reinforced concrete industrial facilities and structures m Steel silos, hoppers, bins, reservoirs, ducts ACA DESIGN TEAM m ACA has a team of highly qualified full-time engineers and draftsmen well experienced with modern computer technology and software packages such as ArchiCAD, AutoCAD, SAP 2000; m ACA works in close relationship with renowned companies from the construction and industrial sectors including steel fabrication and erection firms; m ACA extends its team of engineers with young university graduates with excellent academic background and promising career start Address for information and correspondence: Architecture&Construction Agency, Engineering Department Bulgaria, 9000 Varna 1, ILARION MAKARIOPOLSKI str., Fl. 2 Tel./Fax: +359 52 687 555, +359 52 687 556 Contact name: Georgi Vitanov +359 52 630 898, +359 52 630 899 e-mail: office@acahold.com
  • 4. Вулкан 6400 Димитровгpag 6400 Dimitrovgrad България Bulgaria Vulkan meл. 0391 23421 Tel +359 391 23421 Italcementi Group фakc 0391 23512 Fax +359 391 23512 REFERENCE To Whom It May Concern Architecture&Construction Agency Ltd. (ACA) has been chosen by ItalCementi Group to perform full engineering services on the Coal Mill Project in the Vulkan Cement Plant, Dimitrovgrad, Bulgaria. The total of 9 months design and construction duration time for the project began in March 2000 and finished in December 2000 with installation start-up. The new Coal Mill Facility is now used to supply Kilns 3&4 with grounded mixture of coal and coke instead of the expensive natural gas. ACA in cooperation with TAI (Italian engineering company that supplied basic design for the project) and CTG (Engineering Department of ItalCementi Group that approved all drawings during design) prepared and supplied the following documentation: − civil works foundations (engineering calculations, reports and detailed drawings) − steel supporting structures (engineering calculations, reports and detailed drawings) − ducts, chutes, compensators (engineering calculations, reports and detailed drawings) − coal dust silo (engineering calculations, reports and detailed drawings) − steel structure covering the coal mill, cladding with corrugated steel sheets, stairways, galleries for belt conveyors, service platforms, etc. (engineering calculations, reports and detailed drawings) − steel doors (detailed drawings) − authorization of the electrical installation documentation (project drawings and reports supplied by and in cooperation with the Italian Company Seit) For this particular project ACA engineering team used software packages such as ArchiCad for architectural drawings, AutoCad 2000 for detailed and workshop drawings, MATHCAD for calculation reports, SAP 2000 for modeling and static, dynamic and earthquake engineering calculations based on FEM, etc. The final documentation was supplied by ACA as a hard copy and computer files. Peгucmpupaно в Okpъжeн Съg - Xackoвo Registered in Haskovo District Court nog фирмено geло N° 39/1990 under Company Pile No.39/1990 Данъчен N» 1260000485 Tax registration No.1260000485 BУЛCTAT 836145646 Ю BULSTAT 836145646 Ю
  • 5. ACA team of young and highly qualified Civil and Structural Engineers (all university graduates) managed to supply in short terms an excellent Job on a unique for the Bulgarian Industry coal mm instalfation. During the design development of the project substantial restrictions appeared due to the fact that some new equipment had to be placed inside an old existing building increasing heavily the job complexity. During the whole contract and duration of the project ACA engineers provided reiable services in the field of the Industrial Civil and Structural engineering as well as Workshop Detailing. All ItalCementi project requirements and deadlines were kept within narrow limits ACA engineering department took full advantage of the modem IT and computer Sology thus being able to send, receive and process massive number of computer drawings per day. ACA easily achieved a high quality end product, which was initial compulsory requirement by ItalCementi for granting the full engineering service contract. Personally was very impressed by the professionalism of ACA engineers in their everyday contact with their CTG, TAI and Seit colleagues. The result was cost effective coordination and quick approval of drawings. I do consider ACA engineering team as very experienced and professional in the area of industrial construction and modernization and have the pleasure to sign this recommendation addressing it to any Bulgarian or foreign investor. Sincerely Yours, P. Grancharov, M.Sc. Modernization and Reconstruction Project Manager
  • 6. Девня Цимент 9160 Девня 9160 Devnya Промишлена зона Industrial Zone Devnya Cement България Bulgaria Italcementi Group meл. 0519 2420 Tel +359 519 2420 meл. 052 691484 Tel +359 52 691484 фakc 0519 3214 Fax +359 519 3214 REFERENCE To Whom It May Concern Architecture&Construction Agency Ltd. (ACA) received its first contract with Devnya Cement in 1997 to perform engineering and structural services on the project 'Coal Mill Facility for Kilns 5&6'. This facility in operation since 1999 supplies Kilns 5&6 with grounded mixture of coal and coke instead of the expensive natural gas. ACA in cooperation with Loesche GmbH (German manufacturer and supplier of the coal mill unit) prepared and supplied the following documentation: − civil works foundations (engineering calculations, reports and detailed drawings) − steel supporting structures (engineering calculations, reports and detailed drawings) − ducts, chutes, compensators (engineering calculations, reports and detailed drawings) The next contracts awarded by Devnya Cement to ACA in cooperation