• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
i-PARK
 

i-PARK

on

  • 877 views

i-PARK at Indahpura Phase I, II & III, Iskandar, Johor, Malaysia

i-PARK at Indahpura Phase I, II & III, Iskandar, Johor, Malaysia

Statistics

Views

Total Views
877
Views on SlideShare
516
Embed Views
361

Actions

Likes
0
Downloads
2
Comments
0

3 Embeds 361

http://www.i-park.com.my 175
http://i-park.com.my 94
http://i-park.doc3.co 92

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    i-PARK i-PARK Presentation Transcript

    • The  Birth  of  the    
    •                                                              The  Big  Idea  In  formula+ng  a  design  for  i-­‐PARK,  AME  took  into  account  their   customers  demands  for  a  premium  industrial  park.  They  wanted:  Ø  A  Freehold  *tle  Ø  An  excellent  loca*on  with  mature  infrastructure  Ø  Modern  designs  with    all  infrastructure  built  to  interna*onal  standards  Ø  Security  –  A  gated  &  guarded  secure  facility  to  address  security  issues   raised  by  foreign  companies  moving  to  Malaysia  Ø  Excellent  landscaping  with  green  features  Ø  High  standards  of  construc*on  and  design  Ø  Build  to  suit  and  customiza*on  by  master  builder  AME  Construc*on  Sdn   Bhd  Ø  Fast  Delivery    
    • The  First  Development                                                      @  SiLC                                      AME’s  first  i-­‐PARK  comprised  of  18  units    of  Semi  Detached    industrial  lots  and    one  detached  unit.    It  introduced  the  concepts  laid  down  by  customer  requests    The  project  was  sold    out  when  launched  
    • Clean  and  Green  Concept     becomes  a  Reality  Completed  show  unit  of  i-­‐Park@SiLC   Green Surroundings Main  Entrance  &   Guard  House   i-Park@SiLC Perimeter Wall Fencing
    • Build  to  Suit  was  well  received     2012  i-­‐Park  @  silc  Customized  Development  Sold  to    Kenko  Food  Sdn  Bhd  
    • Then  came                                                                        @Indahpura       Phases  1&2  
    • The  Perfect  LocaLon  was  Discovered    E304  
    • Its  all  about  Loca+on  ü  7.7  km  to  Senai  Airport  ü  35  km  to  the  Port  of  Tanjung  Pelepas  ü  35  km  to  the  2nd  link  to  Singapore  ü  30  km  to  the  CIQ  in  JB  ü  30  km  to  JB  city  centre  ü  4  km  to  Johor  Premium  Outlet  
    • The  Details  of  the  Development   AEON   Shopping   Mall   Workers   Dormitory   Police  Headquarters  
    • The  Design  Concept  ü  A  Freehold  +tle  ü  An  excellent  loca+on  in  the  midst  of  the  rapidly  developing   Indahpura  township  development  by  the  Gen+ng  Group  with   mature  infrastructure  ü  A  mix  of  Build  to  Suit  projects  together  with  large  detached   and  semi-­‐detached  units  featuring  modern  designs  with    all   infrastructure  built  to  interna+onal  standards  ü  Security  –  A  gated  &  guarded  secure  facility.  Full  perimeter   fencing  and  CCTV  using  the  latest  technology  ü  Clean  and  Green  Concept  with  excellent  landscaping    ü  High  standards  of  construc+on  and  design    and  fast  delivery   by  master  builder  AME  Construc+on  Sdn  Bhd  ü  Managed  worker  accommoda+on  on  site  
    • Phase 1 & 2 Custom  built   worker   accommoda+on  Sales  Gallery  /Management   office   Entrance  /   Main  Guard   House   Shops/  Banks/   F&B  
    • i-­‐PARK  Phases  1&2  saw  a  big  demand  for  its  concept   Phase  2   90%  Sold     Phase  1   Sold  Out  
    • Features-­‐  Gated  and  Guarded  
