Filming Schedule

321 views
261 views

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
321
On SlideShare
0
From Embeds
0
Number of Embeds
5
Actions
Shares
0
Downloads
3
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Filming Schedule

  1. 1. Scene # 2 Breakdown Sheet # SCRIPT BREAKDOWN SHEET “FILM TITLE” Int / Ext Set In the Schools main hall in the dark with the lighting Day / Night Pages Internal Night Description: a party scene in the hall and the extras dancing to music. Location Studio Schools main hall Cast Extras Stunts Genie N/A N/A Extras Props Wardrobe Vehicles Facetime phone N/A N/A Notes: Meet at the media suite at 1.00 o’clock on m Monday 18th October

×