with Christian Pfeiffer (Austrian manufacturer and supplier of grinding equipment) were for engineering services for the reconstruction of Cement Mills 3&2&1 with modification from open to closed technological cycle (filters, separators and related equipment). Cement Mill 3 project ended in 1998, Cement Mill 2 project ended in 1999 and Cement Mill 1 project is planned for year 2002. ACA supplied workshop drawings for all relevant steel supporting structures and service platforms. In 2000 Christian Pfeiffer (supplier of the new equipment for Cement Mills 3&2&1) together with ItalCementi Group contracted ACA to perform an earthquake analysis of the existing cement mill building and to estimate the influence of the new structures and loads on the building. A detailed model of the building was created. The earthquake analysis proved that certain structural elements of the existing cement mill building needed modification and reinforcement due to new substantially greater dead and service loads. ACA engineering department prepared detailed drawings for the reinforcement. The project was finished at the end of 2000. For the contracts mentioned above ACA engineering team used software packages such as ArchiCad for architectural drawings, AutoCad 2000 for detailed and workshop drawings, MATHCAD for calculation reports, SAP 2000 for modeling and static, dynamic and earthquake engineering calculations based on FEM, etc. The final documentation was supplied by ACA as a hard copy and computer files. Peгucmpupaно 6 Окръжен Съд -- Bapнa Registered in Varna District Court nog фupмeно geло №4997/1993 under Company File No.4997/1993 Данъчен N» 1038008192 Tax registration No.1038008192 BУЛCTAT 8131098330 BULSTAT 8131098330
  • 7. ACA team of young and highly qualified engineers (all university graduates) proved their ability to offer in short terms high quality engineering solutions to the complex demands for modernization and reconstruction in the Bulgarian cement industry in the late 90's. During the design development of the projects supervised by me all requirements and deadlines were kept within narrow limits. The high quality end product that ACA persistently achieved would be a great advantage to any organization especially if cost effective coordination and quick approval of drawings is needed. I do consider ACA engineering team as very experienced and professional in the area of industrial construction and modernization and have the pleasure to sign this recommendation addressing it to any Bulgarian or foreign investor. Sincerely Yours, P. Grancharov, M.ScModernization and Reconstruction Project Manager
  • 8. Christian Pfeiffer Systems and components REFERENCE Christian Pfeiffer started to work with Architecture&Construction Agency in 1998 on the cement mill No. 3 modernization project located at the Devnya Cement Plant, Varna, Bulgaria. The deadline for the project was 6 months, a very short time for such reconstruction. The job consisted of partial modification of the main structure of the cement mill building and an addition of a new structure for our equipment. Based on our technological flowsheet and preliminary drawings ACA engineering team in short time managed to produce quality workshop and detailed documentation for fabrication and erection purposes. After the initial successful business relationship in 1998 during the next two years Christian Pfeiffer and ACA managed to modernize and reconstruct also Cement Mill No. 2 and part of Cement Mill No. 1. Due to new and substantially greater dead and service loads on the cement mill building an earthquake survey and structural modification for strengthening of the existing building was necessary. ACA received an order and its team accomplished the job in less than three months. The final documentation consisted of a very detailed earthquake analysis and workshop drawings for steel structure modifications. It was a pleasure for us to work with ACA young and ambitious engineering team during the past three years. I would also recommend ACA as a reliable partner for engineering services to any eventual investor in the Bulgarian Industry or abroad.
  • 9. ARCHITECTURE&CONSTRUCTION AGENCY Steel Supporting Structures Steel Structures covering Machines and Equipment Warehouses Steel Structures with Unlimited Dimensions Coal Dust Silo Steel Supporting Structure Vulkan Cement Plant, Dimitrovgrad, Bulgaria Operational January, 2001
  • 10. ARCHITECTURE&CONSTRUCTION AGENCY Steel Structures Foundations Heavy Duty Equipment Foundations Reinforced Concrete Facilities (Reservoirs, Hoppers, Bins, etc.) Civil Structures Coal Mill Foundation Vulkan Cement Plant, Dimitrovgrad, Bulgaria Operational January, 2001
  • 11. ARCHITECTURE&CONSTRUCTION AGENCY Raw Materials Steel Silos Steel Reservoirs for Water and Fuel High and Low Pressure Steel Vessels Coal Dust Silo Vulkan Cement Plant, Dimitrovgrad, Bulgaria Operational December, 2000
  • 12. ARCHITECTURE&CONSTRUCTION AGENCY Steel Structures for Belt Conveyor Galleries 3D Truss Steel Structures Belt Conveyor Gallery, Coal Supply to Grinding Unit Vulkan Cement Plant, Dimitrovgrad, Bulgaria Operational December, 2000
  • 13. Belt Conveyors Chain Conveyors Roller Conveyors Static&Dynamic&Earthquake Analysis of all kinds of Steel Structures Mobile Steel Structures Driving&Driven Mechanisms Calculation Model for Floating Facilities
  • 14. ARCHITECTURE&CONSTRUCTION AGENCY Feeding Duct from Coal Dust Silo to Kilns 3&4 Vulkan Cement Plant, Dimitrovgrad, Bulgaria Operational December, 2000 Hot/Cold High/Low Pressure Gas Ducts Pneumatical Transportation Ducts Duct from Hot Gas Generator to Coal Mill Vulkan Cement Plant, Dimitrovgrad, Bulgaria Operational December, 2000