    • Features-­‐  Worker  AccommodaLon   World  Standard  customized  designs  available  for  up  to  5,000  beds.    Rooms  are  for  rent    with  full  property  management  and  maintenance    
    • Welcome  to  our  Showroom  Sales Office & Main Entrance
    • Phase  1&2  Developments  Standard  Semi-­‐  D  Design     Standard  1  Acre  Detached  Lot    Built  Up  12,100  sq.  M.   Built  Up  27,000  sq.  M.   Standard    2  Acre  Detached  Lot     Sales Office & Main Entrance Up  55,400  sq.  M.   Built  
    • CompleLon  of  First  Build  to  Suit  for  MNC  customer   The  Trusted  Source  for  Secure  Iden+ty  Solu+ons  
    • In  Progress  -­‐Second    Build  to  Suit  for  MNC  customer   Sold  to:-­‐   Van  Leeuwen  Pipe  and  Tube  (Singapore)  Pte  Ltd  
    • The  Highest    Standards  of  Fit  and  Finish     Standard  1  ½  Storey  Detached  Unit  
    • Introducing  i-­‐PARK  @  Indahpura  Phase  III  +  SME  City  
    • Phase 3
    • Its  all  about  Loca+on  ü  200  meters  to  AEON’s  new  Shopping  Mall  (Comple+on  2013)    ü  2  km  to  Kulai  Town  ü  Located  in  Bandar  Indahpura  
    • LocaLon  Map  Phase 3
    • The  Layout  Plan   For  the  first  +me   i-­‐PARK  is  offering  large   sites  for  major  MNC’s   to  relocate  to  Johor     Sites  range  from  1-­‐40   acres     Larger  players  will     akract  their  own  eco     system  of  suppliers  who   want  wish  to  relocate     to  be  near  their  principal     Shortening  the  supply   chain  helps  reduce  the   carbon  footprint  of  the     park  
    • InnovaLve  Features  of  i-­‐PARK  ü  High  level  of  customiza+on  available  to  all  customers  ü  Full  24  Hour  Security  –  gated  and  guarded.  Kulaijaya  Police  District   HQ  at  entrance  to  SME  CITY  ü  Worker  accommoda+on  on  site  ü  Wide  roads  for  easy  access  ü  Urban  parks  with  walkways,  lush  landscaping  ü  Full  services  –  LNG  on  site,  high  speed  broadband,  ample  power   and  water  ü  Professional  Construc+on  Management  –  excellent  quality  ü  Professional  Property  Management  ü  Strong  JV  partners  who  are  industrial  specialists  in  their  own  right  ü  SME  CITY  supports  the  ac+vi+es  on  i-­‐PARK        
    • Customized  Designs  Available  –  1  Acre     PHASE  2  NEW  DESIGN  -­‐  TYPE  B  Land  area  -­‐  approx.  43,560  n²  Build  up  area  -­‐  approx.  27,383  n²  
    • Customized  Designs  Available  –  2  Acre     PHASE  2  NEW  DESIGN  -­‐  TYPE  C  Land  area  -­‐  approx.  87,120  n²  Build  up  area  -­‐  approx.  55,365  n²  
    • Summary  ü  It  offers  a  holis+c  solu+on  for  the  widest  scope  of  industrial   customers  from  Johor  ,  Singapore  and  Interna+onally.  ü  The  park  has  a  total  size  of  230  acres  and  caters  for  large  and  small   operators  in  a  master  planned  development  with  excellent   infrastructure  ü  The  SME  City  is  a  brand  new  concept  as  it  is  located  next  to  i-­‐PARK   and  its  industries  will  provide  the  necessary  services  for  the  larger   industrial  customers  in  i-­‐PARK.  ü  SME  City  offers  a  mix  of  Semi  Detached  ,  Detached  and  Cluster   catering  for  every  possible    SME  specifica+on.  ü  I-­‐park  offers  a  combina+on  of  lot  sizes  from  40  acres  down  to  1   acre  so  product  offerings  can  be  custom  tailored  for  our  clients  on  a   build  to  sell  or  build  to  lease    op+on.  ü  This  is  first  +me  such  a  concept  is  being  offered  to  customers  in   Iskandar.    
    • LocaLon  Map   Phase  3   Phase  1  Phase  2  
    • The  Layout  Plan  
    • Wide  Range  of  Products   Detached   Factory  Semi  Detached  Factory   Cluster  Factory  
    • Thank  You