MS Renovation - July 2, 2010

  1. 1. MIDDLE SCHOOL RENOVATION<br />WEEKLY PROGRESS<br />JUNE 28 – JULY 1<br />
  2. 2. 6/28/10<br />A-pod 1st floor north side<br />
  3. 3. 6/28/10<br />C-pod 1st floor south side<br />
  4. 4. 6/28/10<br />D-pod 2nd floor east side<br />
  5. 5. 6/28/10<br />E-pod 2nd floor north side<br />
  6. 6. 6/28/10<br />F-pod 2nd floor south side<br />
  7. 7. 6/28/10<br />gym<br />
  8. 8. 6/28/10<br />Restrooms 1st floor<br />
  9. 9. 6/30/10GYM<br />
  10. 10. 6/30/10A-POD 1ST FLOOR NORTH SIDE<br />
  11. 11. 6/30/10A-POD 1ST FLOOR NORTH SIDE<br />
  12. 12. 6/30/10DOORS REMOVED NORTH SIDE AT GYM ENTRANCE<br />
  13. 13. 6/30/10E-POD 2ND FLOOR NORTH SIDE STEEL WALL STUDS<br />
  14. 14. 6/30/10F-POD 2ND FLOOR SOUTH SIDE BEGINNING OF INSULATION AND DRYWALL<br />
  15. 15. 6/30/10F-POD 2ND FLOOR SOUTH SIDE <br />
  16. 16. 7/1/10GYM<br />
  17. 17. 7/1/10C-POD 1ST FLOOR SOUTH SIDEPAINTING OF BLOCK WALLS<br />
  18. 18. 7/1/10C-POD 1ST FLOOR SOUTH SIDE<br />
  19. 19. 7/1/10A-POD 1ST FLOOR NORTH SIDEMORE BLOCK WALLS ERECTED<br />
  20. 20. 7/1/10NEW ENTRANCE TO LIBRARY<br />
  21. 21. 7/1/10F-POD 2ND FLOOR SOUTH SIDEDRYWALLING OF ROOMS<br />

×