MIDDLE SCHOOL RENOVATION<br />WEEKLY PROGRESS<br />JUNE 17 - 24<br />
6/17/10<br />A-POD 1ST FLOOR NORTH SIDE<br />
6/17/10<br />C-POD 1ST FLOOR SOUTH SIDE<br />
6/17/10<br />F-POD 2ND FLOOR SOUTH SIDE<br />
6/17/10<br />GYM (STAGE AREA)<br />
6/21/10<br />C-POD 1ST FLOOR SOUTH SIDE<br />
6/21/10<br />E-POD 2ND FLOOR NORTH SIDE<br />
6/21/10<br />F-POD 2ND FLOOR SOUTH SIDE<br />
6/21/10<br />GYM (OLD STAGE AREA)<br />
6/21/10<br />RESTROOMS 1ST FLOOR<br />
6-22-10<br />D-pod east Side <br />
6/23/10GYMSETTING OF STEEL BEAMS <br />
6/23/10WALL THAT WAS BETWEEN LIBRARY 2ND FLOOR AND LARGE GROUP ROOM<br />
6/24/10REMOVAL OF STONE FROM ROOF<br />
6/24/10NEW ROOF<br />
6/24/10LIBRARY 2ND FLOOR<br />
6/24/10WALL THAT WAS BETWEEN LIBRARY AND LARGE GROUP ROOM<br />
6/24/10<br />D-POD 2ND FLOOR WALL STUDS COMPLETED	<br />E-POD 2ND FLOOR WALL STUDS  STARTED <br />
6/24/10<br />A-POD 1ST FLOOR NORTH SIDE WALLS STARTED<br />C-POD CLASSROOM WALLS<br />
6/24/10C-POD CLASSROOM WALLS<br />
6/24/10GYM (WAS STAGE AREA)<br />
Upcoming SlideShare
Loading in...5
×

Ms Renovation Weekly

265

Published on

Milton Middle School Renovation Weekly update June 24, 2010

Published in: Education, Sports, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
265
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Ms Renovation Weekly

  1. 1. MIDDLE SCHOOL RENOVATION<br />WEEKLY PROGRESS<br />JUNE 17 - 24<br />
  2. 2. 6/17/10<br />A-POD 1ST FLOOR NORTH SIDE<br />
  3. 3. 6/17/10<br />C-POD 1ST FLOOR SOUTH SIDE<br />
  4. 4. 6/17/10<br />F-POD 2ND FLOOR SOUTH SIDE<br />
  5. 5. 6/17/10<br />GYM (STAGE AREA)<br />
  6. 6. 6/21/10<br />C-POD 1ST FLOOR SOUTH SIDE<br />
  7. 7. 6/21/10<br />E-POD 2ND FLOOR NORTH SIDE<br />
  8. 8. 6/21/10<br />F-POD 2ND FLOOR SOUTH SIDE<br />
  9. 9. 6/21/10<br />GYM (OLD STAGE AREA)<br />
  10. 10. 6/21/10<br />RESTROOMS 1ST FLOOR<br />
  11. 11. 6-22-10<br />D-pod east Side <br />
  12. 12. 6/23/10GYMSETTING OF STEEL BEAMS <br />
  13. 13. 6/23/10WALL THAT WAS BETWEEN LIBRARY 2ND FLOOR AND LARGE GROUP ROOM<br />
  14. 14. 6/24/10REMOVAL OF STONE FROM ROOF<br />
  15. 15. 6/24/10NEW ROOF<br />
  16. 16. 6/24/10LIBRARY 2ND FLOOR<br />
  17. 17. 6/24/10WALL THAT WAS BETWEEN LIBRARY AND LARGE GROUP ROOM<br />
  18. 18. 6/24/10<br />D-POD 2ND FLOOR WALL STUDS COMPLETED <br />E-POD 2ND FLOOR WALL STUDS STARTED <br />
  19. 19. 6/24/10<br />A-POD 1ST FLOOR NORTH SIDE WALLS STARTED<br />C-POD CLASSROOM WALLS<br />
  20. 20. 6/24/10C-POD CLASSROOM WALLS<br />
  21. 21. 6/24/10GYM (WAS STAGE AREA)<br />
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×